Text · page 10 of 17
Read the whole document on one page (all 17 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Draft Wales Chapter #197 Battery Energy Storage Systems Initial Draft (dated 10/26/26) (d) The estimated decommissioning costs and how said estimate was determined; (e) The method of ensuring that funds will be available for decommissioning and restoration; (f) The method by which the decommissioning cost will be kept current; (g) The manner in which the site will be restored, including a description of how any changes to the surrounding areas and other systems adjacent to the battery energy storage system, such as, but not limited to, structural elements, building penetrations, means of egress, and required fire detection suppression systems, will be protected during decommissioning and confirmed as being acceptable after the system is removed; and (h) A listing of any contingencies for removing an intact operational energy storage system from service, and for removing an energy storage syetem from service that has been damaged by a fire or other event. (i) The Plan shall illustrate that the decommissioning costs ‘are properly covered in the applications submission of a bond in an amount adequate to: fully cover decommissioning costs, including remediation and restoration. of.land to the pre-BESS condition(s). The value of the bond evaluated every 5 years: for covering estimated costs and the amount of the bond must be adjusted in the event that the ‘bond value no longer covers a realistic decommissioning/remediation cost going forward in time The bond must be in a form and means acceptable to the Wales Town. Attorney, including provisions defined for liquidation of the bond by the Town when necessary. 2. Decommissioning Fund. The owner and/or Operator ofthe energy storage system, shall continuously maintain a fund or bond payable tothe Town of Wales, in a form approved by the Town for the removal of the battery energy storage. system, in an amount to be determined by the Town of Wales, for the period of the life of the facility. This fund may consist of a letter of credit from a State of New York licensed-financial institution. All costs of the financial security shall be borne by the applicant.” oe se H. Site plan application: All Tier 2 Battery Energy Storage Systems shall require a Special Use Permit, and site plan approval shallbe required, relevant submissions under NYS SEQRA, and including submission of any and all supplemental data, design details, and drawings which are requested by the Town of. Wales Planning Board, the Wales's Town Engineer, or the Wales Town Board before an application is deemed complete and ready for ultimate action by the Town Board. Any site plan application: shall include, asa minimum, the following information: 1 * Property lines and. -physical features, including roads, for the project site on a survey produced, signed and sealed, by a licensed NYS licensed Registered Professional Land Surveyor (RPLS). 2. . Proposed changes to the landscape of the site, grading, vegetation clearing and planting, - ‘exterior lighting, and screening vegetation or structures. 3. A three-line electrical diagram detailing the battery energy storage system layout, associated components, and electrical interconnection methods, with all National Electrical Code compliant disconnects and over current devices. 4. Apreliminary equipment specification sheet that documents the proposed battery energy storage system components, inverters and associated electrical equipment that are to be installed. A final equipment specification sheet shall be submitted prior to the issuance of building permit. 5. Name, address, and contact information of proposed or potential system installer and the owner TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS 1