Table 2.10.3 PW Pond Area and Embankments
Problem (Check if Present)  Follow-Up Actions

    Level 1 includes handling only small amounts of
  material that can be removed by hand, or with
  rakes or other hand tools. Do not attempt any
    The pond area itself  repair that poses a safety issue.
  has accumulated
    Other:
  sediment, trash,
  debris, or excessive
  vegetation that is
  choking the flow of    Kick-Out to Level 2 Inspection: Most cases
  the water, OR the  will call for a Level 2 Inspection and/or a
  pond area is covered  qualified contractor.
  with algae or    You are not sure what type and amount of
  aquatic plants.  vegetation is supposed to be in the pond.
    The algae or aquatic plants should be identified
  so that proper control techniques can be applied.

    If there are only minor areas, try filling in small
  rills or gullies with topsoil, compacting, and
  seeding and mulching all bare dirt areas with an
  appropriate seed. Alternatively, try using
  herbaceous plugs to get vegetation established in
    The side slopes of  tricky areas, such as steep slopes.
  the pond are
  unstable, eroding,    Other:
  and have areas of
  bare dirt.
    Kick-Out to Level 2 Inspection: Erosion and
  many bare dirt areas on steep side slopes will
  require a Level 2 Inspection and repair by a
  qualified contractor.

    If you can safely access the riser on foot or with a
  small boat, clear minor amounts of debris and
  remove it from the pond area for safe disposal.
    Other:
    The riser structure is
  clogged with trash,
  debris, sediment,
  vegetation, etc., OR
  is open, unlocked, or
  has a steep drop and
  poses a safety
  concern. The pond    Kick-Out to Level 2 Inspection: The riser cannot
  level may have  be accessed safely, the amount of debris is
  dropped below its  substantial, or the riser seems to be completely
  “normal” level.  clogged and the water level has risen too high.
    There are safety issues with the riser and concern
  about access to pipes, drops, or any other life
  safety concern.
    The riser is leaning, broken, settling or slumping,
  corroded, eroded or any other structural problem.

Maintenance Guidance  39

  Page 1028 of 1174