Stormwater Management Report July 2026 Proposed Development West Seneca, NY 3.0 SITE CONSTRUCTION AND EROSION CONTROLS The proposed erosion and sediment control plan will be implemented in two phases throughout construction. Phase 1 consists of installing the initial perimeter erosion and sediment control measures prior to the commencement of any earth-disturbing activities. These measures include filter socks at existing storm drainage inlets, stabilized rock construction entrances, and silt fence installed around the limits of disturbance to prevent sediment from leaving the project site. During Phase 2, the perimeter erosion and sediment control measures and stabilized construction entrances will remain in place throughout construction. All newly constructed storm drainage inlets will be protected with approved inlet protection devices until the contributing drainage areas have been permanently stabilized. Areas that have reached final grade shall be promptly stabilized with a minimum of six (6) inches of topsoil, followed by seeding and mulch. Slopes steeper than 3H:1V shall be stabilized with wildlife-friendly erosion control matting composed of all-natural materials with no photodegradable synthetic components prior to the application of seed and mulch. Topsoil stripped during construction shall be stockpiled on-site for reuse. All topsoil stockpiles shall be temporarily stabilized with seed and surrounded by filter socks or other approved sediment control measures to minimize erosion and prevent off-site sediment transport. Any dewatering associated with trench excavation, stormwater management facilities, or other construction activities shall be conducted in a manner that prevents sediment discharge and avoids the creation of accelerated erosion. Throughout construction, all erosion and sediment control best management practices (BMPs) shall be inspected at least once per week and after each significant rainfall event. Any damaged or ineffective BMPs shall be repaired, replaced, or supplemented within 24 hours of the inspection or rainfall event to maintain their effectiveness. Refer to the project plans for the complete construction sequence and erosion and sediment control requirements. [Type here] -7- 2401824 Page 1152 of 1174