Text · page 45 of 68
Read the whole document on one page (all 68 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
AMD Environmental Consultants, inc. 72 E. Niagara St. Suite 100 Tonawanda, NY 14150 Office: 716-833-0043 Fax: 716-241-8689 www.amdenvironmental.com November 3/4, 2026 Atin: Traci Hopkins. Treasurer Village of Gowanda 27 East Main Street Gowanda, NY 14070 (716) 632-3353 C/O: Jillian C. Augustyn of Wendel Associates [email protected] / 716.430.6272 Mrs. Hopkins; AMD Environmental is pleased to provide you with the following work proposal for asbestos services. ¢ =©Project Location: 27 East Main Street, Gowanda NY 14070 ~ Gowanda Village Hail Window Abatement Project - Asbestos Visual Clearance Inspections per NYS ICR-56 for (7) Damaged Windows (North Side Meeting Rm) - Lead Based Paint Visual Clearance per EPA / HUD for (7) Damaged Windows (North Side Meeting Rm) + Scope of Work: AMD will perform Exterior Asbestos & Lead Based Paint Visual Clearance Inspections for 7 damaged windows on the North Side of the Building (Meeting Room) Abatement in conjunction with Arric Corporation for Asbestos Window Glaze Compound — Located at interaction between glass window panes and wood window sashes on all double hung windows on the second floor windows per Stohl Environmentals 6/3/26 Hazardous Materials Inspection Report. « AMD Environmental, Inc. (NYS DOL # 56177) will conduct asbestos & Lead Based Paint inspections in accordance with guidelines and techniques identified in NY Code Rule 56, EPA & US HUD. A final close-out report will be issued upon project completion containing all sample analysis, chains of custody, sample location maps, and visual inspection forms pertaining to the project. Fee Schedule: Asbestos Handling License No.: 56177 / AMD Laboratory ELAP No. 11108 Exterior Asbestos / Lead Based Paint Visual Clearance Inspections: $ 1,750.00 NYS / EPA Licensed Asbestos inspector: $350.00 per site visit for included up fo five site visits per Arric Corp 11/02/26 estimated curation Asbestos / Lead Based Paint Project Manager Rate: $ 450.00 $75,00/ Hour for estimated 6 hours for project coordination, oversight and compliance Final Close Out Report / US EPA & NYS Dept. of Labor Compliance & Document Submissions: $ 500.00 2 Close Out Reports ESTIMATED TOTAL COST: $ 2,700.00 CARD PAYMENT CONVENIENCE FEE: A fee of 3% will be added to ail card payments. To keep our prices fair, we are passing this cost onto card-paying customers. This fee can be avoided by paying with cash or check. Nofe: If total days on-site exceeds the estimated days, the total cost will reflect the additional days at the Standard Day Rate. Over-time is nat included in this quote and associated fee may be negotiated if deemed necessary for job completion. Please sign and return- via email, fax or traditional mail. Date: PO #: Name/Title: Client Signature: Regards, Jonathan Wolf! Vice President | AMD Environmental Consultants, Inc.