stabilization measures have been applied to all disturbed areas. The forms found in this SWPPP shall be
  used by the inspectors to inventory and report the condition of each measure to assist in maintaining the
  erosion and sediment control measures in good working order.

  These report forms shall become an integral part of the SWPPP and shall be made readily accessible to
  governmental inspection officials, the Operator’s Engineer, and the Operator for review upon request
  during visits to the project site. In addition, copies of the reports shall be provided to any of these
  persons, upon request, via mail or facsimile transmission. Inspection and maintenance report forms are to
  be maintained by the permittee for five years following the final stabilization of the site.

117  OTHER RECORD-KEEPING REQUIREMENTS

  The Contractor shall keep the following records related to construction activities at the site:

  •  Dates when major grading activities occur and the areas which were graded

  •  Dates and details concerning the installation of structural controls

  •  Dates when construction activities cease in an area

  •  Dates when an areas is stabilized, either temporarily or permanently

  •  Dates of rainfall and the amount of rainfall

  •  Dates and descriptions of the character and amount of any spills of hazardous materials

  •  Records of reports filed with regulatory agencies if reportable quantities of hazardous materials
  spilled

118  SPILL PREVENTION CONTROL AND COUNTERMEASURES (SPCC) PLAN

  118.1  MATERIALS COVERED

  The following materials or substances are expected to be present onsite during construction:

  •  Concrete/Additives/Wastes
  •  Cleaning solvents
  •  Sanitary wastes
  •  Detergents
  •  Petroleum based products
  •  Paints/Solvents
  •  Pesticides
  •  Solid and construction wastes
  •  Acids
  •  Fertilizers
  •  Soil stabilization additives

  118.2  MATERIAL MANAGEMENT PRACTICES

  The following are the material management practices that will be used to reduce the risk of spills or
  other accidental exposure of materials and substances to stormwater runoff. The job site superintendent
  will be responsible for ensuring that these procedures are followed.

  A.  Good Housekeeping

West Seneca Exchange
07/20/2026
Page 19 of 24

  Page 840 of 1174