Text · page 43 of 68
Read the whole document on one page (all 68 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
m= Vv =) CONSTRUCTION Michael C. Galley, PMP Project Manager, Construction Wendel Centerpointe Corporate Park 375 Essjay Road, Suite 200 Williamsville, New York 14221 Gowanda Town Hall ~ Masonry Restoration — North Elevation Mike, Thank you for an opportunity to pull together pricing on this work. We are pleased to provide you a price to provide masonry pointing as noted below to the North elevation of the aforementioned projcet: Scope of work included: * Repoint cracked or missing mortar co North elevation ~ 300 total sf Patch column caps on North elevation (excluding gargoyles). Replace Lintels on 2™ floor windows north elevation oa Note that this scope of work cannot happen unless the windows are either replaced, or the added scope of removing/reinstalling existing is added to this scope as the lintels have hot caulk on them. Remove and reset existing stone at window heads on north elevation at lintel replacement. Clean and seal all brick which has been reworked (appx 300sf) on north elevation. * Price excludes any other elevation(s), and does not include corners of north elevation (only faceward). The following is a breakdown of pricing: North Elevation Masonry Restoration: $70,000.00 The aforementioned work will also require an unknown amount of asbestos work in order to complete the window lintel replacement as we believe the tar on the inside face of the speedtile willbe impacted by our work. We will work with the team to develop a work plan that can be coordinated, but in order for us to perform the aforementioned work we suggest establishing an allowance of $15,000.00 to be used for asbestos, and scope to be developed with the team. Exclusions: e Taxes, bonds, permits * — Chimneys on building * — Any work associated with structural efforts * — Any work associated with the backup of brick facade (it appears the interioris some assembly of triple wythe speed tile with plaster atop). We strictly include the brick fagade of the building. * — Asbestos work: there appears to be asbestos on the window caulk as well asa mastic coating of tar on the speedtile. That may take some additional coordination and may involve additional costs. *® Note that this work will take APPOXIMATELY 2 weeks of ideal weather conditions in order to complete the masonry work. In addition, we expect another week to demobilize from the site, and 1 week from approvals to mobilize. Ata minimum, we believe this work will be a total duration of 4 weeks, and we will do our best to mobilize immediately but mobilization is contingent on how quickly we receive an approval and if our masons are able to break free from their current work immediately thereafter. Rochester 2575 Baird Road, Penfield, NY 14526 | Ph: 585.381.9970 + Fax: 585.381.0082 Buffalo 425 Franklin Street, Buffalo, NY 14202 | Ph: 716.955.9993 www, javen.com