Text · page 2 of 4
Read the whole document on one page (all 4 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Town of Elma Planning Board Minutes (3/17/2026) Page 2 II. Site plan review for a shed display for Macaluso’s Garage @ 5710 Seneca St Applicant Jay Macaluso e The board reviewed a site plan presented by Jay Macaluso and his tenant, Brian Reinford of Northwood Structures, to display 10-12 sheds for sale at 5710 Seneca Street. ¢ The property owner, Mr. Macaluso, is downsizing the car and RV sales business and will use the space to display sheds for Northwood Structures, a small family business. e The display is for sales purposes only; there will be no permanent office on-site. Signage will be limited to temporary banners and small signs on the sheds indicating size and price. e A key discussion point was an old, unused driveway on the property that people use as a cut-through. The applicant agreed to the board’s recommendation to remove the old pavement and plant grass to block access and improve aesthetics. e The board reviewed the site plan checklist, noting the approval does not require a letter from the fire department as the access and use are not significantly changing. A motion was made by Michael Cirocco and Seconded by Charles Putzbach to give preliminary site plan approval Yes-4 No-0 Motion Carried A motion was made by James Lembke and Seconded by Charles Putzbach to give final site plan approval Yes-4 No-0 Motion Carried IV. Site plan review for a 31,000 S. F. addition to Crossroads Christian Church @ 1050 Girdle Rd Applicant Pat Kleitz Pastor Pat Kleitz and Douglas Klotzbach from K2 Architecture presented the site plan. The church expansion, a project 38 years in the making, involves a 31,000 sq ft addition to create a large auditorium and gymnasium complex. The new facility, connected to the existing building via a lobby, will have a combined seating capacity of 1,400 for special events like high school graduations. This was made possible by acquiring and merging an adjacent lot to create a 14-acre property, complying with the 15% building coverage limit. The board reviewed detailed architectural plans, discussed potential community use, and addressed concerns about traffic for large events. Following a thorough review of the preliminary site plan, which included discussions on parking calculations, drainage district requirements, and exterior finishes, the board granted preliminary approval. The applicant was given clear instructions on items needed for final approval, such as obtaining letters from the water, health, and fire departments. e The architectural design connects a new pre-engineered steel building to the existing structure via a new lobby. The new building’s roofline is lowered to complement the original church aesthetically. e For final approval, the applicant must provide detailed parking calculations, investigate the creation or extension of a drainage district for the property, and obtain approval letters from the Elma Water Department, Erie County Health Department, and the local fire department. e They must provide detailed renderings showing exterior colors and materials, including a planned outdoor pavilion. e A motion was made by James Millard and Seconded by James Lembke to give preliminary site plan approval Yes-4 No-0 Motion Carried