Text · page 412 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1 24. Indicate the percentage (%) of each Hydrologic Soil Group(HSG) at the site. A (%) 0 B (%) 0 C (%) 0 D (%) 100 25. Enter the planned start and end dates of the disturbance activities. Start Date 09/01/2027 End Date 03/01/2028 26. Identify the nearest surface waterbody(ies) to which construction site runoff will discharge. Cayuga Creek, Lower, and tribs - 0103-0007 27. Type of waterbody identified in question 26? River Off Site 28. Has the surface waterbody in question 26 been identified as a 303(d) segment in Appendix D of GP-0-25-001? No 29. Is this project located in one of the Watersheds identified in Appendix C of GP-0- 25-001? No 30. Will the project disturb soils within a State regulated wetland or the protected 100 foot adjacent area? No 31. Does the site runoff enter a separate storm sewer system (including roadside drains, swales, ditches, culverts, etc)? No 32. Will future use of this site be an agricultural property as defined by the NYS Agriculture and Markets Law? No https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 5/10 Page 412 of 1174