Text · page 1081 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
The proposed buildings will connect to the public gas, electric and telephone infrastructure in the adjacent right of ways. Wetlands/Flood Plain State or Federal Wetlands are not present on site, nor are 100-year or 500-year floodplain. If you should have any questions regarding this letter, please contact me at (716) 550-3342. Thank you. Sincerely, Christopher Wood, PE | President, Civil Engineering Page 1081 of 1174