Draft Local Law for Battery Energy Storage Systems

Government
Town of Wales
Kind
Other
Topics
Energy and data center siting, Zoning and land use, Public safety, Water, sewer and drainage, Budget and taxes, Audits and oversight, Housing

Original document

Text · page 14 of 17

Read the whole document on one page (all 17 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Draft Wales Chapter #197 Battery Energy Storage Systems
  Initial Draft (dated 10/26/26)

  C.  Annual Special Use Permit Inspections. The Town of Wales, during the annual period of
  Special Use Permit inspections, shall access the site and perform an annual site inspection to
  confirm that all provisions of the applicable Special Use Permit are in compliance. The results
  of the annual inspection will be reviewed and either approved or if non-compliance was
  identified not-approved by the Wales Town  Board.  In the event of non-approval,  based upon
  inspection results or other factors, the Town will give the Applicant formal notice with a specific
  timeframe defined for correction of any items of non-compliance with the Special Use Permit
  provisions. A reinspection will be done after remedial action is taken and approved. Lack of
  remedial action by the applicant shall be grounds for revocation of the Special Use Permit per
  procedural mechanisms.  oe

  D.  Battery energy storage systems, components, and associated ancillary equipment shall have
  required working space clearances, and electrical circuitry shall be within weatherproof
  enclosures marked with the environmental rating suitable for the type of exposure in compliance
  with NFPA70 as currently in effect and as hereafter amended:from time to time.  .
  E.  Hazardous Materials Management, Spill Prevention, and Containment
  (a) Hazardous Materials Management Plan Required
  The Applicant shall submit a Hazardous Materials Management.Plan prepared by a
  qualified professional identifying all hazardous materials associated with the Battery
  Energy Storage System (BESS) facility, including but not limited to batteries, electrolytes,
  coolants, transformer oils, fire Suppression agents, and any ancillary hazardous
  substances.
  The Plan shall include:  _  Sy,  *
  i.  Identification and quantities of hazardous materials to be stored on-site;
  ii,  Safety Data, Sheets (SDs) for. applicable materials;
  iii.  Storage methods and containment measures;
  iv. Spill prevention ’procedures:
  v... Emergency notification procedures; and
  vi.  Procedures for handling, cleanup, transport, and disposal of contaminated
  materials.
  (b) Spil Prevention and Secondary Containment
  “The BESS facility shall be designed, constructed, and operated to prevent the release of
  »> hazardous materials to the environment.
  “Where hazardous liquids are present, secondary containment shall be provided in
  s ., accordance with applicable federal, state, and local requirements and shall be designed to
  ~ contain not less than one hundred ten percent (110%) of the volume of the largest
  individual vessel or container, unless otherwise approved by the applicable regulatory
  authority.
  (c)  Firefighting Water and Contaminated Runoff Management
  The Applicant shall demonstrate measures to prevent contaminated runoff, fire
  suppression water, battery electrolyte, or debris resulting from equipment failure, thermal
  events, or emergency response activities from entering:
  i.  Surface waters;