Text · page 415 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1 Water Quality Criteria 49. Water Quality Sizing Criteria Total WQv Total RRv Minimum Total WQv Sum of RRv required provided RRv (acre- provided and WQv (acre-feet) (acre-feet) feet) (acre-feet) provided 0.24 0.03 0.03 0.21 0.24 Water Quantity Criteria 50. Per Section 9.2.1.C.VI and VII of the 2024 Design Manual, is there 0% change to hydrology that increases the discharge rate and volume from the project site? Yes Operation and Maintenance 53. Has a long-term Operation and Maintenance Plan for the post-construction stormwater management practice(s) been developed? Yes 53.a. Identify the entity responsible for the long-term Operation and Maintenance. Property Owner Post-Construction SMP Identification 54. Post-Construction RR Techniques and Standard SMPs RR Techniques and Contributing Impervious Area Total Contributing Area SMPs (acres) (acres) Filtration Bioretention 1.0 (F-5) 55. Alternative SMPs Contributing Type of Manufacturer of the Name of the Impervious Area Alternative SMP Alternative SMP Alternative SMP (acres) Barracuda Max Hydrodynamic ADS 2.28 S6 Other Permits 56. Identify other permits, existing and new, that are required for this project/facility. None https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 8/10 Page 415 of 1174