Draft Wales Chapter #197 Battery Energy Storage Systems Initial Draft (dated 10/26/26) 62 days of the public hearing, which can include approval, approval with conditions, or denial. The 62-day period may be extended upon consent by both the Town Board and the Applicant. B. Utility Lines and Electrical Circuitry. All on-site utility lines shall be placed underground to the extent feasible and as permitted by the serving utility, with the exception of the main service connection at the utility company right-of-way and any new interconnection equipment, including without limitation any poles, with new easements and right-of-way. C. BESS Signage. 1. The signage shall be in compliance with ANSI Z535 and shall include the type of technology associated with the battery energy storage systems, any special hazards associated, the type of suppression system installed in the area of battery energy-storage systems, and 24- hour emergency contact information, including reach-back phone: number, 2. As required by the NEC, disconnect and other emergency shutoff information shall be clearly displayed on a light reflective surface. A clearly visible warning:sign concerning voltage shall be placed at the base of all pad-mounted transformers and ‘substations. D. Lighting. Lighting of the battery energy storage systems shall be limited to that . minimally required for safety and operational purposes and shall be (easonably shielded and downcast from abutting properties. es : E. Vegetation and tree-cutting. Areas within. 50. feet on: each side of Tier 22 Battery Energy Storage Systems shall be cleared of combustible: vegetation and other combustible growth. Single specimens of trees, shrubbery, or cultivated ground cover such as green grass, ivy, succulents, or similar plants used as ground covers shall be permitted to be exempt provided that they do not form a means of readily transmitting fire. Removal: of trees should be minimized to the extent possible. : F. Noise. The 1-hour average noise generated from the battery energy storage systems, components, and associated ancillary equipment shall not exceed a noise level of 60 dBA as measured at the’ property line / boundary line of any non-participating residence or occupied community building adjoining. or adjacent parcel. Applicants may submit equipment and component manufacturers noise ratings to demonstrate compliance and a NYS Licensed Professional Engineer certification is supplied which indicates that the manufacturer's ratings are technically valid and applicable for the specific site plan of the BESS project. The applicant may.be required to provide Operating Sound Pressure Level measurements from a reasonable number of sampled locations at the parcel’s perimeter of the battery energy storage system to demonstrate compliance with this standard. 9 ~ G, ‘Decominissi i “4. Decommissioning Plan. The applicant shall submit a decommissioning plan, developed in “accordance with the Uniform Code, to be implemented upon abandonment and/or in conjunction with removal from the facility. The decommissioning plan shall include: (a) Anarrative description of the activities to be accomplished, including who will perform that activity and at what point in time, for complete physical removal of all battery energy storage system components, structures, equipment, security barriers, and transmission lines from the site; (b) Disposal of ail solid and hazardous waste in accordance with local, state, and federal waste disposal regulations; (c) The anticipated life of the battery energy storagesystem; TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS g