Text · page 12 of 17
Read the whole document on one page (all 17 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Draft Wales Chapter #197 Battery Energy Storage Systems Initial Draft (dated 10/26/26) (b) Procedures for inspection and testing of associated alarms, interlocks, and controls. (c) Procedures to be followed in response to notifications from the Battery Energy Storage Management System, when provided, that could signify potentially dangerous conditions, including shutting down equipment, summoning service and repair personnel, and providing agreed upon notification to fire department personnel for potentially hazardous conditions in the event of a system failure. (d) Emergency procedures to be followed in case of fire, explosion, release of liquids or vapors, damage to critical moving parts, or other potentially dangerous conditions. Procedures can include sounding the alarm, notifying the fire department, evacuating personnel, de-energizing equipment, and controlling and extinguishing the fire. (e) Response considerations similar to a safety data sheet (SDS) that will address . response safety concerns and extinguishment when an SDS is notrequired. (f) Procedures for dealing with battery energy storage system equipment damaged in a fire or other emergency event, including maintaining contact information for personnel qualified to safely remove damaged battery energy y storage system equipment from the facility. (g) Other procedures as determined necessary) by the Town of Wales to provide for the safety of occupants, neighboring properties, and emergency responders. (h) Procedures and schedules for conducting drilts of these procedures and for training local first responders on the contents of the plan and: appropriate response procedures. 1. Special Use Permit Standards. 1. Setbacks. Tier 2 Battery Energy Storage Systems are only permitted in Ag-Zoning districts and shall have a front setback no less than 300’ from the edge of the road frontage Right boundary lines. The rear “yard setback shall be no less than 100’ from the parcel’s rear boundary line. For: all situations. the site. plan shall take into account neighboring dwellings and/or commercial structures: which are considered by this Chapter as non-participating entities. The ‘distance from the-applicant’s BESS structure(s) to the nearest non- participating entity,on all nearby parcels shall always meet a structure-to-structure distance of at least a 200 feet> During. the Town of Wales’ s Site Plan review process, based upon unique project site layouts, the Planning Board advisory recommendations, and the Town Board’s action(s) may: require: additional setback distances for justifications related to the parcel geometry, néarby neighbors, conflicting land use, nearby dwellings or structures, and other relevant ~ factors, including, but not limited to, noise criteria. In all cases the predicted and - measured noise level at the parcel’s boundary lines shall meet the dB requirements of this Chapter. Height. Tier 2 Battery Energy Storage Systems shall comply with the building height limitations for principal structures of the underlying Ag-Zoning district. Fencing Requirements. Tier 2 Battery Energy Storage Systems, including all mechanical equipment, shall be enclosed by a 7-foot-high security fence with a self-locking gate to prevent unauthorized access, unless housed in a dedicated-use building with a structure and design so as to not interfere with ventilation or exhaust ports required for safe operations. POWN OF WALES ~ BAS