NW INV 610.97

  88
  17+
  ST
  CONNECT TO EXISTING  127 LF 18"

  ST
  MANHOLE WITH TIDEFLEX  ST  HDPE @  CB 39
  CHECK VALVE. CONNECT AT  ST  0.30%  RIM 614.35
  EXISTING INVERT ELEVATION  NE INV 611.35

  ST
  ST
  604.56±.
  sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
  to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.

  ST
  PLUG EX. SW INV
  All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145

  ST

  Greensboro
  ST

  ST
  00
  ST

  17+
  33 LF 12"

  ST
  IO
  ST  CB 10  HDPE @

  ST

  PAT
  1.00%  CB 11
  RIM 614.73
  RIM 614.85  FUT

  ST
  183 LF 48"  SW INV 612.73
  URE

  Utica
  ST  NE INV 612.40
  HDPE @

  ST
  130 RETA
  0.50%  ST  SW INV 612.40  322 LF 24"
  HDPE @

  ST
  ST

  PROPOSED PIPE CROSSING:  49 LF 12"  ST MH #2  9,10 'x70' IL  0.39%

  ST
  FUT  10" SAN. INV=603.00  ST  HDPE @  RIM 613.77
  0 SF

  Buffalo
  RES URE D

  ST

  ST
  1.00%  W INV 605.48

  STOP
  48" STORM INV=605.05  PROPOSED STORM DRAINAGE STRUCTURES
  TAU RIVE  45 LF 18"  NE INV 605.48
  ST
  AND ASSOCIATED PIPING ARE SHOWN FOR
  RAN -TH  ST
  23+56

  IO
  T 4, RU  HDPE @  INFORMATIONAL PURPOSES ONLY AND WILL

  ST
  ST
  28 LF 24"  CB 12

  T

  CA
  PAT
  96 3

  26
  S
  1.00%

  UT
  BE DESIGNED AS PART OF FUTURE

  IO
  HDPE @  ST  RIM 614.76  ST
  SF

  18+

  N
  00
  CB 9  1.02%  21 LF 12"  NE INV 611.91  DEVELOPMENT PHASES

  16+

  N
  RIM 613.85

  IO
  ST
  HDPE @  NW INV 611.91

  UT
  ST

  CA
  SW INV 611.35  1.00%

  +00
  23+  ST
  00

  ST

  ST18
  ST
  PROPOSED PIPE CROSSING:  ST  CB 13  ST

  ST
  8" SAN. INV=603.13  RIM 614.75

  ST
  24" STORM INV=608.20  CB 8  ST
  SE INV 611.70  ST
  RIM 613.85
  SW INV 611.70

  ST
  ST
  NW INV 608.37  ST

  ST

  ST
  ST
  ST
  CB 7  NE INV 610.90  ST
  ST

  ST
  RIM 612.85  SE INV 608.37  22+  ST

  ST
  PROPOSED PIPE CROSSING:  ST  00  ST
  SW INV 610.85  80 LF 18"  8" SAN. INV=603.15

  ST
  ST
  ST
  ST
  ST  CB 14

  ST
  HDPE @  ST  48" STORM INV=605.56  RIM 615.20
  ST
  FU

  ST
  1.00%  ST  40 LF 24"
  RES TURE D
  S INV 609.50  HDPE @
  00

  ST
  CB 16
  ST
  ST  ST

  ST
  ST

  ST
  NW INV 609.50
  15+

  CB 6  290 LF 12"  0.58%  RIM 615.73  TAU RIV
  NT 2 E-TSTORM
  RAPROPOSED
  ST

  West Seneca Exchange
  00 T
  ST  ST
  45 LF 12"

  17+ S
  ST
  HDPE @
  RIM 612.85  HDPE @  21+
  00
  SE INV 609.73  HRU DRAINAGE  STRUCTURES

  ST
  ST  SHOWN,3W/ASSOCIATED PIPING TO BE
  STOP

  NW INV 609.17  ST  0.80%  SW INV 610.00  80DURING

  ST
  1.53%  N INV 609.73  INSTALLED  SF FUTURE PHASE OF WORK
  NE INV 610.16  ST  ST
  ST
  ST

  ST
  SE INV 609.17  187 LF 48"  ST

  Slade Ave, Ridge Rd & Orchard Park Rd
  CB 15  21 LF 24"
  STOP

  ST
  ST
  HDPE @  RIM 615.20  ST
  HDPE @
  ST

  0.51%  ST
  NE INV 609.38  21 LF 18"  CB 17  ST
  0.57%
  CB 5  STOP  ST
  SE INV 609.38  20+  HDPE @  RIM 615.73
  ST
  PROPOSED STORM DRAINAGE STRUCTURES  00  40 LF 24"
  ST

  RIM 613.91  ST  W INV 609.38  3.00%  NE INV 610.63
  39 LF 12"  AND ASSOCIATED PIPING ARE SHOWN FOR  HDPE @

  ST
  SW INV 611.91

  ST
  INFORMATIONAL PURPOSES ONLY AND WILL  ST  0.63%  CB 38
  ST

  HDPE @00
  ST

  +  BE DESIGNED AS PART OFFFUTURE
  UTU
  ST

  14
  1.00%  RIM 615.03
  STOP

  ST
  137 LF 18"  DEVELOPMENT PHASESR  RE  E INV 609.13  21 LF 18"
  ESTA DR  CB 18

  ST
  HDPE @
  CB 2  URA IVE-T  HDPE @
  ST

  SW INV 611.81
  ST

  1.00%  PROPOSED PIPE CROSSING:  1  RIM 614.38
  RIM 614.45  NT,  H  9 +
  NW INV 609.13 00  0.52%
  2,30 RU  8" SAN. INV= 604.55  NW INV 608.34
  ST

  00
  16+ST
  N INV 611.64

  ST
  ST
  0 SF  24" STORM INV=609.25  95 LF 24"
  ST

  CB 4

  West Seneca New York
  ST

  W INV 611.64  305 LF 48"  HDPE @  CB 19
  RIM 613.70  ST  CB 37
  13+00  ST MH #1  HDPE @  0.73%  RIM 615.03  RIM 614.38  PROPOSED PIPE CROSSING:
  N INV 610.54

  ST
  NE INV 612.02 SE INV 608.23
  ST
  ST  0.50%

  ST
  ST

  NE INV 611.52  RIM 612.93  CB 36  8" SAN. INV= 605.10
  © CARMINA WOOD DESIGN

  ST
  ST  SW INV 606.43  ST  21 LF 12"  NW INV 608.23  18" STORM INV=608.15
  SE INV 610.54  RIM 614.04
  ST

  ST  E INV 606.43  HDPE @  18+

  ST
  ST  SE INV 608.44  00
  STOP

  ST
  1.00%  48 LF 18"  614

  ST
  STOP  SW INV 608.44

  ST
  ST
  HDPE @
  STOP

  ST
  ST  613
  75 LF 18"
  ST

  0.48% 608

  ST
  ST
  HDPE @  ST  48 LF 30"  612
  1.01%  ST  ST  HDPE @  CB 20
  ST
  604  611  RIM 614.22
  0.64%
  ST

  ST
  ST  END SECTION  61  17+0  33 LF 12"  NW INV 612.22
  W/ RIPRAP PROPOSED 0PIPE CROSSING:  0
  ST  ST
  609  HDPE @
  END SECTION

  0
  STOP FOR  3.70%

  1:4.
  0
  PROPOSED STORM DRAINAGE STRUCTURES  8" SAN. INV= 605.67
  ST

  1.6%
  0
  ST
  W/ RIPRAP

  15+
  AND ASSOCIATED PIPING ARE SHOWN
  ST  608
  36" STORM INV=608.20  PROPOSED PIPE CROSSING:
  21 LF 30"  1:4.
  ST

  ST

  ST
  INFORMATIONAL PURPOSES ONLY AND WILL  FOREBAY  8" SAN. INV= 606.18

  ST
  HDPE @  0

  604
  BE DESIGNED AS PART OF FUTURE

  608
  STOP

  ST  (1,250 CF)  18" STORM INV=608.30
  STOP  ST  DEVELOPMENT PHASES
  STOP  0.62%  ST
  2.0%
  607  47 LF 18"  16+  171 LF 18"
  00
  ST

  ST

  CB 35
  ST

  ST  15' AQUATIC BENCH
  604  HDPE @  ST  HDPE @
  RIM 614.04  0.84%

  ST
  ST  RIP-RAP PILOT  0.99%  ST
  NE INV 608.31

  Date
  CHANNEL

  2.1%
  606
  ST

  608
  ST

  ST
  ST  SW INV 608.31  1:6.
  STOP
  STOP  END SECTION  7  END SECTION WITH RIPRAP,
  END SECTION

  ST
  ST  FOREBAY  W/ RIPRAP  ST
  W/ RIPRAP  1:3.  (1,250 CF)  INV. 608.00. REFER TO

  7
  605  PROPOSED PIPE CROSSING:

  1:6.
  INV 607.95  0
  ST

  ST
  15+ 18" STORM INV= 612.60
  ST

  ST  PLANS BY OTHERS.
  ST  FOREBAY  PROPOSED STORMWATER  604  CB 21
  RIM 614.22
  ST
  00
  42" STORM INV=608.60

  60
  (1,250 CF)  608  604

  8
  603  SW INV 611.00  ST
  ST

  ST
  MANAGEMENT AREA
  ST

  00

  1.1%

  0
  SE INV 611.00
  14+

  6
  WET POND (50,000 CF) 02

  1:3.
  ST  ST
  ST
  NW INV 608.47  CB 22

  2.0%
  ST  21 LF 30"  END SECTION  PERMANENT POOL  RIM 615.96
  ST

  ST

  604
  ST
  HDPE @  W/ RIPRAP  ELEVATION 607.80  601.80  SW INV 612.43
  ST  RIP-RAP PILOT

  No. Description
  ST
  0.67%  ST  CHANNEL  BOTTOM OF  RIP-RAP PILOT  FOREBAY  NE INV 612.43
  BASIN (TYP.)

  1:3.0
  (1,250 CF)
  ST

  ST
  ST
  CHANNEL
INFORMATIONAL PURPOSES ONLY AND WILL

  REVISIONS:
  1:6.7
  ST
  ST  605  604 603  602
  606  0.2%
  607
  2,92

  604
  STOP  ST  609 608  PROPOSED PIPE CROSSING:
  STOP  CB 34  611 610
  STOP  90 LF 30"  612  8" SAN. INV= 607.02  5 G.

  608
  STOP  STOP  RIM 614.04  614 613
  CB 33
  RET S.F.

  1:4.0
  STOP  HDPE @  42" STORM INV=608.44
  ST

  10' WIDE BERM  END SECTION WITH RIPRAP,  1:4.
  ST

  W INV 608.87  STOP  RIM 614.04  0
  SW INV 608.87  NE INV 608.73
  0.81%  40' WIDE
  SPILLWAY  614
  INV. 608.00. REFER TO
  PLANS BY OTHERS.
  AIL
  T00

  SE INV 608.73  EL. 613.50
  ST
  13S+

  STOP

  ST  ST
  STOP

  ST  ST  ST  ST  ST  ST
  ST

  ST
  101 LF 24"  ST
  ST
  CBSTOP  HDPE @
  ST

  32  ST
  RIM 615.14  STOP  0.65%  PROPOSED STORMSTOP
  DRAINAGE STRUCTURES
  ST
  614.50

  STOP
  ST
  614.50
  ST

  ST
  W INV 609.52  AND ASSOCIATED PIPING ARE SHOWN FOR  TOP OF  TOP OF

  Sealed 07/20/2026
  ST
  E INV 609.52  45 LF 24"  BASIN (TYP.)
  ST

  ST
  INFORMATIONAL PURPOSES ONLY AND WILL  ST  BASIN (TYP.)
  HDPE @  BE DESIGNED AS PART OF FUTURE  ST
  ST
  0.57%  DEVELOPMENT PHASES  ST
  ST
  ST

  CB 31
  ST

  RIM 615.64

  WET POND PLAN & DETAIL
  SCALE: 1"=40'
  TOP OF BASIN EL. = 614.50  4  APPROX. EXISTING GRADE
  4  1  4
  100 YR EX. VS. 100 YR PRO. EL. (Qf) = 612.22  1
  1  SPILLWAY EL. = 613.50
  25 YR EX. VS. 25 YR PRO. EL. (Qf) = 611.43  DRAWING NAME:
  10 YR EX. VS. 10 YR PRO. EL. (Qp) = 610.89
  1 YR PRO. EL. (CPv) = 609.62
  Wet Pond Plan
  & Detail
  WET POND (50,000 CF)  3  FOREBAY 1 3
  3  PERMANENT POOL  3  1 (1,250 CF)  REFER TO PLAN FOR PIPE
  1  ELEVATION 607.80  1  INV. 608.00  SIZE, LENGTH, AND SLOPE.
  EX. 58" X 94"" STORM PIPE  675 LF 48" HDPE @ 0.50%  MITERED END SECTION  15' AQUATIC BENCH
  INV. = EL. 603.56  WITH CONC. EARS INLET  15' AQUATIC BENCH  (15% SLOPE)
  INV. 607.95  (15% SLOPE)  Date:  07/20/26
  EX. ST. M.H.  Drawn By:  C. Wood
  RIM 697.01
  Scale:  As Noted

  SECTION THROUGH WET POND
  S 48" INV 604.56 (NEW)
  NE EX. 58" X 94" INV 603.56  DRAWING NO.
  SW EX. 42" INV. 604.56 (TO BE PLUGGED)
  NOT TO SCALE

  C-304
  Project No:  24-4113

  Page 1061 of 1174