Text · page 413 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1 33. Is this property owned by a state authority, state agency, federal government or local government? No Required SWPPP Components General SWPPP Requirements 34. Has a SWPPP been developed in conformance with the requirements in Part III. of GP-0-25-001? Yes 35. Does the SWPPP demonstrate consideration of the future physical risks due to climate change pursuant to the CRRA, 6 NYCRR Part 490, and associated guidance per Part III.A.2. of GP-0-25-001? Yes 36. Has the required Erosion and Sediment Control component of the SWPPP been developed in conformance with the current NYS Standards and Specifications for Erosion and Sediment Control (aka Blue Book)? Yes 37. Has the post-construction stormwater management practice component of the SWPPP been developed in conformance with the NYS Stormwater Management Design Manual? Yes 37.a. Which version of the NYS Stormwater Management Design Manual was used to develop the SWPPP? 2024 SWPPP Preparer 39. The Stormwater Pollution Prevention Plan (SWPPP) was prepared by: Professional Engineer (P.E.) 40. Name of the person who prepared the SWPPP Kristopher Winkler 41. SWPPP Preparer Organization Name LaBella Associates 42. SWPPP Preparer Contact Information First and Last Name Phone E-mail Kristopher Winkler 7167683411 [email protected] https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 6/10 Page 413 of 1174