Southtowns Record

11/10/26 Board Packet

Government
Village of Gowanda
Board
Village Board
Meeting
Nov 10, 2026
Kind
Agenda packet
Topics
Public safety, Water, sewer and drainage, Budget and taxes, Parks and recreation, Roads and traffic, Audits and oversight, Zoning and land use

Original document

Text · page 42 of 68

Read the whole document on one page (all 68 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

a=
  Vv —\
  CONSTRUCTION

Michael C. Galley, PMP
Project Manager, Construction
Wendel
Centerpointe Corporate Park
375 Essjay Road, Suite 200
Williamsville, New York 14221

Gowanda Town Hall ~ Window Replacement

Mike,
Thank you for an opportunity to pull together pricing on this work.  We are pleased to provide you a breakdown of
pricing and scope as follows:

Scope of work included:  1
  Field measure existing RO’s, once RO’s established by others.  .
  Installation of plywoad temp enclosures for weather “sealing” during fabrication leadtime
  Installation of Kolbe aluminum clad wood window with simulated divided lites.
  Caulking of new windows in openings
  Final clean inside, and outside and make repairs to lawn as necessary.

We propose to complete said work for a lump sum of $55,400.00.

Exclusions:
  Taxes, bonds, permits
  Any and ail asbestos or haz mat work, and any/all demo of windows as that work must be performed as ACM.
  Any work associated with structural efforts
  Any work associated with the backup of brick fagade (it appears the interior is some assembly of triple wythe speed
  tile with plaster atop). We strictly include the brick facade of the building.
  We exclude any ACM work beyond removing windows, and this includes speedtile/tar and any associate plaster etc.
  We exclude any patchwork on the inside of the building
  ©  There is a number of stress cracks in the building from existing conditions, we cannot foresee or prevent if
  any plaster sheers off the walls during our work as we don’t know if the existing condition is “hollow”
  behind the plaster bond. As such we exclude repairs to plaster should anything sheer. [n addition, the
  jambs of the windows interior may sheer as a result of the abatement, movement in speed tile or just
  anchoring the windows. We specifically exclude any/all plaster repair and recommend that work be done
  T&M to minimize potential cost impact upfront.
  Leadtime on windows is approximately 12 weeks from date of release. We anticipate an uninsulated plywood
  enclosures while we await windows after ordering.