Southtowns Record

Draft Local Law for Battery Energy Storage Systems

Government
Town of Wales
Kind
Other
Topics
Energy and data center siting, Zoning and land use, Public safety, Water, sewer and drainage, Budget and taxes, Audits and oversight, Housing

Original document

Text · page 11 of 17

Read the whole document on one page (all 17 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Draft Wales Chapter #197 Battery Energy Storage Systems
  Initial Draft (dated 10/26/26)

  and/or operator of the battery energy storage system. Such information of the final system
  installer shall be submitted prior to the issuance of building permit.
  6.  Name, address, phone number, and signature of the project Applicant, as well as all the
  property owners, demonstrating their consent to the application and the use of the property for
  the battery energy storage system.
  7.  Zoning district designation for the parcel(s) of land comprising the project site.

  8.  Commissioning Plan. Such plan shall document and verify that the system andits associated
  controls and safety systems are in proper working condition per requirements set forth in the
  Uniform Code. Where commissioning is required by the Uniform Code, Battery energy storage
  system commissioning shall be conducted by a New York State(NYS) Licensed Professional
  Engineer (P.E.) after the installation is complete but priorto final inspection and approval: A
  corrective action plan shall be developed for any open or continuing issues that are allowed to be
  continued after commissioning. A report describing the results of the system commissioning and
  including the results of the initial acceptance testing required in the Uniform Code shall be provided
  to the Wales Code Enforcement Department and Wales Planning Board: for advisory
  recommendations and conditions prior to action by the Wales Town: Board: prior to final
  inspection and approval. The report shall be submitted to the Town. and an identical copy
  maintained at an approved on-site location. .  oe

  9.  Fire Safety Compliance Plan. Such plan. shall document
  d  and verify that the system and its
  associated controls and safety systems are:in compliance with the Uniform Code. The Plan
  should clearly indicate compliance with all provision of the NFPA, including methods and
  means for the supply of adequate water for potential fire “suppression of the structure itself,

  and non-battery materials needed by Wales First Responders and the Wales Fire
  Company.  Full compliance with the requirements, procedures, and documentation in
  accordance with NYS Uniform: Fire NFPA 855 shall be included in the plan.
  10. Operation and: Maintenance: Manual. ‘Such plan shail describe continuing battery energy

  installation, testing and commissioning information and shall meet alll requirements set
  forth in. the Uniform, Code.
  11. Erosion and sediment control and storm water management plans prepared to New York State
  Department of Environmental Conservation standards, ifapplicable, and to such standardsas may be
  established by the Planning Board.
oe 42. “Prior to: the issuance of the building permit or final approval by the Wales Town Board, but not
  SE  required as part: of the application, engineering documents must be signed and sealed by  aNYS
  me Licensed Professional Engineer.
  13. Emergency Operations Plan. A copy of the approved Emergency Operations Plan shail be
  givento the system owner, the local fire department, and local fire code official. A permanent
  copy shail also be placed in an approved location to be accessible to facility personnel, fire
  code officials, and emergency responders. The emergency operations plan shall include the
  following information:
  (a) Procedures for safe shutdown, de-energizing, or isolation of equipment and systems
  under emergency conditions to reduce the risk of fire, electric shock, and personal
  injuries, and for safe start-up following cessation of emergency conditions.

 TOWN OF WALES ~ BATTERY  ENERGY STORAGE  SYSTEMS  VW