Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 705 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

24-4113 WEST SENECA EXCHANGE EXISTING  Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design  Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC  Page 8

  Summary for Subcatchment 1S: Existing - West

Runoff  =  3.92 cfs @ 12.15 hrs, Volume=  0.310 af, Depth= 0.65"
  Routed to Link 4L : TOTAL EXISTING

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 1-Year Rainfall=1.87"

  Area (ac)  CN  Description
  1.250  98  Water Surface, HSG D
  4.450  80  >75% Grass cover, Good, HSG D
  5.700  84  Weighted Average
  4.450  78.07% Pervious Area
  1.250  21.93% Impervious Area

  Tc Length Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  20.6  160 0.0280  0.13  Sheet Flow, grass
  Grass: Dense n= 0.240 P2= 2.50"

  Subcatchment 1S: Existing - West
  Hydrograph

  Runoff
  3.92 cfs
  4
  Type II 24-hr
  1-Year Rainfall=1.87"
  3  Runoff Area=5.700 ac
  Runoff Volume=0.310 af
  Flow (cfs)

  Runoff Depth=0.65"
  2  Flow Length=160'
  Slope=0.0280 '/'
  Tc=20.6 min
  1
  CN=84

  0
  0  2  4  6  8  10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
  Time (hours)

  Page 705 of 1174