Site Access

The project will utilize driveway connections from Orchard Park Road and Slade Avenue for site access.
The existing signalized driveway across from Wegmans on Orchard Park Road and the existing signalized
driveway on Slade Avenue will be upgraded. An additional signalized driveway will be installed across
from the existing driveway to the Ellicott Development parcel to the west. Off-site roadway
improvements and modifications to Orchard Park Road and Slade Avenue are also proposed, as shown on
the Site Plan. These improvements were designed in accordance with the recommendations in the Traffic
Report prepared by Passaro. All driveway and off-site improvement plans have been submitted to Erie
County Highway (Slade Ave) and NYSDOT (Orchard Park Road/Ridge Road) for their review.

Grading/Storm Drainage

The project site is currently graded towards existing drainage structures throughout the site
and drains to the existing surrounding public storm sewer infrastructure. It is the intent to grade and
slope the proposed parking areas to proposed onsite catch basins and to reuse the existing storm
connections. There is not currently any storm water management on site.

The proposed redevelopment will collect and convey stormwater through a system of catch basins, yard
drains, manholes, HDPE storm sewer pipe, and a wet pond designed to accommodate the ultimate build
out of the site. The project will require coverage under the NYSDEC SPDES General Permit for Stormwater
Discharges from Construction Activity (GP-0-25-001) because the area of disturbance exceeds 1 acre and
will be reviewed under the NYSDEC redevelopment guidelines. The proposed stormwater management
system provides the required Water Quality Volume (WQv) treatment and peak flow attenuation in
accordance with Town of West Seneca and NYSDEC requirements before discharging to the existing storm
sewer system and ultimately to Cazenovia Creek.

Water/Sewer/Utilities

Utility upgrades for the project include significant modifications to the existing private water and sewer
mains on site.
A looped private water main system will utilize the existing water connection at Orchard Park Road and
add a new connection to the main on Slade Avenue. The proposed buildings will connect to the on site
private main. The proposed Costco will reuse the existing water connection on Ridge Road. Private
hydrants will be installed throughout the site to provide fire protection, Buildings will be sprinklered
where required by the NYS Building Code. All connections to the public mains will have backflow
preventers and meters approved by ECWA.
The majority of the existing private sanitary sewer system will be replaced, with the connection at Slade
Avenue being reused. The existing Tops will tie into this new private on-site system. The future buildings
along Slade Avenue will tie directly to the public main on Slade Avenue. A downstream sanitary sewer
capacity analysis (DSCA) was completed and previously submitted to the town as part of the rezoning
process. The DSCA did not indicate any capacity issues and I/I mitigation will be provided as part of the
project in accordance with NYSDEC and Town requirements.

  Page 1080 of 1174