Draft Local Law for Battery Energy Storage Systems

Government
Town of Wales
Kind
Other
Topics
Energy and data center siting, Zoning and land use, Public safety, Water, sewer and drainage, Budget and taxes, Audits and oversight, Housing

Original document

Text · page 16 of 17

Read the whole document on one page (all 17 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Draft Wales Chapter #197 Battery Energy Storage Systems
  Initial Draft (dated 10/26/26)

  accordance with the decommissioning plan.
  C.  Conditions ina Wales BESS Special Use Permit shall include a provision which requires an
  annual inspection by Town of Wales Officials during the Annual Scheduled SUP Inspection
  Day. Advance notification of the inspection will be provided by the Town Clerk’s Office via
  notice addressed to the designated official for the Tier 2 BESS Site.

  ARTICLE Ill
  FEES

Section 197-11.  Fees

For a Tier 1 BESS, a non-refundable Town of Wales “Battery Energy Storage System (BESS). Permit’
application fee, and a Building Permit Fee shall be due for Tier 1 Battery Energy Storage System
developments. The fees shall be as determined by the Town of Wales's fee and:fines schedule, as
updated from time to time by the Town Board, with all fees paid by the Applicant. “The Code Enforcement
Department and/or the Town Clerk’s office should be consulted by the “Applicant tcto > ngpect the current
Fines and Fees schedule adopted by the Town Board.  eee

For a Tier 2 BESS, a non-refundable application fee, a non-refundable Special Use Permit Fee, an
annual Special Use Permit Inspection fee, and a Building Permit:Feeé shall be:due for Battery Energy
Storage System developments. The fees shall be as determined by the Town of Wales’s fee schedule,
as updated from time to time by the Town Board, with all fees. paid: ‘by the Applicant. The Code
Enforcement Department and/or the Town Clerk’s office should be consulted by the Applicant to inspect
the current Fines and Fees schedule adopted by the Town Board. Due to the complexity and the
specialty skills involved in a Tier 2 BESS, it is presumed ‘that the: Town will employ certain professional
services during review of the applicant's-Special Use Permit and Building Permit submissions. Since
those Professional Engineering and Specialized Consultant activities cannot well defined in advance, the
recovery of costs for those services will be in:accordance with the Time and Materials municipal billing
rates of the engaged professional: It is.also anticipated that there may be disbursements or other direct
costs for the review of applicant submissions by these professionals. Both of these costs will be invoiced
to the applicant, and peimbursed to the Town by. the Applicant, within 60 days.

  “ARTICLE iV
  "ENFORCEMENT AND PENALTIES FOR OFFENSES

Section 197-12: Enforcement  :

 Any violation. of this Battery Energy Storage System (BESS) Law shall be subject to the same
 enforcement requirements, including the civil and criminal penalties, provided for in the zoning or land
 usé regulations of the Town of Wales, and/or if applicable, the relevant regulations of the County of
 Erie or the State of New York.

  ARTICLE V
  SEVERABILITY AND EFFECTIVE DATE

Section 197-13:  Severability and Effective Date

 The invalidity or unenforceability of any section, subsection, paragraph, sentence, clause, provision, or
 phrase of the aforementioned sections, as declared by the valid judgment of any court of competent

 TOWN  OF WALES  ~ BATTERY  ENERGY  STORA