Text · page 1029 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
Table 2.10.3 PW Pond Area and Embankments Problem (Check if Present) Follow-Up Actions If there are small isolated areas, try to fix them by adding clean material (clay and topsoil) and seeding and mulching. Periodically mow embankments to enable inspection of the banks and to minimize establishment of woody vegetation. The Remove any woody vegetation that has already dam/embankment is established on embankments. slumping, sinking, Other: settling, eroding, or has medium or large trees growing on it. Kick-Out to Level 2 Inspection: Most of these situations will require a Level 2 Inspection or evaluation and repair by a qualified contractor. Seepage through the dam or problems with the pipe through the dam can be a serious issue that should be addressed to avoid possible dam failure. Clear light debris and vegetation. Other: The emergency Kick-Out to Level 2 Inspection: Displacement of spillway or outfall (if it rock lining, excessive vegetation and exists) has erosion/settlement may warrant review and erosion, settlement, decision by Level 2 Inspector to check against or loss of material. original plan. Rock-lined spillways Any uncertainty about the integrity of the have excessive emergency spillway should be referred to a debris or vegetation. Level 2 Inspector. Erosion or settlement such that design has been compromised should be reviewed by an engineer. Maintenance Guidance 40 Page 1029 of 1174