Text · page 93 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
70 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning b. If any violations are found, the applicant e. Submission of reports. The SMO may and developer shall be notified in writing require monitoring and reporting from of the nature of the violation and the entities subject to this article as are required corrective actions. No further necessary to determine compliance with work shall be conducted except for this article. site stabilization until any violations f. Right-of-entry for inspection. When any are corrected and all work previously new stormwater management facility is completed has received approval by the installed on private property or when any SMO. new connection is made between private c. Stormwater management practice property and the public stormwater inspections. The SMO is responsible system, the landowner shall grant to the for conducting inspections of SMPs. All City the right to enter the property at applicants are required to submit as-built reasonable times and in a reasonable plans for any SMPs located on-site after manner for the purpose of inspection as final construction is completed. The plan specified in § 230-97A(3) of this article. must show the final design specifications B. Performance guarantee. for all stormwater management facilities and must be certified by a professional 1. Construction completion guarantee. In order engineer. to ensure the full and faithful completion of all land development activities related to d. Inspection of stormwater facilities compliance with all conditions set forth by after project completion. Inspection the City in its approval of the SWPPP, the programs shall be established on any may require the applicant or developer to reasonable basis, including but not provide, prior to construction, a performance limited to: routine inspections; random bond, cash escrow, or irrevocable letter of inspections; inspections based upon credit from an appropriate financial or surety complaints or other notice of possible institution which guarantees satisfactory violations; inspection of drainage basins or areas identified as higher-than- completion of the project and names the typical sources of sediment or other City as the beneficiary. The security shall be in an amount to be determined by the contaminants or pollutants; inspections City based on submission of final design of businesses or industries of a type plans, with reference to actual construction associated with higher-than-usual and landscaping costs. The performance discharges of contaminants or pollutants guarantee shall remain in force until the or with discharges of a type which are surety is released from liability by the City, more likely than the typical discharge provided that such period shall not be to cause violations of state or federal less than one year from the date of final water or sediment quality standards acceptance or such other certification that or the SPDES stormwater permit; and the facility(ies) have been constructed in joint inspections with other agencies accordance with the approved plans and inspecting under environmental or safety specifications and that a one-year inspection laws. Inspections may include, but are has been conducted and the facilities have not limited to: reviewing maintenance been found to be acceptable to City. Per and repair records; sampling discharges, annum interest on cash escrow deposits surface water, groundwater, and material shall be reinvested in the account until the or water in drainage control facilities; surety is released from liability. and evaluating the condition of drainage control facilities and other stormwater management practices.