DEMOLITION NOTES: EROSION CONTROL NOTES 1. ALL PERIMETER SILT SOCK TO BE INSTALLED PRIOR TO CONSTRUCTION ACTIVITY BEGINNING. THE FOLLOWING EROSION CONTROL PROCEDURES SHALL BE ADHERED TO BY THE CONTRACTOR: PHASE - 2 DEMOLITION NARRATIVE: 2. 1. INSTALL TEMPORARY SILT SOCK BARRIERS AS DIRECTED BY THE OWNER AND AT ALL EXISTING STORMWATER CATCH BASINS WITHIN THE WORK AREA TO CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT THOSE ITEMS TO REMAIN, SUCH AS TREES, PROPERTY DEMOLITION WORK TO BE PERFORMED DURING PHASE-2 SHALL INCLUDE THE FOLLOWING: CORNER PINS, UTILITY POLES, VALVES, HYDRANTS, CURBS, MANHOLES AND CATCH BASINS. PREVENT SEDIMENT MIGRATION. ALL SILT SOCK BARRIERS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLANS. sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration. All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145 2. TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR RE-USE AS DIRECTED BY THE OWNER. ALL LOCAL ORDINANCES REGARDING THE SALE OF TOPSOIL Greensboro - REMOVAL OF EXISTING PAVEMENT, CURBING, SIDEWALK, BUILDING FOOTPRINT/FOUNDATION WITHIN HATCHED LIMITS AS SHOWN. 3. TEMPORARY SILT SOCK TO BE INSTALLED AS DIRECTED BY THE OWNERS FIELD REPRESENTATIVE. MAINTAIN UNTIL VEGETATION IS ESTABLISHED AND PAVEMENT IS INSTALLED. MUST BE FOLLOWED. TOPSOIL MAY NOT BE REMOVED WITHOUT A PERMIT. - REMOVAL OF REMAINING EXISTING SITE UTILITIES WITHIN PHASE - 2 DEMOLITION LIMITS, AS SHOWN ON SHEET 'C-002', TO BE COORDINATED WITH PROPOSED UTILITY CONNECTIONS FROM THE PROPOSED UTILITY PLANS IN ORDER TO MAINTAIN FULL SERVICE 4. 3. ALL SILT SOCK BARRIERS SHALL BE REPLACED WHEREVER THEY BECOME CLOGGED OR INOPERABLE. AS NECESSARY, COVERED DUMPSTERS SHALL BE PROVIDED ONSITE AS REQUIRED FOR CONSTRUCTION WASTE. OF UTILITIES FOR EXISTING TENANTS. 5. REMOVE ALL TREES AND STUMPS AS SHOWN AND DISPOSE OF OFF SITE. CONTRACTOR TO PROTECT ALL4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REMOVAL OF TEMPORARY SEDIMENTATION CONTROLS. - REMOVAL OF EXISTING TREES, LIGHT POLES, FENCING, AND OTHER SITE ITEMS AS LISTED ON 'C-003'. TREES/BRUSH NOT DISTURBED BY CONSTRUCTION ACTIVITY. LOCATIONS OF TREES SHOWN ON PLAN ARE APPROXIMATE, CONTRACTOR TO CONFIRM LOCATION PRIOR TO CONSTRUCTION. 5. THE CONTRACTOR MUST CONTROL DUST DURING CONSTRUCTION. DURING EARTHWORK OPERATIONS, WATER-SPREADING EQUIPMENT SHALL BE PROVIDED BY -REMOVAL OF EXISTING ACCESS TO 'TOPS MARKETS' AT ORCHARD PARK ROADWAY & CONNECTION TO PROPOSED INTERNAL THE CONTRACTOR, AND SPREAD WATER AS NECESSARY AND AS DIRECTED BY THE OWNER IN ORDER TO CONTROL DUST. Utica ROADWAY AS SHOWN ON PLAN 'C-003' TO RE-INTRODUCE INTERNAL TRAFFIC FLOW TO PLAZA. 6. CONTRACTOR TO COORDINATE WITH OWNER ON WHICH TREES SHALL BE REMOVED AND WHICH SHALL REMAIN AND BE PROTECTED DURING CONSTRUCTION. 6. DIRT OR DEBRIS LEFT ON LOCAL PUBLIC ROADS AS A RESULT OF THIS CONSTRUCTION PROJECT SHALL BE REMOVED AND ROAD SURFACES CLEANED BY THE CONTRACTOR ON A DAILY BASIS. 7. EXISTING CURB AND REMOVAL OF EXISTING ENTRANCE SHALL BE SAW CUT FULL-DEPTH AND NEATLY REMOVED FROM THE BACKSIDE, EXISTING PAVEMENT SHALL NOT BE DISTURBED AND THE PAVEMENT EDGE SHALL7.BE USED ALL DISTURBED AREAS (EXCEPT AREAS TO BE PAVED OR BUILT UPON) SHALL BE TOPSOILED TO A MINIMUM 4" DEPTH AND SEEDED IMMEDIATELY AFTER FINE GRADING TAKES PLACE AND AS SOON AS PHYSICALLY POSSIBLE. Buffalo AS FORM FOR PLACING NEW CURB. 8. 8. THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF DOWNSTREAM STORM SEWERS, DITCHES, AND CULVERTS. SILT BUILDUP FOUND TO BE A RESULT REMOVE EXISTING BUILDING TO INCLUDE ALL FOUNDATIONS, PORCHES, STEPS, ETC. ALL UTILITY CONNECTIONS TO BE ABANDONED AND/OR REMOVED PER COUNTY, TOWN, AND UTILITY COMPANY REQUIREMENTS. OF THIS SITE CONSTRUCTION WORK SHALL BE REMOVED FROM DOWNSTREAM CULVERTS BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER OR THE TOWN/CITY. 9. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE MAINTAINED UNTIL THE NEW SLOPES ARE STABILIZED WITH SEEDING AND/OR SLOPE PROTECTION, AS DIRECTED BY THE ENGINEER. 10. INSTALL TEMPORARY SILT SOCK AROUND THE BASE OF STOCKPILES. STOCKPILES NOT BEING ACTIVELY USED FOR MORE THAN SEVEN (7) DAYS SHALL BE STABILIZED. 11. THE PROFESSIONAL CERTIFYING COMPLIANCE TO NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS MUST INSPECT AT A MINIMUM WEEKLY, AND ST PROPOSED CONSTRUCTION FENCE TO BE WHEN DISTURBING MORE THAN 5 ACRES TWICE A WEEK, AND SHALL PROVIDE THESE INSPECTION REPORT WITH A WRITTEN CERTIFICATION OF CONSTRUCTION OP INSTALLED FOR DURATION OF PHASE-2 COMPLIANCE TO THE TOWN OF WEST SENECA(BI)WEEKLY. OP DEMOLITION; CONTRACTOR TO COORDINATE ST LOCATION & ACCESS WITH TENANTS ON SITE 12. THE ENGINEER OF RECORD FOR THIS PROJECT CERTIFIES THAT THESE DESIGN PLANS MEET THE REQUIREMENTS AND ARE IN COMPLIANCE WITH THE NEW YORK STORMWATER MANAGEMENT DESIGN MANUAL AND NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS. West Seneca Exchange LIMITS OF EXISTING PAVEMENT & CURBING TO BE REMOVED ST OP FOR PHASE-2 DEMOLITION ST Slade Ave, Ridge Rd & Orchard Park Rd OP EX. BLACKTOP, CONCRETE, & CURBING WITHIN HATCHED AREA TO BE REMOVED DURING PHASE-2 OF DEMOLITION EX. LIGHT POLE & BASE TO BE REMOVED EX. LIGHT POLE & BASE TO BE REMOVED PROPOSED CONSTRUCTION FENCE TO BE EXISTING ENTRANCE ALONG ORCHARD PARK ROAD TO INSTALLED FOR DURATION OF PHASE-2 West Seneca New York REMAIN OPEN TO MAINTAIN ACCESS TO EXISTING DEMOLITION; CONTRACTOR TO COORDINATE BUSINESS(S) TO UTILIZE THIS ENTRANCE AREA DURING LOCATION & ACCESS WITH TENANTS ON SITE PHASE-1 AND PHASE-2 OF DEMOLITION/CONSTRUCTION © CARMINA WOOD DESIGN STS OTPO P LIMITS OF EXISTING PAVEMENT & CURBING TO BE REMOVED FOR PHASE-2 DEMOLITION EX. FIRE HYRANT TO BE REMOVED EX. LIGHT POLE & BASE TO BE REMOVED NOTE: EX. TREE TO BE REMOVED DURING PHASE-2 REFER TO PLANS BY OTHERS FOR PROPOSED EROSION OF DEMOLITION, TYPICAL FOR ALL SHOWN CONTROL MEASURES WITHIN THIS PORTION OF THE SITE. LIMITS OF EXISTING PAVEMENT & CURBING EX. BLACKTOP, GV TO BE REMOVED FOR PHASE-2 DEMOLITION CONCRETE, & CURBING WITHIN HATCHED AREA EXISTING ENTRANCE ALONG ORCHARD PARK ROAD TO TO BE REMOVED DURING REMAIN OPEN TO MAINTAIN ACCESS TO EXISTING PHASE-2 OF DEMOLITION BUSINESS(S) TO UTILIZE THIS ENTRANCE AREA DURING Date PHASE-1 AND PHASE-2 OF DEMOLITION/CONSTRUCTION PROPOSED INTERIOR PROPOSED CONSTRUCTION FENCE TO BE INSTALLED FOR ROADWAY TO BE INSTALLED DURATION OF PHASE-2 DEMOLITION; CONTRACTOR TO PER SITE PLANS COORDINATE LOCATION & ACCESS WITH TENANTS ON SITE GV LIMITS OF EXISTING PAVEMENT & CURBING No. Description TO BE REMOVED FOR PHASE-2 DEMOLITION REVISIONS: GV NOTE: PROPOSED INTERIOR ROADWAY INSTALL PROPOSED DETENTION BASIN. TO BE INSTALLED PER SITE PLANS REMOVE SILT BUILD UP TO DESIGN GRADES UPON COMPLETION OF CONSTRUCTION. Sealed 07/20/2026 PROPOSED INLET PROTECTION TO BE INSTALLED ON ALL EXISTING TO REMAIN AND PROPOSED CATCH BASIN STRUCTURES, TYPICAL FOR ALL SHOWN EX. OFFICE 7,980 SF GV GV DRAWING NAME: PROPOSED SILT SOCK TO BE INSTALLED AT LOCATIONS SHOWN. Demolition & CONTRACTOR TO MAINTAIN UNTIL SITE HAS BEEN FULLY STABILIZED. Erosion Control Plan - PH2 DEMOLITION & EROSION CONTROL LEGEND DEMO & E.C. PLAN - PHASE 2 EXISTING PAVEMENT, CONCRETE, & CURBING TO BE SAWCUT & REMOVED WITHIN HATCHED LIMITS Date: Drawn By: Scale: 07/20/26 C. Wood As Noted SCALE: 1"=100' DRAWING NO. PROPOSED SILT SOCK EXISTING TREE TO BE REMOVED PROPOSED STORM INLET PROTECTION NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS, CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. 100 0 100 200Ft. C-003 Project No: 24-4113 100' Page 1046 of 1174