Text · page 4 of 91
Read the whole document on one page (all 91 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
DYNAMIC See" PRELIMINARY AND FINAL SITE PLAN S| FOR J.G. PETRUCCI CO., INC. PROPOSED MANUFACTURING/WAREHOUSE DEVELOPMENT SECTION 141.19, BLOCK 1, LOT 3 2303 HAMBURG TURNPIKE CITY OF LACKAWANNA ERIE COUNTY, NEW YORK PREPARED BY DYNAMIC ENGINEERING CONSULTANTS, P.C. 50 PARK PLACE - SUITE 901 NEWARK, NJ 07102 WWW.DYNAMICEC.COM