Text · page 1058 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
ST ST MATCHLINE (C-302) 00 ST 17+ 33 LF 12" ST MATCHLINE (C-301) IO ST CB 10 HDPE @ ST PAT RIM 614.73 1.00% CB 11 FUT sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration. RIM 614.85 ST 183 LF 48" SW INV 612.73 URE All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145 (SHEET C-302) ST NE INV 612.40 Greensboro HDPE @ ST 130 RETA 0.50% SW INV 612.40 322 LF 24" (DESIGNED ST HDPE @ ST ST BY OTHERS) PROPOSED PIPE CROSSING: 49 LF 12" ST MH #2 9,10 'x70' IL 0.39% ST CURRENT FUT 10" SAN. INV=603.00 ST HDPE @ RIM 613.77 0 SF RES URE D ST ST 1.00% W INV 605.48 STOP SHEET 48" STORM INV=605.05 PROPOSED STORM DRAINAGE STRUCTURES TAU RIVE 45 LF 18" NE INV 605.48 ST AND ASSOCIATED PIPING ARE SHOWN FOR RAN -TH ST 23+56 IO T 4, RU HDPE @ INFORMATIONAL PURPOSES ONLY AND WILL ST ST 28 LF 24" CB 12 ST PAT 963 26 1.00% HDPE @ ST RIM 614.76 BE DESIGNED AS PART OF FUTURE (SHEET C-303) SF ST 18+ Utica 00 CB 9 1.02% 21 LF 12" NE INV 611.91 DEVELOPMENT PHASES 16+ RIM 613.85 ST HDPE @ NW INV 611.91 ST SW INV 611.35 SHEET LOCATION MAP 1.00% +00 23+ ST 00 ST ST18 ST PROPOSED PIPE CROSSING: ST CB 13 Buffalo ST ST 8" SAN. INV=603.13 RIM 614.75 MAT ST 24" STORM INV=608.20 CB 8 ST CHL SCALE: N.T.S. RIM 613.85 SE INV 611.70 ST INE SW INV 611.70 ST ST NW INV 608.37 ST ST ST ST ST CB 7 NE INV 610.90 ST ST FU ST RIM 612.85 SE INV 608.37 22+ ST ST 00 2,50 TURE PROPOSED PIPE CROSSING: ST ST SW INV 610.85 80 LF 18" 8" SAN. INV=603.15 ST ST ST ST ST CB 14 0 G. ST HDPE @ ST 48" STORM INV=605.56 RIM 615.20 ST 40 LF 24" FU ST BAN S.F. ST 1.00% RES TURE D S INV 609.50 HDPE @ 0 ST CB 16 ST ST K ST ST 0 ST ST NW INV 609.50 15+ CB 6 290 LF 12" 0.58% RIM 615.73 TAU RIV NT 2 E-TSTORM RAPROPOSED ST 00 ST 45 LF 12" ST ST ST HDPE @ RIM 612.85 HDPE @ 21+ 00 SE INV 609.73 HRU DRAINAGE STRUCTURES ST ST SHOWN,3W/ASSOCIATED PIPING TO BE STOP NW INV 609.17 ST 0.80% SW INV 610.00 80DURING ST 17 + 1.53% N INV 609.73 INSTALLED SF FUTURE PHASE OF WORK 10+ NE INV 610.16 ST ST ST ST 00 SE INV 609.17 ST 187 LF 48" CB 15 ST 21 LF 24" STOP ST ST HDPE @ RIM 615.20 ST HDPE @ ST 0.51% ST NE INV 609.38 21 LF 18" CB 17 ST CB 1 0.57% CB 5 STOP ST SE INV 609.38 20+ HDPE @ RIM 615.73 RIM 615.34 00 40 LF 24" ST PROPOSED STORM DRAINAGE STRUCTURES ST RIM 613.91 W INV 609.38 3.00% NE INV 610.63 11+0 S INV 612.84 AND ASSOCIATED PIPING ARE SHOWN FOR ST HDPE @ West Seneca Exchange 39 LF 12" ST 0 SW INV 611.91 ST INFORMATIONAL PURPOSES ONLY AND WILL ST 0.63% CB 38 ST HDPE @00 ST + BE DESIGNED AS PART OFFFUTURE UTU ST 14 1.00% RIM 615.03 STOP ST ST 137 LF 18" DEVELOPMENT PHASESR RE E INV 609.13 21 LF 18" ESTA CB 18 ST HDPE @ URA DRIVE-T ST CB 2 HDPE @ ST SW INV 611.81 ST PROPOSED PIPE CROSSING: RIM 614.38 Slade Ave, Ridge Rd & Orchard Park Rd ST RIM 614.45 1.00% NT, H 1 9 NW INV 609.13+00 0.52% 2,30 RU NW INV 608.34 ST 8" SAN. INV= 604.55 ST 12+0 00 16+ST PROPOSED PIPE CROSSING: 0 ST N INV 611.64 ST ST 0 SF 24" STORM INV=609.25 95 LF 24" ST 120 LF 18" CB 4 ST 10" SAN. INV=601.18 35 LF 18" W INV 611.64 305 LF 48" HDPE @ CB 19 HDPE @ RIM 613.70 ST CB 37 18" STORM INV=611.95 HDPE @ 13+00 ST MH #1 HDPE @ 0.73% RIM 615.03 RIM 614.38 PROPOSED PIPE CROSSING: N INV 610.54 ST 1.00% NE INV 612.02 SE INV 608.23 ST 1.00% ST 0.50% ST ST NE INV 611.52 RIM 612.93 CB 36 8" SAN. INV= 605.10 ST ST SW INV 606.43 ST 21 LF 12" NW INV 608.23 18" STORM INV=608.15 ORCHARD PARK ROAD IMPROVEMENTS SHOWN SE INV 610.54 RIM 614.04 ST CB 3 ST E INV 606.43 HDPE @ 18+ ST DESIGNED BY OTHERS. REFER TO OFFSITE ST SE INV 608.44 00 STOP ST 1.00% 48 LF 18" ST PLANS BY OTHERS RIM 614.25 STOP SW INV 608.44 STOP ST ST HDPE @ STOP E INV 611.29 ST 75 LF 18" ST ST 0.48% ST ST S INV 611.29 HDPE @ ST 48 LF 30" ST 1.01% ST ST HDPE @ West Seneca New York ST ST 0.64% ST ST ST END SECTION 17+0 33 LF 12" W/ RIPRAP PROPOSED PIPE CROSSING: 0 ST ST HDPE @ © CARMINA WOOD DESIGN END SECTION 3.70% STOP FOR 00 PROPOSED STORM DRAINAGE STRUCTURES 8" SAN. INV= 605.67 ST ST W/ RIPRAP 15+ ST AND ASSOCIATED PIPING ARE SHOWN 36" STORM INV=608.20 PROPOSED PIPE CROSSING: ST 21 LF 30" ST ST INFORMATIONAL PURPOSES ONLY AND WILL ST 8" SAN. INV= 606.18 ST BE DESIGNED AS PART OF FUTURE HDPE @ STOP ST 18" STORM INV=608.30 STOP ST DEVELOPMENT PHASES STOP 0.62% 47 LF 18" ST ST ST ST CB 35 ST ST HDPE @ RIM 614.04 ST ST 0.99% NE INV 608.31 ST ST ST ST ST SW INV 608.31 STOP STOP END SECTION END SECTION ST ST W/ RIPRAP W/ RIPRAP ST ST INV 607.95 ST ST ST ST PROPOSED STORMWATER ST ST MANAGEMENT AREA ST ST ST 00 14+ ST ST ST ST 21 LF 30" END SECTION ST Date ST ST ST HDPE @ W/ RIPRAP PROPOSED STORM DRAINAGE STRUCTURES ST 0.67% ST ST AND ASSOCIATED PIPING ARE SHOWN FOR ST ST INFORMATIONAL PURPOSES ONLY AND WILL ST ST BE DESIGNED AS PART OF FUTURE ST ST DEVELOPMENT PHASES STOP STOP ST STOP STOP CB 34 STOP STOP RIM 614.04 90 LF 30" ST STOP STOP CB 33 HDPE @ ST ST W INV 608.87 STOP RIM 614.04 SW INV 608.87 0.81% NE INV 608.73 No. Description T00 SE INV 608.73 ST 13S+ STOP REVISIONS: ST ST STOP ST ST ST ST ST ST ST ST 101 LF 24" ST ST CBSTOP HDPE @ ST 32 ST RIM 615.14 STOP 0.65% PROPOSED STORMSTOP DRAINAGE STRUCTURES ST ST ST ST W INV 609.52 AND ASSOCIATED PIPING ARE SHOWN FOR ST E INV 609.52 45 LF 24" ST ST INFORMATIONAL PURPOSES ONLY AND WILL ST HDPE @ BE DESIGNED AS PART OF FUTURE ST ST ST 0.57% DEVELOPMENT PHASES ) ST CB 31 -301 ST RIM 615.64 ST E (C W INV 609.78 STOP FUTURE RETAIL ST ST ST ST 12+00 ST FUTURE RETAIL ST E INV 609.78 ST ST ST ST FUTURE RETAIL ST IN ST STOP ST ST ST FUTURE RETAIL ST ST ST ST ST ST CHL ST 110'x200' Sealed 07/20/2026 ) 110'x200' -303 110'x200' MAT 22,000 SF 110'x200' ST 74 LF 24" ST E (C 22,000 SF 22,000 SF 22,000 SF HDPE @ 0.58% IN ST CHL ST CB 29 MAT RIM 614.96 CB 30 N INV 609.54 FUTURE ST RIM 614.71 ST ST PROPOSED STORM DRAINAGE STRUCTURES SHOWN W INV 610.21 S INV 608.53 ST RESTAURANT FUTURE RETAIL FUTURE RETAIL PROPOSED STORM DRAINAGE LEGEND W/PROPOSED STORM DRAINAGE STRUCTURES AND 100'x100' ST E INV 610.21 ST ST ASSOCIATED PIPING ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY AND WILL BE DESIGNED AS PART OF ST 100'x100' PROPOSED STORM PIPE 100'x100' ST ST FUTURE DEVELOPMENT PHASES 11+00 10,000 SF PROPOSED PERFORATED 10,0 ST 10,000 SF 00 SF ST ST PIPING TO BE INSTALLED DURING FUTURE PHASE OF WORK 33 LF 18" 92 LF 24" PROPOSED STORM DRAINAGE STRUCTURES AND STORM PIPE ST HDPE @ DRAWING NAME: ST ST HDPE @ ASSOCIATED PIPING ARE SHOWN FOR 3.06% ST INFORMATIONAL PURPOSES ONLY AND WILL BE PROPOSED CATCH BASIN ST 0.63% ST ST ST ST ST ST ST CB 27 STOP DESIGNED AS PART OF FUTURE DEVELOPMENT STOP Storm Drainage ST ST ST ST RIM 614.02 PHASES ST ST ST ST ST Plan ST ST ST ST N INV 611.11 PROPOSED MANHOLE ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST PROPOSED CLEANOUT ST ST CB: CATCH BASIN CB 28 MH: MANHOLE Date: 07/20/26 WQu: WATER QUALITY TREATMENT UNIT RIM 613.79 Drawn By: C. Wood SLADE DRIVE IMPROVEMENTS SHOWN S INV 610.79 33 LF 18" Scale: As Noted 10+00 DESIGNED BY OTHERS. REFER TO OFFSITE E INV 610.79 HDPE @ 0.97% DRAWING NO. PLANS BY OTHERS STORM DRAINAGE PLAN NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS, CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. C-301 SCALE: 1"=40' 40 0 40 80Ft. 40' Project No: 24-4113 Page 1058 of 1174