Text · page 411 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1 DEC Region 9 15. Site Latitude & Longitude 42.871757741927205,-78.78125301461476 Project Details 16. This eNOI submission is for: A construction activity not part of a common plan of development or sale in accordance with Part I.D.1.a. 17. Does the project type fall under Table 1 or Table 2 of Appendix B of GP-0-25-001? If any portion of the construction activity falls under Table 2, regardless of the size of the disturbance, select "Table 2". Table 2 18. Consistent with Part III.B.1.c.i. of GP-0-25-001, provide a concise overview of the project. Describe existing and proposed conditions, and include any other relevant information. The project proposes a redevelopment project with a 3-story 25,000 SF footprint multi- family residence. There is an existing mansion on site that will be renovated to include additional multi-family units. Additionally, there will be parking lots, new utility connections, stormwater management systems, and overall site grading involved in this project Enter the total project site acreage, the acreage to be disturbed, and the future impervious area (acreage) within the disturbed area, rounded to the nearest tenth of an acre. 19. Total Site Area (acres) 16.2 20. Total Area to be Disturbed (acres) 5.4 21. Existing Impervious Area to be Disturbed (acres) 0.8 22. Future Impervious Area Within Disturbed Area (acres) 3.0 Nature of the project: Redevelopment with increase in impervious area 23. Do you plan to disturb more than 5 acres of soil at any one time? No https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 4/10 Page 411 of 1174