Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 1153 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

Stormwater Management Report  July 2026
Proposed Development
West Seneca, NY

4.0  CONCLUSIONS & RECOMMENDATION
With the implementation of the proposed stormwater management system for this project, in
conjunction with the master-planned stormwater management system constructed as part of
the overall development, the proposed project will not result in adverse impacts to on-site
conditions, downstream properties, or off-site storm drainage systems. The combined stormwater
management system has been designed to mitigate post-development peak runoff rates in
accordance with the project design criteria. The on-site storm drainage collection system has
been sized to convey the 25-year design storm without ponding or hydraulic surcharge above
catch basin or manhole grate elevations.

This report has been prepared to supplement the accompanying project plans and to provide
the technical basis for the stormwater management design presented herein. Based on the
analyses performed and the proposed design, it is our opinion that the stormwater management
system has been designed in general conformance with the applicable requirements of the
Town of West Seneca and the New York State Stormwater Management Design Manual.

[Type here]  -8-  2401824

  Page 1153 of 1174