G.V. AT CONNECTION TO EX. 6" WATERMAIN
  ST  SANITARY LATERAL FROM PROPOSED

  ST
  BUILDING; TO BE INSTALLED DURING
  FUTURE PHASE OF CONSTRUCTION  PROPOSED 6"
  MATCHLINE (C-402)  ST
  PROP. CAP TO BE INSTALLED  GATE VALVE
  PROPOSED 10" AWWA C-900 PVC

  ST
  MATCHLINE (C-401)  JUST AFTER 6" GATE VALVE AS  COMBINED WATER SERVICE (5' MIN. COVER)

  IO
  APPROXIMATE LOCATION OF FUTURE  PROPOSED 10"x10"x8" TEE
  ST  SHOWN (FOR FUTURE USE)

  ST

  PAT
  WATER SERVICE TO PROPOSED
  FUT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor

  PROPOSED PIPE CROSSING:
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.

  BUILDING; TO BE INSTALLED DURING  PROPOSED 10" GATE VALVE

  ST
  URE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145

  (SHEET C-402)  10" SAN. INV=603.00  ST
  FUTURE PHASE OF CONSTRUCTION  PROPOSED

  Greensboro
  ST
  48" STORM INV=605.05  CONTRACTOR TO INSTALL PROPOSED 10" G.V.
  130 RETA
  TOP  PROPOSED  10" GATE
  (DESIGNED  S ST
  VALVE  AT CONNECTION TO EX. 10" WATERMAIN

  ST
  ST

  9,10 'x70' IL
  PROPOSED 10" GATE VALVE  STOP  10" GATE
  BY OTHERS)  VALVE

  ST
  CURRENT  FU  ST
  0 SF 10"x10"x6"  EXISTING WATERMAIN TO REMAIN & BE REUSED
  RES TURE D

  ST
  PROPOSED  MAINTAIN 18" VERTICAL  WITHIN SITE. ALL EXISTING TENANTS SHALL

  ST
  STOP
  SHEET  TAU RIVE  ST  TEE  CLEARING AT ALL  HAVE CONSTANT, UNINTERRUPTED WATER
  RAN -TH  ST
  STORM/SANITARY  SERVICE DURING CONSTRUCTION

  IO
  T , RPROPOSED

  ST
  ST
  963 U
  CONTRACTOR TO4INSTALL

  ST
  CROSSINGS, TYP.

  PAT
  10" G.V.  ST
  (SHEET C-403)  SFWATERMAIN
  ST

  Utica
  STOP
  AT CONNECTION TO EX. 10"  PROPOSED 10" GATE VALVE TO BE
  PROPOSED PIPE CROSSING:  PROP. 6" AWWA C-900 PVC  PROP. 8"  INSTALLED ON EX. 10" WATER SERVICE

  ST
  8" SAN. INV=603.15  ST  GATE VALVE  AS SHOWN FOR FUTURE CONNECTION
  COMBINED SERVICE (5' MIN. COVER)  STOP
  SHEET LOCATION MAP  SAN MH 5  STOP  48" STORM INV=605.56  ST
  SAN MH 12

  ST
  RIM 613.81
  PROPOSED PIPE CROSSING:TOP ST
  ST
  S

  ST
  ST

  Buffalo
  ST  RIM 616.78

  ST
  SE INV 602.84  OP  PROPOSED 8" AWWA C-900 PVC COMBINED

  ST
  8" SAN. INV=603.13  PROPOSED 6"  WATER SERVICE (5' MIN. COVER)  NW INV 607.33
  SCALE: N.T.S.  SW INV 602.84  24" STORM INV=608.20
  ST  ST
  GATE VALVE
  NW INV 602.74

  ST
  ST
  PROP. CAP TO BE INSTALLED  APPROXIMATE LOCATION OF
  ST  PROP. CAP TO BE

  ST

  ST
  FUTURE WATER SERVICE TO

  ST
  ST  113LF
  ST  JUST AFTER 6" GATE VALVE AS  INSTALLED JUST
  " PVC @  8
  ST
  PROPOSED BUILDING; TO BE
  0.50%

  FU  200 LF

  ST
  396 LF  ST  SHOWN (FOR FUTURE USE)  AFTER 10" GATE

  ST
  2,50 TURE
  ST
  10" SDR-35  INSTALLED DURING FUTURE  ST
  APPROXIMATE LOCATION OF FUTURE  8" SDR-35  VALVE AS SHOWN

  ST
  ST
  PROPOSED  PHASE OF CONSTRUCTION

  ST
  ST
  PVC @ 0.40%  ST
  PVC @ 0.40%  (FOR FUTURE USE)
  0 G.

  ST
  SANITARY LATERAL FROM PROPOSED  ST
  ST  8"x8"x6" TEE  APPROXIMATE LOCATION OF FUTURE
  STOP  FUTSANITARY LATERAL FROM PROPOSED

  ST
  BAN S.F.  BUILDING; TO BE INSTALLED DURING  ST
  FUTURE PHASE OF CONSTRUCTION  ST  URE TO BE INSTALLED DURING
  RES BUILDING;

  ST
  ST
  K
  ST

  ST
  ST

  ST
  TAFUTUREDRIV OF CONSTRUCTION  OFFSITE IMPROVEMENTS TO
  ST  U PHASE  E
  RAN -TH  CONNECT TO EXISTING SAN

  ST
  ST  ST
  ST
  T 2, RU  MANHOLE 12 AT INV. 607.43.

  ST
  ST
  380

  STOP
  ST

  ST
  STOP  REFER TO PLANS BY OTHERS.
  ST  ST
  ST
  SF

  ST
  ST
  CONTRACTOR TO PLUG  ST

  STOP

  ST
  EXISTING EAST INVERT;  ST
  APPROXIMATE LOCATION OF FUTURE  ST

  ST
  REFER TO DEMOLITION PLAN  PROPOSED 8" AWWA C-900

  STOP
  ST
  APPROXIMATE LOCATION OF FUTURE  SANITARY LATERAL FROM PROPOSED  ST
  SANITARY LATERAL FROM PROPOSED  BUILDING; TO BE INSTALLED DURING  PVC COMBINED WATER
  SAN MH 3  STOP  STOP  ST
  SERVICE (5' MIN. COVER)

  ST
  BUILDING; TO BE INSTALLED DURING  FUTURE PHASE OF CONSTRUCTION

  ST
  RIM 614.36  FUTURE PHASE OF CONSTRUCTION  SAN MH 4  STOP  ST

  West Seneca Exchange
  SAN MH 8

  ST
  ST
  S INV 601.31  RIM 612.66  ST

  ST
  RIM 613.96

  ST
  NW INV 601.21  SE INV 601.94  FU  MAINTAIN 18" VERTICAL CLEARING AT

  ST
  RES TURE D

  STOP
  ST  SW INV 604.52
  ST
  ALL STORM/SANITARY CROSSINGS, TYP.
  N INV 601.84

  ST
  TAU RIV  NE INV 604.42
  STOP
  ST

  ST
  ST
  RAN E-TH

  Slade Ave, Ridge Rd & Orchard Park Rd
  ST
  ST  133 LF  T, 2 RU

  ST
  ,300  PROPOSED PIPE CROSSING:

  ST
  ST

  ST
  10" SDR-35  ST

  ST
  SF  8" SAN. INV= 604.55

  ST
  PVC @ 0.40%  ST  24" STORM INV=609.25  209 LF
  PROPOSED PIPE CROSSING:
  PROPOSED PIPE CROSSING:  8" SDR-35

  ST
  10" SAN. INV=601.18  ST
  ST  PVC @ 0.85%

  ST

  ST
  18" STORM INV=611.95  232 LF  8" SAN. INV= 605.10
  STOP

  ST
  ST  ST
  8" SDR-35  18" STORM INV=608.15
  ORCHARD PARK ROAD IMPROVEMENTS SHOWN

  ST
  ST  PVC @ 0.40%

  ST
  ST

  STOP
  DESIGNED BY OTHERS. REFER TO OFFSITE  ST

  ST
  STOP  STOP

  ST
  PLANS BY OTHERS  ST

  STOP
  ST
  ST  PROPOSED 6" GATE VALVE

  ST

  ST
  ST
  ST
  ST  ST  ST  PROP. 6" AWWA C-900 PVC  SAN MH 9

  West Seneca New York
  APPROXIMATE LOCATION OF FUTURE SERVICE TO  ST  COMBINED SERVICE (5' MIN. COVER)  RIM 613.17
  ST

  ST
  ST
  PROPOSED BUILDING; TO BE INSTALLED DURING  ST  PROPOSED  SW INV 605.55
  FUTURE PHASE OF CONSTRUCTION  ST  ST  8"x8"x6" TEE  SE INV 605.55
  © CARMINA WOOD DESIGN

  STOP  NE INV 605.45

  ST
  ST  ST
  ST

  PROPOSED PIPE CROSSING:

  ST
  ST

  ST
  ST
  INV.  PROP. CAP TO BE INSTALLED  8" SAN. INV= 605.67

  STOP
  599.80  JUST AFTER 6" GATE VALVE AS
  ST
  STOP  ST
  STOP
  36" STORM INV=608.20
  ST

  SHOWN (FOR FUTURE USE)  ST
  ST

  ST

  ST
  ST

  ST
  320 LF  ST
  ST

  ST

  10" SDR-35

  ST

  ST
  ST

  STOP
  PVC @ 0.40%  PROPOSED 8" AWWA C-900  STOP  PROPOSED PIPE CROSSING:

  ST
  ST
  PVC COMBINED WATER  8" SAN. INV= 606.18
  ST

  ST

  ST

  ST
  ST  SERVICE (5' MIN. COVER)  18" STORM INV=608.30
  ST  PROPOSED STORMWATER
  ST

  ST
  MANAGEMENT AREA
  ST

  ST
  ST
  ST  ST
  ST

  ST

  ST

  Date
  ST
  ST
  ST  ST
  ST
  ST

  ST

  ST
  SAN MH 1  ST  ST
  (DOGHOUSE)  FUTURE FIRE  APPROXIMATE LOCATION OF  MAINTAIN 18" VERTICAL CLEARING AT  ST
  ST

  RIM 615.82  HYDRANT  FUTURE 6" COMBINED SERVICE  ALL STORM/SANITARY CROSSINGS, TYP.  APPROXIMATE LOCATION OF
  STOP  STOP  FUTURE FIRE  ST  FUTURE 6" COMBINED SERVICE
  S INV 599.64  STOP  STOP  HYDRANT
  E INV 599.54  STOP  STOP  45° BENDS
  ST

  STOP  STOP

  ST
  W INV 599.54

  ST
  STOP  PROPOSED 6" GATE VALVE
  FUTURE FIRE

  No. Description
  SAN MH 2  HYDRANT

  ST

  ST
  APPROXIMATE LOCATION OF FUTURE WATER

  STOP
  RIM 614.70  PROPOSED CAP TO BE INSTALLED JUST AFTER  SERVICE TO PROPOSED BUILDING; TO BE INSTALLED

  REVISIONS:
  48 LF  ST  ST

  STOP
  SE INV 599.93
  ST
  6" GATE VALVE AS SHOWN (FOR FUTURE USE)  DURING FUTURE PHASE OF CONSTRUCTION
  ST  ST  ST  ST  ST
  10" SDR-35

  ST
  N INV 599.83  ST
  ST
  PVC @ 0.40%  ST
  STOP

  ST
  ST
  PROPOSED 6" GATE VALVE  STOP  PROPOSED CAP TO BE INSTALLED  ST
  STOP
  ST

  ST
  JUST AFTER 6" GATE VALVE AS  ST
  PROPOSED 6" AWWA C-900 PVC COMBINED  SHOWN (FOR FUTURE USE)  ST

  ST
  ST
  ST
  WATER SERVICE (5' MIN. COVER)  ST
  ST

  ST

  01)
  PROPOSED 6" AWWA C-900 PVC COMBINED

  ST
  WATER SERVICE (5' MIN. COVER)

  ST

  (C-4
  PROPOSED 8" AWWA C-900 PVC COMBINED
  WATER SERVICE (5' MIN. COVER)
  ST

  (2) PROPOSED 8"x8"x6" 3-WAY TEE

  STOP
  FUTURE RETAIL

  INE
  ST  ST  ST  ST

  ST
  FUTURE RETAIL
  ST  ST  ST  ST  ST

  FUTURE RETAIL
  ST  ST

  STOP
  ST  ST

  CHL
  ST

  FUTURE RETAIL
  ST  ST  ST  ST
  ST

  ST  ST

  03)
  110'x200'  PROVIDE BENDS &

  Sealed 07/20/2026
  110'x200'

  MAT
  BLOCKING AS REQUIRED
  110'x200'

  (C-4
  22,000 SF  110'x200'

  ST
  ST

  22,000 SF

  INE
  INV.
  599.23  22,000 SF  22,000 SF

  CHL
  PROPOSED UTILITY LEGEND

  ST
  PROPOSED CAP TO BE INSTALLED JUST AFTER
  ST

  6" GATE VALVE AS SHOWN (FOR FUTURE USE)

  MAT
  PROPOSED 6" AWWA C-900 PVC COMBINED SERVICE (5' MIN. COVER)  ST
  FUTURE  PROPOSED STORM SEWER

  ST
  ST

  ST  PROPOSED 6" GATE VALVE
  PROPOSED CAP TO BE INSTALLED JUST AFTER
  ST
  RESTAURANT
  APPROX. LOCATION OF FUTURE
  SANITARY LATERAL FROM PROP.  FUTURE RETAIL  FUTURE RETAIL
  PROPOSED SANITARY SEWER  6" SA
  BUILDING; TO BE INSTALLED
  100'x100'
  ST
  APPROXIMATE LOCATION OF FUTURE WATER
  ST

  6" GATE VALVE AS SHOWN (FOR FUTURE USE)
  PROPOSED WATERLINE100'x100'
  DURING FUTURE PHASE OF
  ST
  SERVICE TO PROPOSED BUILDING; TO BE INSTALLED
  DURING FUTURE PHASE OF CONSTRUCTION
  ST  100'x100'  CONSTRUCTION  1" W

  ST
  10,000 SF  10,000 SF CB

  ST
  10,000 SF
  ST

  ST  APPROXIMATE LOCATION OF FUTURE
  WATER SERVICE TO PROPOSED  PROPOSED CATCH BASIN
  ST

  PROPOSED  DRAWING NAME:

  ST
  ST  BUILDING; TO BE INSTALLED DURING  APPROXIMATE LOCATION OF FUTURE WATER
  8"x8"x6"

  ST
  FUTURE PHASE OF CONSTRUCTION  SERVICE TO PROPOSED BUILDING; TO BE INSTALLED
  ST

  ST  ST  ST  ST  ST  ST  ST
  4-WAY TEE  STOP  DURING FUTURE PHASE OF CONSTRUCTION  STOP  PROPOSED YARD DRAIN  YD  Utility Plan
  ST

  ST  ST  ST

  ST
  ST  ST  ST  ST  ST  ST  ST  ST

  ST
  ST  ST
  ST
  MH
  ST
  ST  ST  ST  ST  ST  ST  ST  ST  PROPOSED MANHOLE
  ST

  ST
  ST  PROVIDE BENDS &  ST  ST  ST  ST  ST  ST  ST  ST  ST  ST
  ST  BLOCKING AS REQUIRED
  ST
  PROPOSED 6" GATE VALVE
  ST
  PROPOSED
  APPROXIMATE LOCATION OF FUTURE SANITARY LATERAL FROM  HYDRANT ASSEMBLY
  PROPOSED
  BUILDING; TO BE INSTALLED DURING FUTURE PHASE OF CONSTRUCTION
  Date:  07/20/26
  PROPOSED GATE VALVE  GV  Drawn By:  C. Wood
  Scale:  As Noted
  NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A
  SLADE DRIVE IMPROVEMENTS SHOWN  APPROXIMATE LOCATION OF FUTURE  3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE DRAWING NO.
  DESIGNED BY OTHERS. REFER TO OFFSITE  SANITARY LATERAL FROM PROPOSED  PROPOSED 8"  COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE
  PLANS BY OTHERS  BUILDING; TO BE INSTALLED DURING  G.V. (BY ECWA)
  UTILITY PLAN  BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
  FUTURE PHASE OF CONSTRUCTION
  PROPOSED 8" AWWA C-900 PVC COMBINED
  WATER SERVICE (5' MIN. COVER)
  PROP. HOTBOX
  INSULATED ENCLOSURE
  PROPOSED 8" CLASS 52 DUCTILE IRON
  COMBINED WATER SERVICE (5' MIN. COVER)
  PROPOSED 24"x24"x8"
  TAPPING SLEEVE &
  VALVE (BY ECWA)  SCALE: 1"=40'
  NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
  CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
  C-401
  Project No:  24-4113
  40  0  40  80Ft.
  40'
  Page 1064 of 1174