Text · page 4 of 17
Read the whole document on one page (all 17 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Draft Wales Chapter #197 Battery Energy Storage Systems Initial Draft (dated 10/26/26) Section 197-4. USE DISTRICTS AND BATTERY ENERGY STORAGE SYSTEM (BESS) CATEGORIES & AUTHORITY: For the Town of Wales, the following categories of use and general permitting characteristics are tabulated in the Town of Wales Zoning Chapter 200, which defines Permitted Principal and Accessory Uses for each Zoning District. For each Zoning District the Zoning Chapter 200 the permitted land use for Battery Energy Storage Systems is recited. Chapter 200 should be consulted for that information in the relevant sections for Residential (R1 & R2 & RRB), Commercial (C), or Agricultural (Ag) Zoning Districts within the Town. Section 197-5: Applicability A. The requirements of this Local Law shall apply to all battery energy storage systems - permitted, installed, or modified in the Town of Wales after the effective date: -of this Local: Law, excluding general routine maintenance and repair. : B. Battery energy storage systems constructed or installed priorto. the effective ‘date of this Local Law shall not be required to meet the requirements, of this Local Law unless modified or altered. AE 7 ‘. C. Modifications to, retrofits, or replacements of an existing battery energy e wy storage system that increase the total battery energy storage system designed discharge duration or power rating shall be subject to this Local Law. Section 197-6: General Criteria and Requirements”: A. Abuilding permit and an electrical inspection/approval shall be required for installation of ail battery energy storage systems. = B. Issuance of permits and-approvals by the Wales Code Enforcement Officers, and the Wales Town Board after consideration of delegated advisory reports from the Wales Planning Board and Wales: Environmental Board, shail include review pursuant to the State Environmental Quality Review Act ECL Article 8 and its implementing regulations at 6 NYCRR Part 617 (‘SEQRA’) as currently in effect and as hereafter amended from time to time. The Wales Town Board will act as Lead Agency during the SEQRA procedures. C. All battery energy storage systems, all Dedicated Use Buildings, and all other buildings or structures: that: ce 1) Contain or: are otherwise associated with a battery energy storage system and . 2 Subject. to the Uniform Code and/or the Energy Code shall be designed, erected, and __ installed:in accordance with all applicable provisions of the Uniform Code, all applicable ~- provisions of the Energy Code, and all applicable provisions of the codes, regulations, and » industry standards as referenced in the Uniform Code, the Energy Code, and the Town of “., Wales Code. ARTICLE Il PERMIT REQUIREMENTS Section 197-7: Permitting Requirements for Tier 1 Battery Energy Storage Systems (s 600 kWh) Tier 1 Battery Energy Storage Systems shall be permitted in all zoning districts, subject to the Town of Wales Uniform Code “Battery Energy Storage System (BESS) Permit’. Tier 1 BESS are less than or TOWN OF WALES