Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 779 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design  Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC  Page 44

  Summary for Subcatchment 15S: PDA-3

Runoff  =  1.24 cfs @ 12.03 hrs, Volume=  0.059 af, Depth= 2.73"
  Routed to Pond 18P : POND

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"

  Area (sf)  CN  Description
  7,225  80  >75% Grass cover, Good, HSG D
  4,150  98  Paved parking, HSG D
  11,375  87  Weighted Average
  7,225  63.52% Pervious Area
  4,150  36.48% Impervious Area

  Tc Length  Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  5.0  Direct Entry,

  Subcatchment 15S: PDA-3
  Hydrograph

  Runoff
  1.24 cfs
  NY-WestSeneca_NOAA14 24-hr S1 25-yr
  Rainfall=4.10"
  Runoff Area=11,375 sf
  1  Runoff Volume=0.059 af
  Runoff Depth=2.73"
  Tc=5.0 min
  CN=87
  Flow (cfs)

  0
  0  10  20  30  40  50  60  70  80  90  100  110  120  130  140  150
  Time (hours)

  Page 779 of 1174