Draft Local Law for Battery Energy Storage Systems

Government
Town of Wales
Kind
Other
Topics
Energy and data center siting, Zoning and land use, Public safety, Water, sewer and drainage, Budget and taxes, Audits and oversight, Housing

Original document

Text · page 10 of 17

Read the whole document on one page (all 17 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Draft Wales Chapter #197 Battery Energy Storage Systems
  Initial Draft (dated 10/26/26)

  (d) The estimated decommissioning costs and how said estimate was determined;
  (e) The method of ensuring that funds will be available for decommissioning and restoration;
  (f)  The method by which the decommissioning cost will be kept current;
  (g) The manner in which the site will be restored, including a description of how any
  changes to the surrounding areas and other systems adjacent to the battery energy
  storage system, such as, but not limited to, structural elements, building
  penetrations, means of egress, and required fire detection suppression systems, will
  be protected during decommissioning and confirmed as being acceptable after the
  system is removed; and
  (h) A listing of any contingencies for removing an intact operational energy storage
  system from service, and for removing an energy storage syetem from service that
  has been damaged by a fire or other event.
  (i)  The Plan shall illustrate that the decommissioning costs ‘are properly covered in the
  applications submission of a bond in an amount adequate to: fully cover decommissioning
  costs, including remediation and restoration. of.land to the pre-BESS condition(s).  The
  value of the bond evaluated every 5 years: for covering estimated costs and the amount
  of the bond must be adjusted in the event that the ‘bond value no longer covers a realistic
  decommissioning/remediation cost going forward in time The bond must be in a form
  and means acceptable to the Wales Town. Attorney, including provisions defined for
  liquidation of the bond by the Town when necessary.
  2.  Decommissioning Fund. The owner and/or Operator ofthe energy storage system, shall
  continuously maintain a fund or bond payable tothe Town of Wales, in a form approved by the
  Town for the removal of the battery energy storage. system, in an amount to be determined by the
  Town of Wales, for the period of the life of the facility. This fund may consist of a letter of credit
  from a State of New York licensed-financial institution. All costs of the financial security shall be
  borne by the applicant.”  oe  se

H. Site plan application:  All Tier 2 Battery Energy Storage Systems shall require a Special Use Permit,
  and site plan approval shallbe required, relevant submissions under NYS SEQRA, and including
  submission of any and all supplemental data, design details, and drawings which are requested by
  the Town of. Wales Planning Board, the Wales's Town Engineer, or the Wales Town Board before an
  application is deemed complete and ready for ultimate action by the Town Board. Any site plan
  application: shall include, asa minimum, the following information:
  1 * Property lines and. -physical features, including roads, for the project site on a survey produced,
  signed and sealed, by a licensed NYS licensed Registered Professional Land Surveyor (RPLS).
  2. . Proposed changes to the landscape of the site, grading, vegetation clearing and planting,
  - ‘exterior lighting, and screening vegetation or structures.

  3.  A three-line electrical diagram detailing the battery energy storage system layout, associated
  components, and electrical interconnection methods, with all National Electrical Code compliant
  disconnects and over current devices.

  4.  Apreliminary equipment specification sheet that documents the proposed battery energy
  storage system components, inverters and associated electrical equipment that are to be
  installed. A final equipment specification sheet shall be submitted prior to the issuance of
  building permit.
  5.  Name, address, and contact information of proposed or potential system installer and the owner