70 OF 148  CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning

  b. If any violations are found, the applicant  e. Submission of reports. The SMO may
  and developer shall be notified in writing  require monitoring and reporting from
  of the nature of the violation and the  entities subject to this article as are
  required corrective actions. No further  necessary to determine compliance with
  work shall be conducted except for  this article.
  site stabilization until any violations  f. Right-of-entry for inspection. When any
  are corrected and all work previously  new stormwater management facility is
  completed has received approval by the  installed on private property or when any
  SMO.  new connection is made between private
  c. Stormwater management practice  property and the public stormwater
  inspections. The SMO is responsible  system, the landowner shall grant to the
  for conducting inspections of SMPs. All  City the right to enter the property at
  applicants are required to submit as-built  reasonable times and in a reasonable
  plans for any SMPs located on-site after  manner for the purpose of inspection as
  final construction is completed. The plan  specified in § 230-97A(3) of this article.
  must show the final design specifications
  B. Performance guarantee.
  for all stormwater management facilities
  and must be certified by a professional  1.  Construction completion guarantee. In order
  engineer.  to ensure the full and faithful completion of
  all land development activities related to
  d. Inspection of stormwater facilities
  compliance with all conditions set forth by
  after project completion. Inspection
  the City in its approval of the SWPPP, the
  programs shall be established on any
  may require the applicant or developer to
  reasonable basis, including but not
  provide, prior to construction, a performance
  limited to: routine inspections; random
  bond, cash escrow, or irrevocable letter of
  inspections; inspections based upon
  credit from an appropriate financial or surety
  complaints or other notice of possible
  institution which guarantees satisfactory
  violations; inspection of drainage basins
  or areas identified as higher-than-  completion of the project and names the
  typical sources of sediment or other  City as the beneficiary. The security shall
  be in an amount to be determined by the
  contaminants or pollutants; inspections
  City based on submission of final design
  of businesses or industries of a type
  plans, with reference to actual construction
  associated with higher-than-usual
  and landscaping costs. The performance
  discharges of contaminants or pollutants
  guarantee shall remain in force until the
  or with discharges of a type which are
  surety is released from liability by the City,
  more likely than the typical discharge
  provided that such period shall not be
  to cause violations of state or federal
  less than one year from the date of final
  water or sediment quality standards
  acceptance or such other certification that
  or the SPDES stormwater permit; and
  the facility(ies) have been constructed in
  joint inspections with other agencies
  accordance with the approved plans and
  inspecting under environmental or safety
  specifications and that a one-year inspection
  laws. Inspections may include, but are
  has been conducted and the facilities have
  not limited to: reviewing maintenance
  been found to be acceptable to City. Per
  and repair records; sampling discharges,
  annum interest on cash escrow deposits
  surface water, groundwater, and material
  shall be reinvested in the account until the
  or water in drainage control facilities;
  surety is released from liability.
  and evaluating the condition of drainage
  control facilities and other stormwater
  management practices.