Draft Wales Chapter #197 Battery Energy Storage Systems Initial Draft (dated 10/26/26) ii, Wetlands; ii. Stormwater conveyance systems; iv. Groundwater; and v. Adjacent properties. Containment methods may include grading controls, berms, containment basins, shutoff valves, isolation structures, or other equivalent engineering measures acceptable to the Town. S (d) Emergency Response Coordination The Applicant shall provide documentation demonstrating coordination with the applicable fire department and emergency responders regarding emergency Procedures addpessing i. Thermal runaway events; ii. Fire suppression; iii. Hazardous materialreleases; iv. Off-gassing events; and v. Site access and emergency response protocols; (e) Regulatory Compliance The facility shall comply with all applicable federal, state, and local regulations governing hazardous materials management, spill prevention, environmental protection, and emergency response, including any applicable Spill Prevention, Control, and Countermeasure (SPCC) requirements. (f) Decommissioning fo The Decommissioning: Plan shall address removal, transport, recycling, disposal, and lawful management of batteries, ‘electrolytes, contaminated materials, and any associated hazardous substances. : Section 197-1 0: Permit Time Frame and Abandonment A “The Building Permit associated with the Special Use Permit and site plan approval for a . “battery: energy. storage system shall be valid for a period of 24-months, provided that a building Sh permit i is issued for construction and construction is commenced. In the event construction is “not completed i in accordance with the final site plan and schedules, as may have been amended and approved, as required by the Wales Town Board, within 24-months after approval, the Town Board, at their discretion, may extend the time to complete construction for up to 180-days. If the owner and/or operator fails to perform substantial construction after 36- months, the approvals shail expire. B. The battery energy storage system shall be considered abandoned when it is no longer capable of the storage and delivery of energy to the grid for a period of 12 consecutive months. ifthe owner and/or operator fails to comply with decommissioning upon any abandonment, the Town of Wales may, at its discretion, enter the property and utilize the available bond and/or security for the removal of a Tier 2 Battery Energy Storage System and the full restoration of the site in TOWN OF WALES ~ BATTERY