Text · page 1059 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration. CURRENT All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145 Greensboro SHEET (DESIGNED BY OTHERS) (SHEET C-301) (SHEET C-303) Utica SHEET LOCATION MAP Buffalo S T SCALE: N.T.S. OP OP ST West Seneca Exchange FUT URE Slade Ave, Ridge Rd & Orchard Park Rd 1 80,3 -STOR 00 S Y RE P O ST .F. TAIL DN NOTE: FUTURE DEVELOPMENT AREAS SHOWN West Seneca New York PROPOSED PIPE CROSSING: 10" SAN. INV=604.50 42" STORM INV=606.58 ON THIS PLAN SET ARE CONSIDERED © CARMINA WOOD DESIGN TO BE CONCEPTUAL ONLY. WV CB 42 RIM 614.52 SW INV 611.34 Date ST ST ST CB 41 ST RIM 614.26 122 LF 18" NE INV 610.97 HDPE @ ST S) SW INV 610.97 W 0.30% HER NW INV 610.97 88 -B -BW 76 17+ -BW Y OT 76 ST CONNECT TO EXISTING 127 LF 18" ST -BW 76 HDPE @ No. Description MANHOLE WITH TIDEFLEX ST CB 39 ) 76 NS B -302 CHECK VALVE. CONNECT AT ST 0.30% RIM 614.35 EXISTING INVERT ELEVATION REVISIONS: NE INV 611.35 ST (PLA E (C ST 604.56±. ST IN PLUG EX. SW INV INE ST CHL CHL MAT ST ST MAT MATCHLINE (C-302) 00 ST 17+ 33 LF 12" ST MATCHLINE (C-301) IO ST CB 10 HDPE @ ST PAT 1.00% CB 11 RIM 614.73 RIM 614.85 FUT ST 183 LF 48" SW INV 612.73 HDPE @ ST NE INV 612.40 URE ST 130 RETA 0.50% ST SW INV 612.40 322 LF 24" HDPE @ ST ST 9,10 'x70' IL Sealed 07/20/2026 PROPOSED PIPE CROSSING: 49 LF 12" ST MH #2 0.39% ST FUT 10" SAN. INV=603.00 ST HDPE @ RIM 613.77 0 SF REST URE D ST ST 1.00% W INV 605.48 STOP 48" STORM INV=605.05 PROPOSED STORM DRAINAGE STRUCTURES AUR RIVE- 45 LF 18" ST NE INV 605.48 ST AND ASSOCIATED PIPING ARE SHOWN FOR WV ANT THR 23+56 IO HDPE @ INFORMATIONAL PURPOSES ONLY AND WILL ST ST 4,96 U 28 LF 24" CB 12 ST CA PAT 1.00% 26 UT BE DESIGNED AS PART OF FUTURE 3 SF IO HDPE @ ST RIM 614.76 ST 18+ N 0 CB 9 DEVELOPMENT PHASES 0 1.02% 21 LF 12" NE INV 611.91 16+ N RIM 613.85 IO ST HDPE @ NW INV 611.91 UT ST CA SW INV 611.35 1.00% +00 23+ ST 0 0 ST ST18 ST PROPOSED PIPE CROSSING: ST CB 13 ST PROPOSED STORM DRAINAGE LEGEND ST 8" SAN. INV=603.13 RIM 614.75 ST 24" STORM INV=608.20 CB 8 ST SE INV 611.70 ST PROPOSED STORM PIPE ST RIM 613.85 SW INV 611.70 ST ST NW INV 608.37 ST ST ST ST ST NE INV 610.90 CA CB 7 ST PROPOSED PERFORATED UT ST FUT IO ST SE INV 608.37 22+ STORM PIPE N RIM 612.85 ST ST PROPOSED PIPE CROSSING: ST 0 0 DRAWING NAME: 2,50 URE ST SW INV 610.85 80 LF 18" 8" SAN. INV=603.15 ST ST N ST ST CB 14 IO ST PROPOSED CATCH BASIN UT 0 G. Storm Drainage ST HDPE @ 48" STORM INV=605.56 ST CA ST RIM 615.20 40 LF 24" FUT ST BAN S.F. ST 1.00% S INV 609.50 HDPE @ RES URE D 00 ST CB 16 Plan ST ST K ST ST ST ST NW INV 609.50 PROPOSED MANHOLE 15+ CB 6 290 LF 12" 0.58% RIM 615.73 TAU RIV NT 2 E-TSTORM RAPROPOSED ST 00 T ST ST 45 LF 12" 17+ S ST HDPE @ RIM 612.85 HDPE @ 21+ 0 SE INV 609.73 HRU DRAINAGE STRUCTURES WV ST ST 0 SHOWN,3W/ASSOCIATED PIPING TO BE STOP NW INV 609.17 ST 0.80% SW INV 610.00 80DURING ST 1.53% PROPOSED CLEANOUT NE INV 610.16 ST ST ST N INV 609.73 INSTALLED SF FUTURE PHASE OF WORK ST ST SE INV 609.17 187 LF 48" ST CB: CATCH BASIN CB 15 21 LF 24" MH: MANHOLE STOP Date: 07/20/26 ST ST HDPE @ RIM 615.20 ST HDPE @ WQu: WATER QUALITY TREATMENT UNIT ST 0.51% ST 21 LF 18" ST Drawn By: C. Wood NE INV 609.38 0.57% CB 17 STOP ST 20+ HDPE @ RIM 615.73 Scale: As Noted CB 5 SE INV 609.38 00 40 LF 24" ST PROPOSED STORM DRAINAGE STRUCTURES 3.00% ST RIM 613.91 ST W INV 609.38 NE INV 610.63 DRAWING NO. 39 LF 12" AND ASSOCIATED PIPING ARE SHOWN FOR HDPE @ ST SW INV 611.91 ST INFORMATIONAL PURPOSES ONLY AND WILL 0.63% CB 38 STORM DRAINAGE PLAN ST ST HDPE @00 C-302 ST + BE DESIGNED AS PART OFFFUTURE UTU NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS, ST 14 1.00% RIM 615.03 STOP ST ST 137 LF 18" DEVELOPMENT PHASESR RE E INV 609.13 21 LF 18" CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. ESTA CB 18 ST HDPE @ URA DRIVE-T ST CB 2 HDPE @ ST SW INV 611.81 ST ST 1.00% PROPOSED PIPE CROSSING: 19+ RIM 614.38 40 0 40 80Ft. RIM 614.45 NT, H NW INV 609.13 0.52% SCALE: 1"=40' 2,30 RU ST 8" SAN. INV= 604.55 00 NW INV 608.34 ST 12+0 40' 00 16+ST 0 ST N INV 611.64 Project No: 24-4113 ST ST 0 SF 24" STORM INV=609.25 95 LF 24" ST 120 LF 18" CB 4 ST 35 LF 18" W INV 611.64 305 LF 48" HDPE @ CB 19 HDPE @ RIM 613.70 ST CB 37 HDPE @ 13+00 ST MH #1 HDPE @ 0.73% RIM 615.03 RIM 614.38 N INV 610.54 PROPOSED PIPE CROSSING: Page 1059 of 1174 ST 1.00% 1.00% ST ST SE INV 608.23 ST