Isolator Row Plus Step By Step Maintenance Procedures
Step 1
Inspect Isolator Row Plus for sediment.
  A) Inspection ports (if present)
  i. Remove lid from floor box frame
  ii. Remove cap from inspection riser
  iii.	Using a flashlight and stadia rod,measure depth of sediment and record results on maintenance log.
  iv.	If sediment is at or above 3 inch depth, proceed to Step 2. If not, proceed to Step 3.
  B) All Isolator Row Plus
  i.	Remove cover from manhole at upstream end of Isolator Row Plus
  ii. Using a flashlight, inspect down Isolator Row Plus through outlet pipe
  1.	Mirrors on poles or cameras may be used to avoid a confined space entry
  2.	Follow OSHA regulations for confined space entry if entering manhole
  iii.	If sediment is at or above the lower row of sidewall holes (approximately 3 inches), proceed to Step
  2.
  If not, proceed to Step 3.

Step 2
Clean out Isolator Row Plus using the JetVac process.
 A) A
   fixed floor cleaning nozzle with rear facing nozzle spread of 45 inches or more is preferable
 B) Apply multiple passes of JetVac until backflush water is clean
 C) Vacuum manhole sump as required

Step 3
Replace all caps, lids and covers, record observations and actions.

Step 4
Inspect & clean catch basins and manholes upstream of the StormTech system.

  1) B)  2  1) A)

  4

Sample Maintenance Log
  Stadia Rod Readings  Sedi-
  Fixed point  ment
  Date  Fixed point  Observations/Actions  Inspector
  to top of
  to chamber  Depth
  sediment
  bottom (1)  (1)–(2)
  (2)
 3/15/11  6.3 ft  none  New installation. Fixed  DJM
  point is CI frame at grade

 9/24/11  6.2  0.1 ft  Some grit felt  SM

 6/20/13  5.8  0.5 ft  Mucky feel, debris visible  NV
  in manhole and in Isolator
  Row Plus, maintenance due  adspipe.com
 7/7/13  6.3 ft  0  System jetted and  DJM  800-821-6710
  vacuumed

ADS “Terms and Conditions of Sale” are available on the ADS website, www.adspipe.com
The ADS logo, StormTech®, the Isolator ® Row Plus and the Green Stripe are registered trademarks of Advanced Drainage Systems, Inc.
© 2025 Advanced Drainage Systems, Inc. #11081 5/25 CS