DEMOLITION NOTES:  EROSION CONTROL NOTES

  1.  ALL PERIMETER SILT SOCK TO BE INSTALLED PRIOR TO CONSTRUCTION ACTIVITY BEGINNING.  THE FOLLOWING EROSION CONTROL PROCEDURES SHALL BE ADHERED TO BY THE CONTRACTOR:

  2.  1. INSTALL TEMPORARY SILT SOCK BARRIERS AS DIRECTED BY THE OWNER AND AT ALL EXISTING STORMWATER CATCH BASINS WITHIN THE WORK AREA TO
  CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT THOSE ITEMS TO REMAIN, SUCH AS TREES, PROPERTY
  CORNER PINS, UTILITY POLES, VALVES, HYDRANTS, CURBS, MANHOLES AND CATCH BASINS.  PREVENT SEDIMENT MIGRATION. ALL SILT SOCK BARRIERS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLANS.
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145

  2. TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR RE-USE AS DIRECTED BY THE OWNER. ALL LOCAL ORDINANCES REGARDING THE SALE OF TOPSOIL

  Greensboro
  3.  TEMPORARY SILT SOCK TO BE INSTALLED AS DIRECTED BY THE OWNERS FIELD REPRESENTATIVE. MAINTAIN
  UNTIL VEGETATION IS ESTABLISHED AND PAVEMENT IS INSTALLED.  MUST BE FOLLOWED. TOPSOIL MAY NOT BE REMOVED WITHOUT A PERMIT.
  PHASE - 1 DEMOLITION NARRATIVE:
  4.  3. ALL SILT SOCK BARRIERS SHALL BE REPLACED WHEREVER THEY BECOME CLOGGED OR INOPERABLE.
  AS NECESSARY, COVERED DUMPSTERS SHALL BE PROVIDED ONSITE AS REQUIRED FOR CONSTRUCTION WASTE.
  DEMOLITION WORK TO BE PERFORMED DURING PHASE-1 SHALL INCLUDE THE FOLLOWING:

  - REMOVAL OF EXISTING PAVEMENT, CURBING, SIDEWALK, BUILDING FOOTPRINT/FOUNDATION WITHIN HATCHED LIMITS AS  5.  REMOVE ALL TREES AND STUMPS AS SHOWN AND DISPOSE OF OFF SITE. CONTRACTOR TO PROTECT ALL4.  THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REMOVAL OF TEMPORARY SEDIMENTATION CONTROLS.
  SHOWN.  TREES/BRUSH NOT DISTURBED BY CONSTRUCTION ACTIVITY. LOCATIONS OF TREES SHOWN ON PLAN ARE
  APPROXIMATE, CONTRACTOR TO CONFIRM LOCATION PRIOR TO CONSTRUCTION.  5.  THE CONTRACTOR MUST CONTROL DUST DURING CONSTRUCTION. DURING EARTHWORK OPERATIONS, WATER-SPREADING EQUIPMENT SHALL BE PROVIDED BY
  THE CONTRACTOR, AND SPREAD WATER AS NECESSARY AND AS DIRECTED BY THE OWNER IN ORDER TO CONTROL DUST.
  - REMOVAL OF EXISTING SITE UTILITIES, AS SHOWN ON SHEET 'C-002', TO BE COORDINATED WITH PROPOSED UTILITY

  Utica
  CONNECTIONS FROM THE PROPOSED UTILITY PLANS IN ORDER TO MAINTAIN FULL SERVICE OF UTILITIES FOR EXISTING TENANTS.  6.  CONTRACTOR TO COORDINATE WITH OWNER ON WHICH TREES SHALL BE REMOVED AND WHICH SHALL REMAIN
  AND BE PROTECTED DURING CONSTRUCTION.  6. DIRT OR DEBRIS LEFT ON LOCAL PUBLIC ROADS AS A RESULT OF THIS CONSTRUCTION PROJECT SHALL BE REMOVED AND ROAD SURFACES CLEANED BY THE
  CONTRACTOR ON A DAILY BASIS.
  - REMOVAL OF EXISTING TREES, LIGHT POLES, FENCING, AND OTHER SITE ITEMS AS LISTED ON 'C-001'.
  7.  EXISTING CURB AND REMOVAL OF EXISTING ENTRANCE SHALL BE SAW CUT FULL-DEPTH AND NEATLY REMOVED
  -REMOVAL OF INTERNAL ROADWAY CONNECTION WITHIN EXISTING SITE WHILE MAINTAINING ACCESS FOR EXISTING TENANTS  FROM THE BACKSIDE, EXISTING PAVEMENT SHALL NOT BE DISTURBED AND THE PAVEMENT EDGE SHALL7.BE USED
  ALL DISTURBED AREAS (EXCEPT AREAS TO BE PAVED OR BUILT UPON) SHALL BE TOPSOILED TO A MINIMUM 4" DEPTH AND SEEDED IMMEDIATELY AFTER FINE
  GRADING  TAKES PLACE AND AS SOON AS PHYSICALLY POSSIBLE.

  Buffalo
  ALONG ORCHARD PARK ROAD AND SLADE AVENUE AS SHOWN.  AS FORM FOR PLACING NEW CURB.

  8.  8. THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF DOWNSTREAM STORM SEWERS, DITCHES, AND CULVERTS. SILT BUILDUP FOUND TO BE A RESULT
  REMOVE EXISTING BUILDING TO INCLUDE ALL FOUNDATIONS, PORCHES, STEPS, ETC. ALL UTILITY CONNECTIONS
  TO BE ABANDONED AND/OR REMOVED PER COUNTY, TOWN, AND UTILITY COMPANY REQUIREMENTS.  OF THIS SITE CONSTRUCTION WORK SHALL BE REMOVED FROM DOWNSTREAM CULVERTS BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER OR
  THE TOWN/CITY.

  PROPOSED CONSTRUCTION CHAIN LINK FENCE  9.  ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE
  TO BE INSTALLED ALONG CONSTRUCTION  MAINTAINED UNTIL THE NEW SLOPES ARE STABILIZED WITH SEEDING AND/OR SLOPE PROTECTION, AS DIRECTED BY THE ENGINEER.
  LIMITS FOR PHASE-1 SITE WORK  EXISTING BUILDING CONCRETE
  FOUNDATION/FOOTPRINT TO BE REMOVED  10. INSTALL TEMPORARY SILT SOCK AROUND THE BASE OF STOCKPILES. STOCKPILES NOT BEING ACTIVELY USED FOR MORE THAN SEVEN (7) DAYS SHALL BE
  WITHIN HATCHED LIMITS AS SHOWN  STABILIZED.

  EX. LIGHT POLE & BASE TO REMAIN  11. THE PROFESSIONAL CERTIFYING COMPLIANCE TO NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS MUST INSPECT AT A MINIMUM WEEKLY, AND

  ST
  WHEN DISTURBING MORE THAN 5 ACRES TWICE A WEEK, AND SHALL PROVIDE THESE INSPECTION REPORT WITH A WRITTEN CERTIFICATION OF CONSTRUCTION

  OP
  FOR PHASE-1 DEMO & SHALL BE
  REMOVED DURING PHASE-2 DEMO  COMPLIANCE TO THE
  TOWN OF WEST SENECA(BI)WEEKLY.

  OP
  ST
  12. THE ENGINEER OF RECORD FOR THIS PROJECT CERTIFIES THAT THESE DESIGN PLANS MEET THE REQUIREMENTS AND ARE IN COMPLIANCE WITH THE NEW YORK
  STORMWATER MANAGEMENT DESIGN MANUAL AND NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS.
  EX. BLACKTOP, CONCRETE, & CURBING WITHIN HATCHED  EXISTING CONCRETE CURB ISLANDS TO BE REMOVED
  AREA TO BE REMOVED DURING PHASE - 1 OF DEMOLITION  WITHIN HATCHED LIMITS AS SHOWN. REFER TO DRAWING
  'C-003' FOR EXISTING UTILITY REMOVAL LIMITS & PHASING.

  West Seneca Exchange
  OP
  ST
  EX. LIGHT POLE & BASE TO REMAIN
  FOR PHASE-1 DEMO & SHALL BE

  ST

  Slade Ave, Ridge Rd & Orchard Park Rd
  EXISTING CONCRETE CURB

  OP
  REMOVED DURING PHASE-2 DEMO
  ISLAND WITH FIRE HYDRANT
  & BOLLARDS TO BE REMOVED
  EXISTING UTILITY MH TO REMAIN & BE
  PROTECTED DURING CONSTRUCTION  EXISTING CHAIN LINK FENCE TO BE REMOVED ALONG
  EXISTING ROADWAY TO ALLOW FOR PHASE-1 SITE
  EX. SIGNS TO BE REMOVED  WORK TO BE PERFORMED WITHIN LIMITS AS SHOWN
  WITHIN PHASE-1 DEMOLITION
  REMOVE EXISTING ROW OF  EX. LIGHT POLE &
  SIGNAGE WITHIN PARKING LOT  BASE TO BE REMOVED
  LIMITS OF EX. FENCING TO BE
  REMOVED WITHIN PHASE-1 DEMOLITION  EX. LIGHT POLE & BASE TO
  REMAIN & BE PROTECTED

  West Seneca New York
  OP
  ST

  INLET PROTECTION TO BE INSTALLED  EX. CONCRETE CURBED
  ON INLETS TO REMAIN DURING PHASE-1  ISLAND TO BE REMOVED
  © CARMINA WOOD DESIGN

  STS
  OTPO
  OF DEMOLITION, TYP. FOR ALL SHOWN  P  PROPOSED CONSTRUCTION CHAIN LINK FENCE
  TO BE INSTALLED ALONG CONSTRUCTION
  LIMITS FOR PHASE-1 SITE WORK  EX. LIGHT POLE W/BASE &
  BOLLARDS TO BE REMOVED
  EXISTING CHAIN LINK FENCE TO BE REMOVED ALONG
  EXISTING ROADWAY TO ALLOW FOR PHASE-1 SITE
  WORK TO BE PERFORMED WITHIN LIMITS AS SHOWN
  CONTRACTOR TO TEMPORARY
  CLOSE DOWN ROADWAY WHILE
  REMOVING EXISTING UTILITIES  EX. LIGHT POLE
  & BASE TO BE  EX. BLACKTOP, CONCRETE, & CURBING
  REMOVED  WITHIN HATCHED AREA TO BE REMOVED
  DURING PHASE - 1 OF DEMOLITION
  GV

  EXISTING SITE ENTRANCE AT ORCHARD PARK  EX. BLACKTOP, CONCRETE, & CURBING
  ROAD TO REMAIN OPEN AND MAINTAINED  EX. TREE TO BE REMOVED DURING PHASE - 1  WITHIN HATCHED AREA TO BE REMOVED
  OF DEMOLITION, TYPICAL FOR ALL SHOWN  EX. FENCING TO BE REMOVED  DURING PHASE - 1 OF DEMOLITION
  FOR ENTIRE DURATION OF CONSTRUCTION  WITHIN PHASE-1 DEMOLITION

  Date
  EX. LIGHT POLE & BASE
  TO BE REMOVED
  GV

  LIMIT OF PROPOSED SILT
  SOCK TO BE INSTALLED
  EX. CURBING TO BE REMOVED  EX. CURBING AND ROADWAY
  GATE TO BE REMOVED

  No. Description
  EX. LIGHT POLE &
  BASE TO BE REMOVED
  EX. TREE TO BE REMOVED DURING PHASE - 1

  REVISIONS:
  OF DEMOLITION, TYPICAL FOR ALL SHOWN
  PROPOSED SILT SOCK TO BE
  GV

  INSTALLED AT LOCATIONS SHOWN.
  CONTRACTOR TO MAINTAIN UNTIL
  SITE HAS BEEN FULLY STABILIZED.  EX. TREE TO BE REMOVED  EXISTING CHAIN LINK FENCE TO BE REMOVED ALONG
  DURING PHASE - 1 OF  EXISTING ROADWAY TO ALLOW FOR PHASE-1 SITE
  DEMOLITION, TYPICAL  WORK TO BE PERFORMED WITHIN LIMITS AS SHOWN
  FOR ALL SHOWN

  EX. BLACKTOP & CURBING WITHIN
  HATCHED AREA TO BE REMOVED
  DURING PHASE - 1 OF DEMOLITION
  EXISTING TREES TO BE REMOVED AS SHOWN; REFER

  Sealed 07/20/2026
  EX. SECTION OF
  FENCING TO BE  TO OFFSITE ROADWAY IMPROVEMENT PLANS FOR
  EX. ROADWAY GATES  REMOVED  LIMITS OF REMOVAL BY PASSERO ASSOCIATES
  TO BE REMOVED
  EX. BLACKTOP, CONCRETE, & CURBING WITHIN HATCHED  EX. OFFICE
  AREA TO BE REMOVED DURING PHASE - 1 OF DEMOLITION  7,980 SF
  INSTALL STABILIZED CONSTRUCTION ENTRANCE &
  CONCRETE WASHOUT AREA AT LOCATION SHOWN.
  LIMITS OF EX. FENCING TO BE
  CONTRACTOR TO MAINTAIN ENTRANCE & CONCRETE
  REMOVED WITHIN PHASE-1 DEMOLITION
  GV
  WASHOUT PIT FOR DURATION OF CONSTRUCTION

  EX. BLACKTOP, CONCRETE, &
  CURBING WITHIN HATCHED
  GV

  AREA TO BE REMOVED DURING
  PHASE - 1 OF DEMOLITION
  DRAWING NAME:
  EX. CURBED ISLAND TO BE REMOVED  PROPOSED SILT SOCK TO BE INSTALLED AT  PROVIDE OPENING ALONG SILT SOCK AS SHOWN  DEMOLITION & EROSION CONTROL LEGEND
  LOCATIONS SHOWN. CONTRACTOR TO MAINTAIN
  UNTIL SITE HAS BEEN FULLY STABILIZED.
  FOR PROPOSED SITE DRIVEWAY. CONTRACTOR TO
  MAINTAIN UNTIL SITE HAS BEEN FULLY STABILIZED.
  PROPOSED SILT SOCK TO BE
  INSTALLED AT LOCATIONS SHOWN.
  LIMIT OF PROPOSED SILT
  SOCK TO BE INSTALLED
  Demolition &
  INSTALL STABILIZED CONSTRUCTION ENTRANCE &  EXISTING PAVEMENT, CONCRETE, & CURBING TO BE
  CONCRETE WASHOUT AREA AT LOCATION SHOWN.
  CONTRACTOR TO MAINTAIN UNTIL
  SITE HAS BEEN FULLY STABILIZED.  SAWCUT & REMOVED WITHIN HATCHED LIMITS  Erosion Control
  CONTRACTOR TO MAINTAIN ENTRANCE & CONCRETE  EX. TREE TO BE REMOVED DURING PHASE - 1
  WASHOUT PIT FOR DURATION OF CONSTRUCTION  OF DEMOLITION, TYPICAL FOR ALL SHOWN  Plan - PH1
  PROPOSED SILT SOCK

  DEMO & E.C. PLAN - PHASE 1  EXISTING TREE TO BE REMOVED  Date:
  Drawn By:
  Scale:
  07/20/26
  C. Wood
  As Noted
  SCALE: 1"=100'  PROPOSED STORM INLET PROTECTION
  DRAWING NO.

  C-001
  EXISTING UTILITY STRUCTURE & PIPING TO BE REMOVED
  NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
  STABILIZED CONSTRUCTION ENTRANCE  CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
  100  0  100  200Ft.  Project No:  24-4113
  CONCRETE WASHOUT AREA  100'