Southtowns Record

Draft Local Law for Battery Energy Storage Systems

Government
Town of Wales
Kind
Other
Topics
Energy and data center siting, Zoning and land use, Public safety, Water, sewer and drainage, Budget and taxes, Audits and oversight, Housing

Original document

Text · page 13 of 17

Read the whole document on one page (all 17 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Draft Wales Chapter #197 Battery Energy Storage Systems
  Initial Draft (dated 10/26/26)

  4.  Screening and Visibility. Tier 2 Battery Energy Storage Systems shall have views minimized from
  adjacent properties to the extent reasonably practicable using architectural features, earth
  berms, landscaping, or other screening methods that will harmonize with the character of the
  property and surrounding area and not interfering with the BESS infrastructure for ventilation
  and cooling or heating exhaust ports.

  5.  AVisual Impact Assessment, prepared by a NYS Licensed Professional Engineer, shall be
  supplied to indicate the impact of the BESS to adjacent parcels as well as from traffic and
  pedestrian use of the roadway.
 J. Ownership Changes:
  if the owner of the battery energy storage system changes or the owner of the property. changes, the
  special use permit shall remain in effect, provided that the successor owner or operator } assumes in
  writing all of the obligations of the special use permit, site plan approval, and. decommissioning pian.
  A new owner or operator of the battery energy storage system shall. notity the Wales Code Enforcement

  owner or operator must provide such notification to the Code Enforcement Department and Wales
  Town Clerk in writing. The special use permit and all other local approvals for the: battery energy
  storage system would be void if a new owner or operator fails to provide 'written notification to the
  Town of Wales in the required timeframe or manner. Reinstatement ofa void special use permit will
  be subject to the same review and approval processes: for an initial new application under this Local
  Law.  =  2

Section 197-9:  Safety Requirements

  A.  System Certification. Battery energy storage systems and equipment shall be listed by a
  Nationally Recognized Testing Laboratory to UL 9540 (Standard for battery energy storage
  systems and Equipment).or: “approved. equivalent, with subcomponents meeting each of the
  following standards as applicable:

  dp  UL 1973 (Standard for: Batteries for Use in Stationary, Vehicle Auxiliary Power and
  =  Light Electric Rail Applications),
  ie  UL 1642 (Standard for Lithium Batteries),
  : _. li,  UL 1741 or UL 62109 (Inverters and Power Converters),

  v. Certified  under  the  applicable  electrical,  building,  and  fire
  prevention codes as required.

  v.  Alternatively, field evaluation by an approved testing laboratory for
  compliance with UL 9540 (or approved equivalent) and applicable
  codes, regulations and safety standards  may  be used to meet
  system certification requirements.
  B.  Site Access. Battery energy storage systems shall be maintained in good working order and in
  accordance with industry standards. Site access shall be maintained, including snow removal at
  a level acceptable to the Wales Fire Company and other First Responders. Additionally, for
  Tier 2 Battery Energy Storage System site access shail be subject to the requirements of the
  Town of Wales EMS Service as well as the County of Erie EMS crews located at the Wales
  Fire Company site. Periodic inspections by the EMS forces shail be performed to confirm
  compliance with their needs.

 TOWN  OF WALES  ~ BATTERY  ENERGY STORAGE  SYSTEMS  te 3