Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 1045 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145

  Greensboro
  Utica
  Buffalo
  EX. SAN MH #15, EX. SAN MH 16, EX. SAN. MH #17, SAN MH #20,
  & EX. SAN MH 18 WITH ASSOCIATED PIPING TO BE REMOVED

  LIMITS OF REMOVAL FOR EX. STORM SEWER, EX. STORM MH #2 TO REMAIN &
  BE PROTECTED DURING CONSTRUCTION. PLUG EX. NE. INVERT WITHIN EX. MH

  ST
  OP
  REMOVE EXISTING STORM STRUCTURES (CB-43 &  EXISTING STORM STRUCTURE CB-71 & ASSOCIATED

  OP
  CB-44) ALONG WITH ASSOCIATED PIPING, AS SHOWN  PIPING TO BE REMOVED DURING PHASE-1 DEMOLITION

  ST
  LIMITS OF REMOVAL FOR EX. 8" SANITARY SEWER, EX. SANITARY
  MH #19 TO REMAIN & BE PROTECTED DURING CONSTRUCTION

  EXISTING FIRE HYDRANT TO BE REMOVED DURING PHASE-1 DEMOLITION.

  West Seneca Exchange
  PROPOSED HYDRANT TO BE INSTALLED NEARBY THIS EXISTING
  LOCATION TO PROVIDE FIRE COVERAGE DURING CONSTRUCTION; REFER
  ST
  OP  TO UTILITY PLANS FOR LOCATION OF NEW FIRE HYDRANT ASSEMBLY
  EXISTING 10" WATERMAIN TO BE ABANDONED IN PLACE, OR

  ST
  EXISTING STORM STRUCTURES (CB-65 &

  Slade Ave, Ridge Rd & Orchard Park Rd
  OP
  CB-66) & ASSOCIATED PIPING TO BE  REMOVED WITHIN HATCHED LIMITS AS SHOWN, CONTRACTOR
  REMOVED DURING PHASE-1 DEMOLITION  TO COORDINATE WITH APPROPRIATE UTILITY COMPANY

  LIMITS OF REMOVAL FOR EX. STORM SEWER, EX. STORM MH #16 TO REMAIN &
  BE PROTECTED DURING CONSTRUCTION. PLUG EX. W. INVERT WITHIN EX. MH

  EXISTING STORM STRUCTURE CB-70 & ASSOCIATED
  EX. STORM CB-42 & ST MH #1 WITH  PIPING TO BE REMOVED DURING PHASE-1 DEMOLITION
  ASSOCIATED PIPING TO BE REMOVED
  EX. 8" SANITARY SEWER TO BE ABANDONED

  West Seneca New York
  EX. SANITARY MH #14 WITH  IN PLACE, OR REMOVED, WITHIN LIMITS AS
  ASSOCIATED PIPING TO BE REMOVED  SHOWN, COORDINATE WITH CONTRACTOR.  EXISTING SANITARY MH-22 & SAN MH #21 & ASSOCIATED
  PIPING TO BE REMOVED DURING PHASE-1 DEMOLITION
  © CARMINA WOOD DESIGN

  STS
  REMOVE EXISTING STORM STRUCTURES
  OTPO
  P  EXISTING STORM CB-52, CB-53, ST MH #6,
  (CB-39, CB-41, & CB-40) ALONG WITH  & ST MH #7 & ASSOCIATED PIPING TO BE  EX. SANITARY MH-23 WITH ASSOCIATED PIPING
  ASSOCIATED PIPING, AS SHOWN  REMOVED DURING PHASE-1 DEMOLITION  TO BE REMOVED DURING PHASE-1 DEMOLITION
  EXISTING STORM STRUCTURES (CB-67,
  CB-68, & CB-69) & ASSOCIATED PIPING TO  EXISTING 10" WATERMAIN TO BE
  EX. SANITARY PIPING  REMOVED UP TO EXISTING METER
  TO BE REMOVED  BE REMOVED DURING PHASE-1 DEMOLITION
  PIT. EXISTING METER PIT TO
  REMAIN AND BE REUSED. REFER TO
  EX. ABANDONED GAS LINE TO BE  PLANS BY OTHERS FOR PROPOSED
  EX. SANITARY  REMOVED WITHIN LIMITS AS SHOWN;  CONNECTION TO EXISTING WATER
  LIMITS OF REMOVAL FOR EX. 10" SANITARY  PIPING TO BE  CONTRACTOR TO COORDINATE WITH  SERVICE
  EX. SAN MH-31  EXISTING UTILITY MH &  EX. SANITARY MH-24 &  APPROPRIATE UTILITY COMPANY
  SEWER, EX. SANITARY MH #13 TO REMAIN  REMOVED  ASSOCIATED LINES TO BE REMOVED
  TO BE REMOVED  ASSOCIATED PIPING TO
  GV

  & BE PROTECTED DURING CONSTRUCTION  DURING PHASE-1 DEMOLITION  BE REMOVED DURING
  EX. CB-51 WITH  PHASE-1 DEMOLITION
  ASSOCIATED PIPING
  TO BE REMOVED
  EX. ABANDONED GAS LINE TO BE  EXISTING 10" WATERMAIN TO BE

  Date
  EX. E-MH STRUCTURE  REMOVED WITHIN LIMITS AS SHOWN;  ABANDONED IN PLACE, OR REMOVED
  TO BE REMOVED  CONTRACTOR TO COORDINATE WITH  WITHIN HATCHED LIMITS AS SHOWN,
  APPROPRIATE UTILITY COMPANY  CONTRACTOR TO COORDINATE WITH
  APPROPRIATE UTILITY COMPANY
  GV

  CONTRACTOR TO VERIFY
  LOCATION PREVIOUSLY  EX. CB-50 & CB-54
  ABANDONED EX. 12" SANITARY  TO BE REMOVED

  No. Description
  SEWER & REMOVE UP TO  EX. STORM ST MH #17 WITH
  LIMITS AS SHOWN DURING  ASSOCIATED PIPING TO BE REMOVED
  PROPOSED SANITARY MANHOLE #1

  REVISIONS:
  PHASE-1 DEMOLITION  EX. CB-55, CB-56, CB-57,  DURING PHASE-1 DEMOLITION
  (DOGHOUSE) TO BE INSTALLED AT LOCATION  CB-58 & CB-59 WITH
  SHOWN PRIOR TO EXISTING SANITARY SEWER
  GV

  ASSOCIATED PIPING TO BE
  REMOVED/ABANDONED IN PLACE.  REMOVED DURING PHASE-1
  DEMOLITION  EX. CB-20 & ST MH-8 WITH
  LIMITS OF REMOVAL FOR PREVIOUSLY  ASSOCIATED PIPING TO BE REMOVED
  ABANDONED EX. 12" SANITARY SEWER,  EX. STORM SEWER PIPING  DURING PHASE-1 DEMOLITION
  EX. SANITARY MH #32 TO REMAIN & BE  TO BE REMOVED DURING
  PROTECTED DURING CONSTRUCTION  PHASE-1 DEMOLITION

  EX. UTILITY STRUCTURES & ASSOCIATED UNDERGROUND  EX. CB-61 & BC-60 WITH
  EX. CB-49 WITH ASSOCIATED  ELECTRICAL SERVICE TO BE REMOVED WITHIN LIMITS AS SHOWN;  ASSOCIATED PIPING TO

  Sealed 07/20/2026
  PIPING TO BE REMOVED  CONTRACTOR TO COORD. W/ APPROPRIATE UTILITY COMPANY  BE REMOVED DURING
  WITHIN PHASE-1 DEMOLITION  PHASE-1 DEMOLITION
  EX. GAS LINE TO BE REMOVED WITHIN LIMITS
  AS SHOWN; CONTRACTOR TO COORDINATE
  WITH APPROPRIATE UTILITY COMPANY  EX. OFFICE  NOTE:
  7,980 SF
  EXSTING UTILITIES SHOWN ON THIS SHEET ARE BASED ON
  EXISITING PLANS FOR THE AREA. CONTRACTOR SHALL VERIFY
  ALL LOCATIONS PRIOR TO CONSTRUCTION & NOTIFY ENGINEER
  OF ANY DISCREPANCIES.
  GV

  EXISTING UTILITIES NOT SHOWN TO BE REMOVED WILL REMAIN
  AND BE PROTECTED DURING CONSTRUCTION. REFER TO UTILITY
  GV

  PLAN FOR LIMITS OF REMOVAL AND PROPOSED RECONNECTIONS
  PROPOSED & EXISTING UTILITY PHASING NOTE:
  DRAWING NAME:
  CONTRACTOR SHALL COORDINATE INSTALLATION OF PROPOSED PRIORUTILITIES
  TO ANY REMOVAL OF  Demolition &
  EXISTING UTILITIES TO ENSURE THERE IS NO LAPSE IN COVERAGE FOR EXISTING/PROPOSED TENANTS.
  PROPOSED UTILITY LINES SHOWN ON THIS PLAN FOR INFORMATION ONLY. REFER TO UTILITY PLAN  Erosion Control
  DRAWINGS FOR FULL DESIGN.  DEMOLITION & EROSION CONTROL LEGEND  Plan - Utility Phasing
  EXISTING PAVEMENT, CONCRETE, & CURBING TO BE

  DEMO & E.C. PLAN - UTILITY PHASING  SAWCUT & REMOVED WITHIN HATCHED LIMITS  Date:
  Drawn By:
  Scale:
  07/20/26
  C. Wood
  As Noted
  PROPOSED SILT SOCK
  SCALE: 1"=100'  DRAWING NO.
  EXISTING TREE TO BE REMOVED

  PROPOSED STORM INLET PROTECTION

  100  0  100  200Ft.
  C-002
  NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
  CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.

  Project No:  24-4113
  EXISTING UTILITY STRUCTURE & PIPING TO BE REMOVED  100'