Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 1058 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

ST

  ST
  MATCHLINE (C-302)

  00
  ST

  17+
  33 LF 12"

  ST
  MATCHLINE (C-301)

  IO
  ST  CB 10  HDPE @

  ST

  PAT
  RIM 614.73  1.00%  CB 11
  FUT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.

  RIM 614.85

  ST
  183 LF 48"  SW INV 612.73
  URE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145

  (SHEET C-302)  ST
  NE INV 612.40

  Greensboro
  HDPE @

  ST
  130 RETA
  0.50%  SW INV 612.40  322 LF 24"
  (DESIGNED  ST
  HDPE @

  ST
  ST
  BY OTHERS)  PROPOSED PIPE CROSSING:  49 LF 12"  ST MH #2  9,10 'x70' IL  0.39%

  ST
  CURRENT  FUT  10" SAN. INV=603.00  ST  HDPE @  RIM 613.77
  0 SF
  RES URE D

  ST

  ST
  1.00%  W INV 605.48

  STOP
  SHEET  48" STORM INV=605.05  PROPOSED STORM DRAINAGE STRUCTURES
  TAU RIVE  45 LF 18"  NE INV 605.48
  ST
  AND ASSOCIATED PIPING ARE SHOWN FOR
  RAN -TH  ST
  23+56

  IO
  T 4, RU  HDPE @  INFORMATIONAL PURPOSES ONLY AND WILL

  ST
  ST
  28 LF 24"  CB 12

  ST
  PAT
  963

  26
  1.00%  HDPE @  ST  RIM 614.76  BE DESIGNED AS PART OF FUTURE
  (SHEET C-303)  SF
  ST

  18+

  Utica
  00
  CB 9  1.02%  21 LF 12"  NE INV 611.91  DEVELOPMENT PHASES

  16+
  RIM 613.85

  ST
  HDPE @  NW INV 611.91  ST
  SW INV 611.35
  SHEET LOCATION MAP  1.00%

  +00
  23+  ST
  00

  ST

  ST18
  ST
  PROPOSED PIPE CROSSING:  ST  CB 13

  Buffalo
  ST

  ST
  8" SAN. INV=603.13  RIM 614.75  MAT

  ST
  24" STORM INV=608.20  CB 8  ST  CHL
  SCALE: N.T.S.  RIM 613.85
  SE INV 611.70  ST
  INE
  SW INV 611.70

  ST
  ST
  NW INV 608.37  ST

  ST

  ST
  ST
  ST
  CB 7  NE INV 610.90  ST  ST
  FU

  ST
  RIM 612.85  SE INV 608.37  22+  ST

  ST
  00
  2,50 TURE
  PROPOSED PIPE CROSSING:  ST
  ST
  SW INV 610.85  80 LF 18"  8" SAN. INV=603.15

  ST
  ST
  ST
  ST
  ST  CB 14
  0 G.

  ST
  HDPE @  ST  48" STORM INV=605.56  RIM 615.20
  ST
  40 LF 24"  FU

  ST
  BAN S.F.
  ST
  1.00%
  RES TURE D
  S INV 609.50  HDPE @

  0
  ST
  CB 16

  ST
  ST
  K
  ST

  ST
  0
  ST

  ST
  NW INV 609.50

  15+
  CB 6  290 LF 12"  0.58%  RIM 615.73  TAU RIV
  NT 2 E-TSTORM
  RAPROPOSED
  ST

  00 ST
  45 LF 12"  ST  ST
  ST
  HDPE @
  RIM 612.85  HDPE @  21+
  00
  SE INV 609.73  HRU DRAINAGE  STRUCTURES

  ST
  ST  SHOWN,3W/ASSOCIATED PIPING TO BE

  STOP
  NW INV 609.17  ST  0.80%  SW INV 610.00  80DURING

  ST

  17 +
  1.53%  N INV 609.73  INSTALLED  SF FUTURE PHASE OF WORK
  10+  NE INV 610.16  ST  ST
  ST

  ST
  00  SE INV 609.17
  ST
  187 LF 48"  CB 15
  ST
  21 LF 24"

  STOP

  ST
  ST
  HDPE @  RIM 615.20  ST  HDPE @

  ST
  0.51%  ST
  NE INV 609.38  21 LF 18"  CB 17  ST
  CB 1  0.57%
  CB 5  STOP  ST
  SE INV 609.38  20+  HDPE @  RIM 615.73
  RIM 615.34  00  40 LF 24"

  ST
  PROPOSED STORM DRAINAGE STRUCTURES

  ST
  RIM 613.91  W INV 609.38  3.00%  NE INV 610.63
  11+0  S INV 612.84  AND ASSOCIATED PIPING ARE SHOWN FOR
  ST
  HDPE @

  West Seneca Exchange
  39 LF 12"

  ST
  0  SW INV 611.91

  ST
  INFORMATIONAL PURPOSES ONLY AND WILL  ST  0.63%  CB 38

  ST
  HDPE @00

  ST
  +  BE DESIGNED AS PART OFFFUTURE
  UTU

  ST
  14
  1.00%  RIM 615.03

  STOP
  ST
  ST  137 LF 18"  DEVELOPMENT PHASESR  RE  E INV 609.13  21 LF 18"
  ESTA  CB 18

  ST
  HDPE @
  URA DRIVE-T
  ST
  CB 2  HDPE @

  ST
  SW INV 611.81

  ST
  PROPOSED PIPE CROSSING:  RIM 614.38

  Slade Ave, Ridge Rd & Orchard Park Rd
  ST
  RIM 614.45  1.00%  NT,  H  1 9
  NW INV 609.13+00  0.52%
  2,30 RU  NW INV 608.34
  ST
  8" SAN. INV= 604.55

  ST
  12+0

  00
  16+ST
  PROPOSED PIPE CROSSING:  0  ST  N INV 611.64

  ST
  ST
  0 SF  24" STORM INV=609.25  95 LF 24"

  ST
  120 LF 18"  CB 4

  ST
  10" SAN. INV=601.18  35 LF 18"  W INV 611.64  305 LF 48"  HDPE @  CB 19
  HDPE @  RIM 613.70  ST  CB 37
  18" STORM INV=611.95  HDPE @  13+00  ST MH #1  HDPE @  0.73%  RIM 615.03  RIM 614.38  PROPOSED PIPE CROSSING:
  N INV 610.54

  ST
  1.00%
  NE INV 612.02 SE INV 608.23
  ST
  1.00%  ST  0.50%

  ST

  ST
  NE INV 611.52  RIM 612.93  CB 36  8" SAN. INV= 605.10

  ST
  ST  SW INV 606.43  ST  21 LF 12"  NW INV 608.23  18" STORM INV=608.15
  ORCHARD PARK ROAD IMPROVEMENTS SHOWN  SE INV 610.54  RIM 614.04

  ST
  CB 3  ST  E INV 606.43  HDPE @  18+

  ST
  DESIGNED BY OTHERS. REFER TO OFFSITE  ST  SE INV 608.44  00

  STOP
  ST
  1.00%  48 LF 18"

  ST
  PLANS BY OTHERS  RIM 614.25  STOP  SW INV 608.44
  STOP

  ST
  ST
  HDPE @

  STOP
  E INV 611.29  ST  75 LF 18"
  ST

  ST
  0.48%

  ST
  ST
  S INV 611.29  HDPE @  ST  48 LF 30"
  ST
  1.01%  ST  ST  HDPE @

  West Seneca New York
  ST
  ST  0.64%

  ST
  ST
  ST  END SECTION  17+0  33 LF 12"
  W/ RIPRAP PROPOSED PIPE CROSSING:  0
  ST  ST  HDPE @
  © CARMINA WOOD DESIGN

  END SECTION  3.70%
  STOP FOR

  00
  PROPOSED STORM DRAINAGE STRUCTURES  8" SAN. INV= 605.67

  ST
  ST
  W/ RIPRAP

  15+
  ST
  AND ASSOCIATED PIPING ARE SHOWN  36" STORM INV=608.20  PROPOSED PIPE CROSSING:
  ST

  21 LF 30"

  ST
  ST
  INFORMATIONAL PURPOSES ONLY AND WILL

  ST
  8" SAN. INV= 606.18

  ST
  BE DESIGNED AS PART OF FUTURE  HDPE @

  STOP
  ST  18" STORM INV=608.30
  STOP  ST  DEVELOPMENT PHASES
  STOP  0.62%  47 LF 18"
  ST

  ST
  ST

  ST
  CB 35

  ST
  ST  HDPE @
  RIM 614.04

  ST
  ST  0.99%
  NE INV 608.31
  ST

  ST

  ST

  ST
  ST  SW INV 608.31

  STOP
  STOP  END SECTION  END SECTION

  ST
  ST
  W/ RIPRAP  W/ RIPRAP
  ST

  ST

  INV 607.95

  ST

  ST
  ST
  ST  PROPOSED STORMWATER
  ST

  ST
  MANAGEMENT AREA
  ST

  ST
  ST

  00
  14+
  ST  ST
  ST

  ST  21 LF 30"  END SECTION
  ST

  Date
  ST
  ST
  ST  HDPE @  W/ RIPRAP
  PROPOSED STORM DRAINAGE STRUCTURES  ST
  0.67%  ST
  ST

  AND ASSOCIATED PIPING ARE SHOWN FOR
  ST

  ST
  INFORMATIONAL PURPOSES ONLY AND WILL  ST  ST
  BE DESIGNED AS PART OF FUTURE  ST
  ST

  DEVELOPMENT PHASES
  STOP  STOP  ST
  STOP  STOP  CB 34
  STOP  STOP  RIM 614.04  90 LF 30"
  ST

  STOP  STOP  CB 33  HDPE @

  ST

  ST
  W INV 608.87  STOP  RIM 614.04
  SW INV 608.87  0.81%
  NE INV 608.73

  No. Description
  T00
  SE INV 608.73

  ST
  13S+

  STOP

  REVISIONS:
  ST  ST

  STOP
  ST  ST  ST  ST  ST  ST

  ST
  ST
  101 LF 24"  ST
  ST
  CBSTOP  HDPE @

  ST
  32  ST
  RIM 615.14  STOP  0.65%  PROPOSED STORMSTOP
  DRAINAGE STRUCTURES
  ST
  ST

  ST
  ST
  W INV 609.52  AND ASSOCIATED PIPING ARE SHOWN FOR  ST
  E INV 609.52  45 LF 24"

  ST
  ST
  INFORMATIONAL PURPOSES ONLY AND WILL  ST
  HDPE @  BE DESIGNED AS PART OF FUTURE  ST
  ST

  ST
  0.57%  DEVELOPMENT PHASES

  )
  ST
  CB 31

  -301
  ST
  RIM 615.64
  ST

  E (C
  W INV 609.78

  STOP
  FUTURE RETAIL
  ST  ST  ST  ST

  12+00 ST
  FUTURE RETAIL
  ST
  E INV 609.78  ST  ST  ST  ST

  FUTURE RETAIL
  ST

  IN
  ST

  STOP
  ST  ST  ST

  FUTURE RETAIL
  ST  ST  ST  ST
  ST

  ST

  CHL
  ST

  110'x200'

  Sealed 07/20/2026
  )
  110'x200'

  -303
  110'x200'

  MAT
  22,000 SF  110'x200'

  ST
  74 LF 24"
  ST

  E (C
  22,000 SF  22,000 SF  22,000 SF
  HDPE @
  0.58%

  IN
  ST

  CHL
  ST

  CB 29

  MAT
  RIM 614.96
  CB 30
  N INV 609.54  FUTURE

  ST
  RIM 614.71
  ST

  ST
  PROPOSED STORM DRAINAGE STRUCTURES SHOWN
  W INV 610.21
  S INV 608.53  ST
  RESTAURANT  FUTURE RETAIL  FUTURE RETAIL
  PROPOSED STORM DRAINAGE LEGEND
  W/PROPOSED STORM DRAINAGE STRUCTURES AND
  100'x100'
  ST  E INV 610.21
  ST

  ST
  ASSOCIATED PIPING ARE SHOWN FOR INFORMATIONAL
  PURPOSES ONLY AND WILL BE DESIGNED AS PART OF  ST  100'x100'  PROPOSED STORM PIPE
  100'x100'  ST

  ST
  FUTURE DEVELOPMENT PHASES
  11+00  10,000 SF  PROPOSED PERFORATED 10,0

  ST
  10,000 SF  00 SF
  ST

  ST  PIPING TO BE INSTALLED DURING FUTURE PHASE OF WORK  33 LF 18"
  92 LF 24"  PROPOSED STORM DRAINAGE STRUCTURES AND  STORM PIPE
  ST

  HDPE @  DRAWING NAME:

  ST
  ST  HDPE @  ASSOCIATED PIPING ARE SHOWN FOR
  3.06%

  ST
  INFORMATIONAL PURPOSES ONLY AND WILL BE  PROPOSED CATCH BASIN
  ST

  0.63%
  ST  ST  ST  ST  ST  ST  ST  CB 27
  STOP
  DESIGNED AS PART OF FUTURE DEVELOPMENT  STOP  Storm Drainage
  ST

  ST  ST  ST  RIM 614.02  PHASES

  ST
  ST  ST  ST  ST
  Plan
  ST  ST  ST  ST
  N INV 611.11  PROPOSED MANHOLE

  ST
  ST  ST
  ST  ST  ST
  ST  ST  ST  ST  ST  ST  ST
  ST

  ST  ST
  ST
  ST  ST  ST  ST  ST  ST  ST  ST  ST
  ST  PROPOSED CLEANOUT
  ST  ST
  CB: CATCH BASIN
  CB 28  MH: MANHOLE  Date:  07/20/26
  WQu: WATER QUALITY TREATMENT UNIT
  RIM 613.79  Drawn By:  C. Wood
  SLADE DRIVE IMPROVEMENTS SHOWN  S INV 610.79  33 LF 18"  Scale:  As Noted
  10+00

  DESIGNED BY OTHERS. REFER TO OFFSITE  E INV 610.79  HDPE @
  0.97%  DRAWING NO.
  PLANS BY OTHERS

  STORM DRAINAGE PLAN  NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
  CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
  C-301
  SCALE: 1"=40'  40  0  40  80Ft.
  40'  Project No:  24-4113

  Page 1058 of 1174