Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 1060 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

0.57%  21 LF 18"  CB 17  ST

  CA
  UT
  20+  HDPE @  RIM 615.73

  IO
  00

  N
  40 LF 24"  3.00%
  HDPE @
  NE INV 610.63  MAT
  CHL

  N
  ST

  IO
  ST

  UT
  0.63%  CB 38  INE

  CA
  MAT
  sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor

  (C-3
  to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.

  RIM 615.03
  (SHEET C-302)  CHL  02)
  All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145

  E INV 609.13  21 LF 18"  CB 18  INE

  ST

  Greensboro
  SW INV 611.81  HDPE @  RIM 614.38  (C-3
  NW INV  19+
  (DESIGNED
  609.13 00  0.52%  NW INV 608.34  01)  MAT
  CHL
  00
  16+ST

  BY OTHERS)  INE
  MAT

  CA
  CB 19  (BY

  UT
  CB 37  CHL

  IO
  OTH

  N
  (SHEET C-301)  RIM 614.38
  RIM 615.03  PROPOSED PIPE CROSSING:  INE  ERS
  ST

  NE INV 612.02 SE INV 608.23  (C-3

  N
  8" SAN. INV= 605.10  )

  IO
  UT
  ST
  NW INV 608.23  03)

  CA
  21 LF 12"  18" STORM INV=608.15
  HDPE @  CURRENT SHEET  18+
  00

  Utica
  1.00%  48 LF 18"

  ST
  HDPE @
  0.48%
  SHEET LOCATION MAP
  48 LF 30"
  HDPE @  CB 20

  CA
  OFFSITE IMPROVEMENTS SHOWN DESIGNED BY

  UT
  RIM 614.22

  Buffalo
  IO
  0.64%  OTHERS. REFER TO OFFSITE PLANS BY OTHERS

  N
  CA
  END SECTION  17+0

  UT
  33 LF 12"  NW INV 612.22

  IO
  0

  N
  SCALE: N.T.S.  W/ RIPRAP PROPOSED PIPE CROSSING:

  N
  HDPE @

  IO
  UT
  ST
  END SECTION

  CA
  3.70%

  N
  IO
  8" SAN. INV= 605.67

  UT
  ST  W/ RIPRAP

  CA
  36" STORM INV=608.20  PROPOSED PIPE CROSSING:

  ST
  8" SAN. INV= 606.18
  18" STORM INV=608.30
  ST  47 LF 18"  16+  171 LF 18"
  ST  00  HDPE @
  HDPE @
  0.84%

  ST
  0.99%  ST

  CA
  UT
  IO
  N
  ST
  END SECTION  END SECTION

  ST

  N
  IO
  ST
  W/ RIPRAP

  UT
  W/ RIPRAP

  CA
  INV 607.95  ST  PROPOSED PIPE CROSSING:
  15+ 18" STORM INV= 612.60
  PROPOSED STORMWATER  CB 21
  RIM 614.22
  ST
  00
  42" STORM INV=608.60
  SW INV 611.00  ST
  MANAGEMENT AREA  SE INV 611.00
  NW INV 608.47  CB 22
  ST
  CB 23
  RIM 615.96  RIM 615.50
  ST
  SW INV 612.43

  West Seneca Exchange
  14+  NW INV 613.50
  NE INV 612.43  ST  00
  ST  165 LF 18"
  ST  HDPE @  45 LF 12"
  FUT  0.35%

  Slade Ave, Ridge Rd & Orchard Park Rd
  ST
  HDPE @
  2 , 9
  PROPOSED PIPE CROSSING:  URE  ST
  1.09%
  8" SAN. INV= 607.02 25
  ST  CB 24
  13+
  RET G.S.F.  STOP  00  RIM 615.51

  ST
  42" STORM INV=608.44  ST
  SW INV 613.01
  AIL  ST
  SE INV 613.01
  ST
  ST  NE INV 613.01
  ST
  ST  ST  ST  ST  ST  ST
  ST
  ST
  ST  ST  12+

  ST
  ST
  ST  ST  71 LF 18"  0 0
  HDPE @

  West Seneca New York
  ST
  PROPOSED STORMSTOP
  DRAINAGE STRUCTURES  ST

  STOP
  ST  ST
  0.78%  ST

  ST
  ST  ST
  AND ASSOCIATED PIPING ARE SHOWN FOR  ST  CB 25
  INFORMATIONAL PURPOSES ONLY AND WILL
  ST  RIM 616.12  ST  ST
  ST
  © CARMINA WOOD DESIGN

  ST

  STOP
  BE DESIGNED AS PART OF FUTURE  ST
  ST  SW INV 613.56  ST
  DEVELOPMENT PHASES  ST  NE INV 613.56  ST
  11+
  ST
  ST  ST
  FU  00
  01)

  RES TURE D
  ST  ST
  147 LF 18"
  (C-3

  TAU RIV
  STOP

  RAN E-TH HDPE  @  ST
  ST  ST  ST  ST  ST
  1.20%  MAT
  T 2, RU  CHL
  ST  ST  ST
  STOP

  ST
  INE

  ST  ST  ST
  380  MAT
  ST
  INE
  ST  ST  ST  ST
  PROPOSED STORM DRAINAGE STRUCTURES AND ASSOCIATED
  ST

  ST
  SF  CB 26  CHL  (BY
  CHL

  PIPING ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY AND
  WILL BE DESIGNED AS PART OF FUTURE DEVELOPMENT PHASES
  RIM 617.82  INE  OTH
  (C-3  ERS
  MAT

  NE INV 615.33
  )

  10
  0  )
  -303

  ST
  STOP  ST  +0
  0  3)
  E (C

  ST

  ST
  ST
  HLIN

  ST
  C

  FUTURE RETAIL
  MAT

  Date
RESTAURANT  FUTURE RETAIL
  100'x100'  100'x100'  EX. OFFICE
  ST

  10,000 SF  10,000 SF
  ST

  PROPOSED STORM DRAINAGE STRUCTURES AND  7,980 SF
  ST

  ASSOCIATED PIPING ARE SHOWN FOR
  ST

  STOP  INFORMATIONAL PURPOSES ONLY AND WILL BE
  DESIGNED AS PART OF FUTURE DEVELOPMENT  STOP
  PHASES
  ST

  No. Description
  ST

  ST

  REVISIONS:
  ST  ST  ST  ST  ST  ST  ST  ST  ST  ST  ST  ST  ST  ST  ST  ST  ST
  STOP

  SLADE DRIVE IMPROVEMENTS SHOWN
  DESIGNED BY OTHERS. REFER TO OFFSITE
  PLANS BY OTHERS

  Sealed 07/20/2026
  PROPOSED STORM DRAINAGE LEGEND
  PROPOSED STORM PIPE  ST

  PROPOSED PERFORATED
  STORM PIPE  DRAWING NAME:
  PROPOSED CATCH BASIN
  Storm Drainage
  PROPOSED MANHOLE  Plan
  PROPOSED CLEANOUT

  CB: CATCH BASIN
  MH: MANHOLE  Date:  07/20/26
  WQu: WATER QUALITY TREATMENT UNIT  Drawn By:  C. Wood
  Scale:  As Noted
  DRAWING NO.

  STORM DRAINAGE PLAN  NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
  CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
  C-303
  SCALE: 1"=40'  40  0  40  80Ft.
  40'  Project No:  24-4113

  Page 1060 of 1174