Southtowns Record

February 17, 2026 Minutes

Government
Town of Elma
Board
Planning Board
Meeting
Feb 17, 2026
Kind
Minutes
Topics
Zoning and land use, Water, sewer and drainage, Public safety

Original document

Same meeting

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. applicant representative. Mr. Cirocco made a motion to check box #2 on the SEQR, the motion was seconded by Mr. Lembke. Yes-6 No-0 Motion Carried

    Carried · Moved by Mr. Cirocco, seconded by Mr. Lembke

    Page 2 of the minutes, motion 2

  2. A motion was made by Gregory Merkle and Seconded by James Millard to give final site plan approval contingent on a letter of approval from Elma Water. Yes-6- No-0 Motion Carried

    Carried · Moved by Gregory Merkle, seconded by James Millard

    Page 2 of the minutes, motion 3

  3. The EPB reviewed the short form SEQR. Mr. Cirocco made a motion to check box #2 on the SEQR; the motion was seconded by Mr. Millard. Yes-6 No-0 Motion Carried

    Carried · Moved by Mr. Cirocco, seconded by Mr. Millard

    Page 3 of the minutes, motion 4

  4. A motion was made by Robert Waver and Seconded by James Lembke to give final site plan approval Yes-6- No-0 Motion Carried

    Carried · Moved by Robert Waver, seconded by James Lembke

    Page 3 of the minutes, motion 5

1 routine motion (minutes, bills, agenda, adjournment…)
  1. Mr. Putzbach motioned to approve the Minutes of the EPB Regular Meeting held on November 18, 2025. Mr. Waver 2nd motion. Motion approved.

    Carried · Moved by Mr. Putzbach

    Page 1 of the minutes, motion 1

Text · page 2 of 3

Read the whole document on one page (all 3 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Town of Elma Planning Board Minutes (2/17/2026)
  Page 2

I.  Site Plan Review for_an addition for St. Paul’s Lutheran Church @ 370 Main St
  (Continued)  Applicant- Robert Breidenstein

  Approvals and Documentation

  e  The fire department's approval was received via email.
  e  Erie County approvals, including the septic design, have been submitted.
  e A letter from the Elma Water Department was referred to but not included in the board’s
  packet.
  e  There was discussion about whether a drainage district is needed.
  e  Town engineer verbally approved the drainage

The EPB reviewed the short form SEQR. The answers for question #12 & #13 were changed and initialed by the
applicant representative. Mr. Cirocco made a motion to check box #2 on the SEQR, the motion was seconded by
Mr. Lembke.  Yes-6 No-0 Motion Carried

A motion was made by Gregory Merkle and Seconded by James Millard to give final site plan approval
contingent on a letter of approval from Elma Water.  Yes-6- No-0 Motion Carried

Ill.  Site Plan Review for adding a 9 vs 9 soccer field @ 7110 Seneca St for Sahlen’s Sports
  Park  Applicant Jim Bammel

Applicant: Jim Bammel of Bammel Architects representing Sahlen’s for athletic fields at 7110 Seneca
Street.

  e  The plan includes improved drainage with better grading; roadside cut directs flow back toward
  the field; field graded at ~8% pitch suitable for professional turf; series of flat drains leading
  west to a drainpipe to an existing ditch.
  e  Fencing for softball with a 4-foot fence at the home run wall. A temporary fence will allow for an
  overlay soccer field.
  e  Lighting: 60-foot poles; fixtures include heads at top and lower mounts; coverage guaranteed
  for play. Dark sky compliance: Dark sky friendly; light spill under 1 foot-candle at the street; all
  fixtures shielded.
  e  Parking: The design includes additional parking near the field for teams. The parking ties into
  existing parking lot and parking is considered sufficient. Practical considerations: Attendees
  will park where convenient. Overload parking is located closer to the field; street parking not
  sensible; property access is at the far end.
  e  Applicant reaffirmed parking for both teams available near the field on overload.
  e  Existing house: Remains on property
  e  Fire department access: Marked N/A due to open site and multiple access points; no
  structures necessitating specific fire access.
  e  Aspecial use permit required for the project has already been approved by Elma Town Board