Draft Wales Chapter #197 Battery Energy Storage Systems Initial Draft (dated 10/26/26) XXxXil. An approved energy management system shall be provided for battery technologies other than lead-acid and nickel cadmium for monitoring and balancing cell voltages, currents, and temperatures within the manufacturer's specifications. The system shall transmit an alarm signal to an approved location if potentially hazardous temperatures or other conditions such as short circuits, over voltage or under voltage are detected. h. Structural Requirement Compliance: i. If the battery energy storage system is wall mounted and its weight is more than 200 pounds, provide structural details in: the drawings and calculations as a separate document (Uniform Cede). © il. If multiple battery energy storage systems are:installed and the combined weight is 400 pounds or more, provide structural details in the drawings and calculations as a separate document (Uniform Code). 2. Utility Lines and Electrical Circuitry. All on-site utility lines shall be placed underground to the extent feasible and as permitted: by the. serving utility, especially in the case of residential or commercial sites which require’new or upgraded infrastructure from the serving utility. Exceptions are allowed for the main disconnect, if any, at the utility company. right-of-way and any new interconnection equipment, including without limitation any. Poles, with new easements and right-of- way. one oe SS . 3. Signage. No permanent BESS signage s at the rode. or in or near the roadway right of way is permitted, with the exception of temporary promotional advertisement for the project contractor during, or immediately following the site’s commissioning. The presence of any promotional signis. limited to 60 days after approval and closeout of the Town: of Wales permits. Section 197-8: Permitting Reauiterents for Tier 2 Battery Energy Storage Systems (> 600kWh) Tier 2 Battery Energy: Storage systems are permitted only through the issuance of a Special Use Permit and may. only be considered within the Agricultural (Ag) zoning district. Tier 2 BESS projects are larger, potentially Utility-Scale Systems, and shall be subjectto the Uniform Code and the: tigorous site plan review and application requirements set forth in this Section. Tier 2 applications via Special Use Permits, must be in full compliance with all submission requirements before they shall. be considered a “complete application” by the reviewing agencies in Wales. A Applications for. the installation of Tier 2 Battery Energy Storage System shall be: 4, Reviewed by the Code Enforcement Department, the Wales Planning Board, and the oe Wales Environmental Board for completeness. An application shall be deemed “complete when it addresses ail matters listed in this Local Law including, but not necessarily limited to, (a) Supply of a professional land survey, showing all parcels involved with the project with nearby adjoining parcels indicated clearing showing the location of buildings and dwellings on those adjoining parcels. The survey must be signed and sealed by a NYS licensed Professional Land Surveyor. (b) Compliance with all applicable provisions of the Uniform Code and all applicable provisions of the Energy Code confirmed by a NYS Licensed design professional, such as a Professional Engineer, a Registered Architect, or a TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS