Draft Wales Chapter #197 Battery Energy Storage Systems
  Initial Draft (dated 10/26/26)

  Professional Land Surveyor.
  (c)  Matters relating to the proposed battery energy storage system characteristics,

  (d) Floodplain,
  (e) Utility Lines,
  (f)  Electrical Circuitry,

  (g) Signage,
  (h) Lighting,
  (i)  Vegetation and Tree cutting,
  (j)  Noise,  a
  (k) Vehicles plan with entry and egress provisions clearly shown,
  (l)  Traffic Assessment, including Prediction studies for Traffic Volume and Traffic
  Vehicle Size, as determined to be necessaryyby the, Town:  Sh,

  years for covering estimated costs and the amount of: the bond must be
  adjusted in the event that the bond value.no longer covers a realistic
  decommissioning/remediation ‘cost going forward in time The bond must be  in
  a form and means acceptable to the Wales Town Attorney, including
  provisions defined for liquidation of. the bond ‘by the Town when necessary.
  (n) SitePlan during Development,
  (0) Site Plan at completion Post-Commissioning
  (p) Special Use Permit Compliance, - :
  (q) Development Schedule of Project Milestones,

  (n). Ownership Changes: as applicable or planned,

  6ss) Safety,  ~
  0)  Permit Time Frame for project start and completion,

  | < z w ): Abandonment and Contingency Plans.

  ° Applicants shall be advised within 45 business days of the completeness of their
  application, or of any deficiencies that must be addressed prior to substantive review.
  2. Be subject to a public hearing to hear all comments for and against the application. The
  Town Board of the Town of Wales shall have a notice printed in a newspaper of general
  circulation in the Town at least 10 days in advance of such hearing. Applicants shall have
  delivered the notice by first class mail to adjoining landowners or landowners within 1,000
  feet of the property at least 14 days priorto such a hearing. Proof of mailing shail be provided
  to the Town Board at the public hearing.
  3.  Referral to the Erie County Department of Environment and Planning pursuant to General
  Municipal Law § 239-m.
  4.  Upon closing of the public hearing, the Town Board shall take action on the application within

OWN  OF WALIES  ~ BATTERY  ENERGY  STORAGE  SYSTEMS