105  RUNOFF COEFFICIENT, SOILS, AND RAINFALL INFORMATION

  The initial runoff curve number for the pre-construction site is "CN" = 96. The post-construction runoff
  curve number for the site will be "CN" = 96. The site is 56 acres of which approximately 27.71 acres will
  be disturbed by construction activities.

  See soils information located in Appendix H.

  The site is in Erie County, which receives an average of approximately 45 inches rainfall annually with the
  highest amounts of rainfall received in the months of May thru September. Annual snow for this area is
  approximately 120 inches.

106  WATERS

  Existing site drainage generally flows to two primary drainage areas. The western portion of the site
  drains toward Slade Avenue, while the remainder of the site is collected by an existing network of catch
  basins that ultimately discharge through a large storm sewer outlet located near the north central portion
  of the site. This outlet conveys runoff directly to Cazenovia Creek.

107  INDIAN COUNTRY LANDS

  This project is not located on Indian Lands.

108  ENDANGERED AND THREATENED SPECIES

  No endangered or threatened species have been determined to be on the site.

109  CRITICAL HABITAT

  See section 108 above.

110  HISTORIC PLACES

  The assessed property is not shown on the NYSHPO map as an archeologically sensitive area. A review by
  NYSHPO was conducted, a copy of their review and clearance letter is included in Appendix K of this
  report.

111  WETLANDS AND/OR OTHER SURFACE WATERS

  There are no known wetlands located on site. See Appendix L for NYSDEC Environmental Resource
  Mapper.

112  EROSION AND SEDIMENT CONTROLS

  112.1  STABILIZATION PRACTICES

  Stabilization practices for this site include:

  A.  Land clearing activities shall be done only in areas where earthwork will be performed and shall
  progress as earthwork is needed.

  B.  Use of stabilization method for all slopes having a slope greater than 1V:3H.