Southtowns Record

11/10/26 Board Packet

Government
Village of Gowanda
Board
Village Board
Meeting
Nov 10, 2026
Kind
Agenda packet
Topics
Public safety, Water, sewer and drainage, Budget and taxes, Parks and recreation, Roads and traffic, Audits and oversight, Zoning and land use

Original document

Text · page 43 of 68

Read the whole document on one page (all 68 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

m=
  Vv =)
  CONSTRUCTION

Michael C. Galley, PMP
Project Manager, Construction
Wendel
Centerpointe Corporate Park
375 Essjay Road, Suite 200
Williamsville, New York 14221

Gowanda Town Hall ~ Masonry Restoration — North Elevation

Mike,
Thank you for an opportunity to pull together pricing on this work.  We are pleased to provide you a price to
provide masonry pointing as noted below to the North elevation of the aforementioned projcet:

Scope of work included:
  *  Repoint cracked or missing mortar
  co  North elevation ~ 300 total sf
  Patch column caps on North elevation (excluding gargoyles).
  Replace Lintels on 2™ floor windows north elevation
  oa  Note that this scope of work cannot happen unless the windows are either replaced, or the
  added scope of removing/reinstalling existing is added to this scope as the lintels have hot caulk
  on them.
  Remove and reset existing stone at window heads on north elevation at lintel replacement.
  Clean and seal all brick which has been reworked (appx 300sf) on north elevation.
  *  Price excludes any other elevation(s), and does not include corners of north elevation (only faceward).

The following is a breakdown of pricing:
North Elevation Masonry Restoration: $70,000.00

The aforementioned work will also require an unknown amount of asbestos work in order to complete the window
lintel replacement as we believe the tar on the inside face of the speedtile willbe impacted by our work. We will
work with the team to develop a work plan that can be coordinated, but in order for us to perform the
aforementioned work we suggest establishing an allowance of $15,000.00 to be used for asbestos, and
scope to be developed with the team.

Exclusions:
  e  Taxes, bonds, permits
  * — Chimneys on building
  * — Any work associated with structural efforts
  * — Any work associated with the backup of brick facade (it appears the interioris some assembly of triple wythe speed
  tile with plaster atop). We strictly include the brick fagade of the building.
  * — Asbestos work: there appears to be asbestos on the window caulk as well asa mastic coating of tar on the speedtile.
  That may take some additional coordination and may involve additional costs.
  *®  Note that this work will take APPOXIMATELY 2 weeks of ideal weather conditions in order to complete the masonry
  work. In addition, we expect another week to demobilize from the site, and 1 week from approvals to mobilize. Ata
  minimum, we believe this work will be a total duration of 4 weeks, and we will do our best to mobilize immediately
  but mobilization is contingent on how quickly we receive an approval and if our masons are able to break free from
  their current work immediately thereafter.