Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 533 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates  Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC  Page 66

  Summary for Subcatchment PS-2:

Runoff  =  11.08 cfs @ 12.04 hrs, Volume=  0.674 af, Depth= 4.75"
  Routed to Pond CH-1 : Chambers

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"

  Area (sf)  CN  Description
  64,548  98  Paved parking, HSG D
  9,657  80  >75% Grass cover, Good, HSG D
  74,205  96  Weighted Average
  9,657  13.01% Pervious Area
  64,548  86.99% Impervious Area

  Tc Length  Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  6.0  Direct Entry, Direct

  Subcatchment PS-2:
  Hydrograph

  12  Runoff
  11.08 cfs
  11  NY-West Seneca 24-hr S1 100-yr
  10  Rainfall=5.22"
  Runoff Area=74,205 sf
  9
  Runoff Volume=0.674 af
  8
  Runoff Depth=4.75"
  Tc=6.0 min
  Flow (cfs)

  7

  6  CN=96
  5

  4

  3

  2

  1

  0
  0  2 4  6  8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
  Time (hours)

  Page 533 of 1174