Text · page 44 of 68
Read the whole document on one page (all 68 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
a= v=) CONSTRUCTION Michael C. Galley, PMP Project Manager, Construction Wendel Centerpointe Corporate Park 375 Essjay Road, Suite 200 Williamsville, New York 14221 Gowanda Town Hall — Window Replacement — Demo and Abatement Scope Mike, Thank you for an opportunity to pull together pricing on this work. We are pleased to provide you a breakdown of pricing and scope as follows: Scope of work included: e® Abate windows from existing openings e Final clean inside, and outside and make repairs to lawn as necessary. We propose to complete said work for a lump sum of $37,600.00. Exclusions: * Taxes, bonds, permits * — Any work associated with structural efforts * — Any work associated with the backup of brick facade (it appears the interior is some assembly of triple wythe speed tile with plaster atop}. We strictly include the brick facade of the building. * We exclude any ACM work beyond removing windows, and this includes speedtile/tar and any associate plaster etc. *® We exclude any patchwork on the inside of the building co There is a number of stress cracks in the building from existing conditions, we cannot foresee or prevent if any plaster sheers off the walls during our work as we don’t know if the existing condition is “hollow” behind the plaster bond. As such we exclude repairs to plaster should anything sheer. In addition, the jambs of the windows interior may sheer as a result of the abatement, movement in speed tile or just anchoring the windows. We specifically exclude any/all plaster repair and recommend that work be done T&M to minimize potential cost impact upfront. Rochester 2575 Baird Road, Penfield, NY 14526 | Ph: 585.381.9970 « Fax: 585.381.0082 Buffalo 425 Franklin Street, Buffalo, NY 14202 | Ph: 716.955.9993 www javen.com