Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 773 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design  Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC  Page 38

  Summary for Subcatchment 6S: DA Uncontrolled

[47] Hint: Peak is 288% of capacity of segment #3

Runoff  =  63.19 cfs @ 12.04 hrs, Volume=  3.439 af, Depth= 3.64"
  Routed to Pond 16P : OUTLET PIPE

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"

  Area (ac)  CN  Description
  7.720  98  Paved parking, HSG D
  1.500  80  >75% Grass cover, Good, HSG D
  2.120  98  Roofs, HSG D
  11.340  96  Weighted Average
  1.500  13.23% Pervious Area
  9.840  86.77% Impervious Area

  Tc Length Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec)  (cfs)
  1.8  100 0.0100  0.92  Sheet Flow, pavement
  Smooth surfaces n= 0.011 P2= 2.50"
  1.1  170 0.0150  2.49  Shallow Concentrated Flow, PVMT
  Paved Kv= 20.3 fps
  3.1  580 0.0040  3.10 21.94 Pipe Channel, 36" Pipe
  36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
  n= 0.025 Corrugated metal
  6.0  850 Total

  Page 773 of 1174