Text · page 1064 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
G.V. AT CONNECTION TO EX. 6" WATERMAIN ST SANITARY LATERAL FROM PROPOSED ST BUILDING; TO BE INSTALLED DURING FUTURE PHASE OF CONSTRUCTION PROPOSED 6" MATCHLINE (C-402) ST PROP. CAP TO BE INSTALLED GATE VALVE PROPOSED 10" AWWA C-900 PVC ST MATCHLINE (C-401) JUST AFTER 6" GATE VALVE AS COMBINED WATER SERVICE (5' MIN. COVER) IO APPROXIMATE LOCATION OF FUTURE PROPOSED 10"x10"x8" TEE ST SHOWN (FOR FUTURE USE) ST PAT WATER SERVICE TO PROPOSED FUT sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor PROPOSED PIPE CROSSING: to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration. BUILDING; TO BE INSTALLED DURING PROPOSED 10" GATE VALVE ST URE All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145 (SHEET C-402) 10" SAN. INV=603.00 ST FUTURE PHASE OF CONSTRUCTION PROPOSED Greensboro ST 48" STORM INV=605.05 CONTRACTOR TO INSTALL PROPOSED 10" G.V. 130 RETA TOP PROPOSED 10" GATE (DESIGNED S ST VALVE AT CONNECTION TO EX. 10" WATERMAIN ST ST 9,10 'x70' IL PROPOSED 10" GATE VALVE STOP 10" GATE BY OTHERS) VALVE ST CURRENT FU ST 0 SF 10"x10"x6" EXISTING WATERMAIN TO REMAIN & BE REUSED RES TURE D ST PROPOSED MAINTAIN 18" VERTICAL WITHIN SITE. ALL EXISTING TENANTS SHALL ST STOP SHEET TAU RIVE ST TEE CLEARING AT ALL HAVE CONSTANT, UNINTERRUPTED WATER RAN -TH ST STORM/SANITARY SERVICE DURING CONSTRUCTION IO T , RPROPOSED ST ST 963 U CONTRACTOR TO4INSTALL ST CROSSINGS, TYP. PAT 10" G.V. ST (SHEET C-403) SFWATERMAIN ST Utica STOP AT CONNECTION TO EX. 10" PROPOSED 10" GATE VALVE TO BE PROPOSED PIPE CROSSING: PROP. 6" AWWA C-900 PVC PROP. 8" INSTALLED ON EX. 10" WATER SERVICE ST 8" SAN. INV=603.15 ST GATE VALVE AS SHOWN FOR FUTURE CONNECTION COMBINED SERVICE (5' MIN. COVER) STOP SHEET LOCATION MAP SAN MH 5 STOP 48" STORM INV=605.56 ST SAN MH 12 ST RIM 613.81 PROPOSED PIPE CROSSING:TOP ST ST S ST ST Buffalo ST RIM 616.78 ST SE INV 602.84 OP PROPOSED 8" AWWA C-900 PVC COMBINED ST 8" SAN. INV=603.13 PROPOSED 6" WATER SERVICE (5' MIN. COVER) NW INV 607.33 SCALE: N.T.S. SW INV 602.84 24" STORM INV=608.20 ST ST GATE VALVE NW INV 602.74 ST ST PROP. CAP TO BE INSTALLED APPROXIMATE LOCATION OF ST PROP. CAP TO BE ST ST FUTURE WATER SERVICE TO ST ST 113LF ST JUST AFTER 6" GATE VALVE AS INSTALLED JUST " PVC @ 8 ST PROPOSED BUILDING; TO BE 0.50% FU 200 LF ST 396 LF ST SHOWN (FOR FUTURE USE) AFTER 10" GATE ST 2,50 TURE ST 10" SDR-35 INSTALLED DURING FUTURE ST APPROXIMATE LOCATION OF FUTURE 8" SDR-35 VALVE AS SHOWN ST ST PROPOSED PHASE OF CONSTRUCTION ST ST PVC @ 0.40% ST PVC @ 0.40% (FOR FUTURE USE) 0 G. ST SANITARY LATERAL FROM PROPOSED ST ST 8"x8"x6" TEE APPROXIMATE LOCATION OF FUTURE STOP FUTSANITARY LATERAL FROM PROPOSED ST BAN S.F. BUILDING; TO BE INSTALLED DURING ST FUTURE PHASE OF CONSTRUCTION ST URE TO BE INSTALLED DURING RES BUILDING; ST ST K ST ST ST ST TAFUTUREDRIV OF CONSTRUCTION OFFSITE IMPROVEMENTS TO ST U PHASE E RAN -TH CONNECT TO EXISTING SAN ST ST ST ST T 2, RU MANHOLE 12 AT INV. 607.43. ST ST 380 STOP ST ST STOP REFER TO PLANS BY OTHERS. ST ST ST SF ST ST CONTRACTOR TO PLUG ST STOP ST EXISTING EAST INVERT; ST APPROXIMATE LOCATION OF FUTURE ST ST REFER TO DEMOLITION PLAN PROPOSED 8" AWWA C-900 STOP ST APPROXIMATE LOCATION OF FUTURE SANITARY LATERAL FROM PROPOSED ST SANITARY LATERAL FROM PROPOSED BUILDING; TO BE INSTALLED DURING PVC COMBINED WATER SAN MH 3 STOP STOP ST SERVICE (5' MIN. COVER) ST BUILDING; TO BE INSTALLED DURING FUTURE PHASE OF CONSTRUCTION ST RIM 614.36 FUTURE PHASE OF CONSTRUCTION SAN MH 4 STOP ST West Seneca Exchange SAN MH 8 ST ST S INV 601.31 RIM 612.66 ST ST RIM 613.96 ST NW INV 601.21 SE INV 601.94 FU MAINTAIN 18" VERTICAL CLEARING AT ST RES TURE D STOP ST SW INV 604.52 ST ALL STORM/SANITARY CROSSINGS, TYP. N INV 601.84 ST TAU RIV NE INV 604.42 STOP ST ST ST RAN E-TH Slade Ave, Ridge Rd & Orchard Park Rd ST ST 133 LF T, 2 RU ST ,300 PROPOSED PIPE CROSSING: ST ST ST 10" SDR-35 ST ST SF 8" SAN. INV= 604.55 ST PVC @ 0.40% ST 24" STORM INV=609.25 209 LF PROPOSED PIPE CROSSING: PROPOSED PIPE CROSSING: 8" SDR-35 ST 10" SAN. INV=601.18 ST ST PVC @ 0.85% ST ST 18" STORM INV=611.95 232 LF 8" SAN. INV= 605.10 STOP ST ST ST 8" SDR-35 18" STORM INV=608.15 ORCHARD PARK ROAD IMPROVEMENTS SHOWN ST ST PVC @ 0.40% ST ST STOP DESIGNED BY OTHERS. REFER TO OFFSITE ST ST STOP STOP ST PLANS BY OTHERS ST STOP ST ST PROPOSED 6" GATE VALVE ST ST ST ST ST ST ST PROP. 6" AWWA C-900 PVC SAN MH 9 West Seneca New York APPROXIMATE LOCATION OF FUTURE SERVICE TO ST COMBINED SERVICE (5' MIN. COVER) RIM 613.17 ST ST ST PROPOSED BUILDING; TO BE INSTALLED DURING ST PROPOSED SW INV 605.55 FUTURE PHASE OF CONSTRUCTION ST ST 8"x8"x6" TEE SE INV 605.55 © CARMINA WOOD DESIGN STOP NE INV 605.45 ST ST ST ST PROPOSED PIPE CROSSING: ST ST ST ST INV. PROP. CAP TO BE INSTALLED 8" SAN. INV= 605.67 STOP 599.80 JUST AFTER 6" GATE VALVE AS ST STOP ST STOP 36" STORM INV=608.20 ST SHOWN (FOR FUTURE USE) ST ST ST ST ST ST 320 LF ST ST ST 10" SDR-35 ST ST ST STOP PVC @ 0.40% PROPOSED 8" AWWA C-900 STOP PROPOSED PIPE CROSSING: ST ST PVC COMBINED WATER 8" SAN. INV= 606.18 ST ST ST ST ST SERVICE (5' MIN. COVER) 18" STORM INV=608.30 ST PROPOSED STORMWATER ST ST MANAGEMENT AREA ST ST ST ST ST ST ST ST Date ST ST ST ST ST ST ST ST SAN MH 1 ST ST (DOGHOUSE) FUTURE FIRE APPROXIMATE LOCATION OF MAINTAIN 18" VERTICAL CLEARING AT ST ST RIM 615.82 HYDRANT FUTURE 6" COMBINED SERVICE ALL STORM/SANITARY CROSSINGS, TYP. APPROXIMATE LOCATION OF STOP STOP FUTURE FIRE ST FUTURE 6" COMBINED SERVICE S INV 599.64 STOP STOP HYDRANT E INV 599.54 STOP STOP 45° BENDS ST STOP STOP ST W INV 599.54 ST STOP PROPOSED 6" GATE VALVE FUTURE FIRE No. Description SAN MH 2 HYDRANT ST ST APPROXIMATE LOCATION OF FUTURE WATER STOP RIM 614.70 PROPOSED CAP TO BE INSTALLED JUST AFTER SERVICE TO PROPOSED BUILDING; TO BE INSTALLED REVISIONS: 48 LF ST ST STOP SE INV 599.93 ST 6" GATE VALVE AS SHOWN (FOR FUTURE USE) DURING FUTURE PHASE OF CONSTRUCTION ST ST ST ST ST 10" SDR-35 ST N INV 599.83 ST ST PVC @ 0.40% ST STOP ST ST PROPOSED 6" GATE VALVE STOP PROPOSED CAP TO BE INSTALLED ST STOP ST ST JUST AFTER 6" GATE VALVE AS ST PROPOSED 6" AWWA C-900 PVC COMBINED SHOWN (FOR FUTURE USE) ST ST ST ST WATER SERVICE (5' MIN. COVER) ST ST ST 01) PROPOSED 6" AWWA C-900 PVC COMBINED ST WATER SERVICE (5' MIN. COVER) ST (C-4 PROPOSED 8" AWWA C-900 PVC COMBINED WATER SERVICE (5' MIN. COVER) ST (2) PROPOSED 8"x8"x6" 3-WAY TEE STOP FUTURE RETAIL INE ST ST ST ST ST FUTURE RETAIL ST ST ST ST ST FUTURE RETAIL ST ST STOP ST ST CHL ST FUTURE RETAIL ST ST ST ST ST ST ST 03) 110'x200' PROVIDE BENDS & Sealed 07/20/2026 110'x200' MAT BLOCKING AS REQUIRED 110'x200' (C-4 22,000 SF 110'x200' ST ST 22,000 SF INE INV. 599.23 22,000 SF 22,000 SF CHL PROPOSED UTILITY LEGEND ST PROPOSED CAP TO BE INSTALLED JUST AFTER ST 6" GATE VALVE AS SHOWN (FOR FUTURE USE) MAT PROPOSED 6" AWWA C-900 PVC COMBINED SERVICE (5' MIN. COVER) ST FUTURE PROPOSED STORM SEWER ST ST ST PROPOSED 6" GATE VALVE PROPOSED CAP TO BE INSTALLED JUST AFTER ST RESTAURANT APPROX. LOCATION OF FUTURE SANITARY LATERAL FROM PROP. FUTURE RETAIL FUTURE RETAIL PROPOSED SANITARY SEWER 6" SA BUILDING; TO BE INSTALLED 100'x100' ST APPROXIMATE LOCATION OF FUTURE WATER ST 6" GATE VALVE AS SHOWN (FOR FUTURE USE) PROPOSED WATERLINE100'x100' DURING FUTURE PHASE OF ST SERVICE TO PROPOSED BUILDING; TO BE INSTALLED DURING FUTURE PHASE OF CONSTRUCTION ST 100'x100' CONSTRUCTION 1" W ST 10,000 SF 10,000 SF CB ST 10,000 SF ST ST APPROXIMATE LOCATION OF FUTURE WATER SERVICE TO PROPOSED PROPOSED CATCH BASIN ST PROPOSED DRAWING NAME: ST ST BUILDING; TO BE INSTALLED DURING APPROXIMATE LOCATION OF FUTURE WATER 8"x8"x6" ST FUTURE PHASE OF CONSTRUCTION SERVICE TO PROPOSED BUILDING; TO BE INSTALLED ST ST ST ST ST ST ST ST 4-WAY TEE STOP DURING FUTURE PHASE OF CONSTRUCTION STOP PROPOSED YARD DRAIN YD Utility Plan ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST MH ST ST ST ST ST ST ST ST ST PROPOSED MANHOLE ST ST ST PROVIDE BENDS & ST ST ST ST ST ST ST ST ST ST ST BLOCKING AS REQUIRED ST PROPOSED 6" GATE VALVE ST PROPOSED APPROXIMATE LOCATION OF FUTURE SANITARY LATERAL FROM HYDRANT ASSEMBLY PROPOSED BUILDING; TO BE INSTALLED DURING FUTURE PHASE OF CONSTRUCTION Date: 07/20/26 PROPOSED GATE VALVE GV Drawn By: C. Wood Scale: As Noted NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A SLADE DRIVE IMPROVEMENTS SHOWN APPROXIMATE LOCATION OF FUTURE 3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE DRAWING NO. DESIGNED BY OTHERS. REFER TO OFFSITE SANITARY LATERAL FROM PROPOSED PROPOSED 8" COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE PLANS BY OTHERS BUILDING; TO BE INSTALLED DURING G.V. (BY ECWA) UTILITY PLAN BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK. FUTURE PHASE OF CONSTRUCTION PROPOSED 8" AWWA C-900 PVC COMBINED WATER SERVICE (5' MIN. COVER) PROP. HOTBOX INSULATED ENCLOSURE PROPOSED 8" CLASS 52 DUCTILE IRON COMBINED WATER SERVICE (5' MIN. COVER) PROPOSED 24"x24"x8" TAPPING SLEEVE & VALVE (BY ECWA) SCALE: 1"=40' NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS, CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. C-401 Project No: 24-4113 40 0 40 80Ft. 40' Page 1064 of 1174