Text · page 1028 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
Table 2.10.3 PW Pond Area and Embankments Problem (Check if Present) Follow-Up Actions Level 1 includes handling only small amounts of material that can be removed by hand, or with rakes or other hand tools. Do not attempt any The pond area itself repair that poses a safety issue. has accumulated Other: sediment, trash, debris, or excessive vegetation that is choking the flow of Kick-Out to Level 2 Inspection: Most cases the water, OR the will call for a Level 2 Inspection and/or a pond area is covered qualified contractor. with algae or You are not sure what type and amount of aquatic plants. vegetation is supposed to be in the pond. The algae or aquatic plants should be identified so that proper control techniques can be applied. If there are only minor areas, try filling in small rills or gullies with topsoil, compacting, and seeding and mulching all bare dirt areas with an appropriate seed. Alternatively, try using herbaceous plugs to get vegetation established in The side slopes of tricky areas, such as steep slopes. the pond are unstable, eroding, Other: and have areas of bare dirt. Kick-Out to Level 2 Inspection: Erosion and many bare dirt areas on steep side slopes will require a Level 2 Inspection and repair by a qualified contractor. If you can safely access the riser on foot or with a small boat, clear minor amounts of debris and remove it from the pond area for safe disposal. Other: The riser structure is clogged with trash, debris, sediment, vegetation, etc., OR is open, unlocked, or has a steep drop and poses a safety concern. The pond Kick-Out to Level 2 Inspection: The riser cannot level may have be accessed safely, the amount of debris is dropped below its substantial, or the riser seems to be completely “normal” level. clogged and the water level has risen too high. There are safety issues with the riser and concern about access to pipes, drops, or any other life safety concern. The riser is leaning, broken, settling or slumping, corroded, eroded or any other structural problem. Maintenance Guidance 39 Page 1028 of 1174