Text · page 5 of 17
Read the whole document on one page (all 17 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Draft Wales Chapter #197 Battery Energy Storage Systems Initial Draft (dated 10/26/26) equai to 600 kWh capacity, are generally exempt from site plan review, since Tier 1 systems are smaller residential or small commercial systems for homes and businesses and they are processed by the Wales BESS Permit and the related Town of Wales Building Permits. This procedure is via the Town of Wales Code Enforcement Department. It is anticipated that most, if not all, residential and commercial installations of a Tier 1 BESS will be designed, installed, and commissioned by a professional contractor which has expertise and design experience to supply suitable technical and engineering details for review by the Town of Wales staff. It is assumed that submissions will be prepared by a NYS Licensed Design Professional (Professional Engineer, Registered Architect, Professional Land Surveyor, etc.). To have the Tier 1 Application process be efficient, and non- piecemeal, submissions of Tier 1 BESS applications the submittal requirements are:presented in summary below for Tier 1 installations less than or equal to 600 kWh capacity. . © The submitted Applications for the installation of Tier 1 Battery Energy Storage System shall be: 1. Reviewed by the Code Enforcement Department for completeness. in some circumstances the Code Enforcement Department may make a referral to the complete when it addresses all matters listed in this Local Law including, but not necessarily limited to, a. Include a legend or key for the site and floor plan with equipment symbols, b. The site plan shall include a professional survey, signed and sealed by a licensed NYS Professional Land Surveyor, with. markings | to show: i. The location of the structure and the location where the system is to be installed. ii Show conduit/cable. routing of battery energy storage system. iii. Include underground trench detail, if applicable. iv. Show overhead runs, if applicable: Vv. Show method and location of required ventilation equipment (if required) for indoor installations. c. Identify the total number of: batteries for the BESS and location on the site plan andd floor plan. , a ‘New equipment for the battery energy storage system. a Existing equipment for interconnection. iti. ; Show required working clearances for all existing/new electrical equipment. . Sy iv. Show whether the equipment is to be installed indoors or outdoors. “ve. Show method and location of requirement ventilation equipment (if ~ required) for indoor installations. yi. Show method of protection from physical damage for the battery energy storage system. vii. Show means of access to battery energy storage system. Vii. Denote whether conductors are routed indoors or outdoors. e. Provide an elevation drawing of the system equipment and specify elevation in relation to flood plains. i. If the house is in a flood zone, it shall be above base flood elevation. f. Provide supporting documents from manufacturer if equipment is subject to physical damage. g. Electrical Compliance Confirmation, to include but not limited to: i. Installations shall be in compliance with the Battery Energy Storage TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS