Text · page 11 of 17
Read the whole document on one page (all 17 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Draft Wales Chapter #197 Battery Energy Storage Systems Initial Draft (dated 10/26/26) and/or operator of the battery energy storage system. Such information of the final system installer shall be submitted prior to the issuance of building permit. 6. Name, address, phone number, and signature of the project Applicant, as well as all the property owners, demonstrating their consent to the application and the use of the property for the battery energy storage system. 7. Zoning district designation for the parcel(s) of land comprising the project site. 8. Commissioning Plan. Such plan shall document and verify that the system andits associated controls and safety systems are in proper working condition per requirements set forth in the Uniform Code. Where commissioning is required by the Uniform Code, Battery energy storage system commissioning shall be conducted by a New York State(NYS) Licensed Professional Engineer (P.E.) after the installation is complete but priorto final inspection and approval: A corrective action plan shall be developed for any open or continuing issues that are allowed to be continued after commissioning. A report describing the results of the system commissioning and including the results of the initial acceptance testing required in the Uniform Code shall be provided to the Wales Code Enforcement Department and Wales Planning Board: for advisory recommendations and conditions prior to action by the Wales Town: Board: prior to final inspection and approval. The report shall be submitted to the Town. and an identical copy maintained at an approved on-site location. . oe 9. Fire Safety Compliance Plan. Such plan. shall document d and verify that the system and its associated controls and safety systems are:in compliance with the Uniform Code. The Plan should clearly indicate compliance with all provision of the NFPA, including methods and means for the supply of adequate water for potential fire “suppression of the structure itself, and non-battery materials needed by Wales First Responders and the Wales Fire Company. Full compliance with the requirements, procedures, and documentation in accordance with NYS Uniform: Fire NFPA 855 shall be included in the plan. 10. Operation and: Maintenance: Manual. ‘Such plan shail describe continuing battery energy installation, testing and commissioning information and shall meet alll requirements set forth in. the Uniform, Code. 11. Erosion and sediment control and storm water management plans prepared to New York State Department of Environmental Conservation standards, ifapplicable, and to such standardsas may be established by the Planning Board. oe 42. “Prior to: the issuance of the building permit or final approval by the Wales Town Board, but not SE required as part: of the application, engineering documents must be signed and sealed by aNYS me Licensed Professional Engineer. 13. Emergency Operations Plan. A copy of the approved Emergency Operations Plan shail be givento the system owner, the local fire department, and local fire code official. A permanent copy shail also be placed in an approved location to be accessible to facility personnel, fire code officials, and emergency responders. The emergency operations plan shall include the following information: (a) Procedures for safe shutdown, de-energizing, or isolation of equipment and systems under emergency conditions to reduce the risk of fire, electric shock, and personal injuries, and for safe start-up following cessation of emergency conditions. TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS VW