Text · page 3 of 4
Read the whole document on one page (all 4 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Town of Elma Planning Board Minutes (3/17/2026) Page 3 Vz Sketch plan review to convert an existing 2-unit dwelling to a 4-unit dwelling @ 6177 Seneca St Applicant Todd Huber Mr. Huber presented a project to redevelop a property on Seneca Street into a four-unit apartment building by renovating an existing post-and-beam structure that used to be a church. This project falls under a special procedure requiring Town Board approval, with the Planning Board’s role being to provide a recommendation. The applicant plans to combine two lots (6175 & 6177 Seneca Street) but noted the project cannot meet several design standards in the Spring Brook overlay code, such as minimum lot depth and maximum impervious lot coverage (estimated at 75-80%). They decided to recommend approval to the Town Board, suggesting that the non-compliant items be “grandfathered” or waived, and stipulating that the lot combination is a necessary contingency. e The existing building is approximately nineteen hundred square feet per floor. It will have a loft on the third floor; The building will need to have sprinklers. The project involves renovating an existing building, which will not meet code for lot depth and will exceed the 50% maximum impervious surface limit (estimated at 75-80%). The board felt these deviations were acceptable and could be “grandfathered.” The approval process falls under a special procedure. The Planning Board’s official action is to make a formal recommendation, after which the Town Board will hold a public hearing (scheduled for mid- April 2026) A key contingency for the project is the legal combination of the two separate parcels (6175 and 6177 Seneca Street) into a single lot. A drainage district will need to be formed for the new combined parcel and will need the approval from the town engineer for the drainage plan. It was noted that the building-mounted lighting and proposed parking were satisfactory If the new garage does not meet the required 10” set back the applicant will be required to seek a variance for the new garage’s rear setback. EPB reviewed the planning board checklist: Documentation: Applicant has applied to the Elma Town Board for a preliminary use permit. The Elma town Board needs to hold a public hearing before the project can be approved Zoning: property is zoned C-1 and is in the Spring Brook Multiple Dwelling Overlay Site & Building Details: Wil| need a new stamped survey showing combined properties, property details and layout of multiple buildings provided. It is an existing building so no engineered blueprints are needed. A proposed picture of the exterior was provided. Layout/details of individual units not provided. Lighting: No details of lighting on the plans. Applicant says no lighting beyond what is existing Parking: No new curb cut. The applicant plans to build a 5-car garage. 4 spaces will be used for the multi- dwelling building and 1 for the other single-family residence on the property. A variance from the zoning board will be needed for the new garage setback if it does not meet the required 10’ from the back property line. No blueprints or information about the new garage were provided. Applicant says it will have vinyl siding and brick. Drainage: No wetlands on the property. Will need approval from the town engineer. Will need to form a drainage district for the new parcel.