Isolator Row Plus Inspection/Maintenance
Inspection  via a manhole(s) located on the end(s) of the row for
The frequency of inspection and maintenance varies  cleanout. If entry into the manhole is required, please
by location. A routine inspection schedule needs to  follow local and OSHA rules for a confined space
be established for each individual location based  entry.
upon site specific variables. The type of land use  Maintenance is accomplished with the JetVac
(i.e. industrial, commercial, residential), anticipated  process. The JetVac process utilizes a high pressure
pollutant load, percent imperviousness, climate,  water nozzle to propel itself down the Isolator Row
etc. all play a critical role in determining the actual  Plus while scouring and suspending sediments.
frequency of inspection and maintenance practices.  As the nozzle is retrieved, the captured pollutants
At a minimum, StormTech recommends annual  are flushed back into the manhole for vacuuming.
inspections. Initially, the Isolator Row Plus should  Most sewer and pipe maintenance companies have
be inspected every 6 months for the first year of  vacuum/JetVac combination vehicles. Selection of an
operation. For subsequent years, the inspection  appropriate JetVac nozzle will improve maintenance
should be adjusted based upon previous observation  efficiency. Fixed nozzles designed for culverts or large
of sediment deposition.  diameter pipe cleaning are preferable. Rear facing
  jets with an effective spread of at least 45” are best.
The Isolator Row Plus incorporates a combination  StormTech recommends a maximum nozzle pressure
of standard manhole(s) and strategically located  of 2000 psi be utilized during cleaning. JetVac reels
inspection ports (as needed). The inspection ports  can vary in length. For ease of maintenance, ADS
allow for easy access to the system from the surface,  recommends Isolator Row Plus lengths up to 200'
eliminating the need to perform a confined space  (61 m). The JetVac process shall only be performed
entry for inspection purposes.  on StormTech Isolator Row Plus that have ADS
If upon visual inspection it is found that sediment  Plus Fabric (as specified by StormTech) over their
has accumulated, a stadia rod should be inserted to  angular base stone.
determine the depth of sediment. When the average
depth of sediment exceeds 3" (75 mm) throughout
the length of the Isolator Row Plus, clean-out should
be performed.

Maintenance
The Isolator Row Plus was designed to reduce the cost
of periodic maintenance. By “isolating” sediments
to just one row, costs are dramatically reduced
by eliminating the need to clean out each row of
the entire storage bed. If inspection indicates the
potential need for maintenance, access is provided

StormTech Isolator Row Plus (not to scale)

  3