PW 2. Pond Inlets

Description: Free, unobstructed flow from the drainage area to stormwater ponds is necessary to prevent shallow flooding
and even structural damage from flooding. Pond inlets can consist of pipes, ditches, swales, or other means to convey
stormwater to the pond or wetland.
Instruction: Look for all areas where water flows into the pond during storms. Note that there may be multiple points of
inflow and types of structures (e.g., pipes, open ditches, etc.). Consult Table 2.10.2 below:

  Table 2.10.2 Pond Inlets
Problem (Check if Present)  Follow-Up Actions

    If the problem can be remedied with hand tools
  and done in a safe manner, remove
  vegetation, trash, woody debris, etc. from
  blocking inlet structures.
    Other:

    Inlets are buried,
  covered or filled with
  silt, debris, or trash, or
  blocked by excessive
  vegetation.
    Kick-Out to Level 2 or 3 Inspection: If the
  amount of material is too large to handle OR
  there are ANY safety concerns about working
  in standing water, soft sediment, etc., the work
  will likely have to be performed by a
  qualified contractor.

    Inlets are broken, and,
  with pieces of pipe or
  concrete falling into the
    Kick-Out to Level 2 Inspection: These types of
  pond, there is erosion
  structural or erosion problems are more
  around the inlet, there is
  serious and will require a qualified contractor
  open space under the
  to repair.
  pipe, or there is erosion
  where the inlet meets
  the pond

Maintenance Guidance  37