Text · page 3 of 91
Read the whole document on one page (all 91 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Dynamic Engineering Cons ultants, P.C. November 2, 2026 The proposed developme Page 2 of 2 nt includes a 273,000 140,000 SF lay down pav SF manufacturing/warehou ement area. The property se building and Site in the BRA-Mi (Medium is Split Zoned, with the wes Industrial) Zoning District whi ter n portion of the (Light Industrial) Zoning Dist le the Gastern portion is in the rict. A majority of the pro posed building is within the BRA-LI Zoning district boundary, whi approximate L| le the remaining portion of is within the BRA-MI district the building, and the entire . The LI district recognize laydown area Warehousing as a Specia s Manufacturing as a Per l Use Permit. The MI dist mit ted Use, and use, warehousing as a Spe rict recognizes Manufactu cial use permit, and outdoo ring as permitted r storage as a permitted use , The LI district permits bui lding height up to 45 F'T/3s height up to 60 FT. The tories, while the Mi district Proposed building anticipat permits building es a building height of app rox. 60 FT which district. Additional improvements to the site to include employ landscaping, walkways, sto ee/visitor Parking with AD rmwater management faci A access, lighting, lities, utilities and other ass ociated items. Should you have any questi ons, comments or require hesitate to contact the und additional information, ple ersigned. ase do not Sincerely, Principal _