WATER SERVICE SIZING CALCULATION & JUSTIFICATION
  Domestic Water Service — Submitted for Site Plan Review
 Project  4350 Seneca Street Building Addition
 Location  4350 Seneca Street, West Seneca, NY 14224 (Erie County)
 Prepared for  Havens Holding Group
 Prepared by  Jason Havens, P.E., Principal Civil Design — NYS Lic. No. 090335 (Exp. 12/31/2026)
 Date  July 26, 2026
 Reviewing authority  Town of West Seneca · Water purveyor: Erie County Water Authority

1. Purpose & Scope
This calculation demonstrates that the existing one-inch (1") domestic water service is adequate to serve the
proposed building addition under its intended pattern of occupancy, and documents a recommended basis for
future upsizing should occupancy, demand, or funding conditions change. Scope is limited to the domestic water
service (public main to the building meter/entry); interior distribution is confirmed at the plumbing permit stage,
and no fire-protection demand is included (Section 8).

2. Code Basis & References
  ●  NYS Plumbing Code (IPC-based) — §604.3 fixture flow-pressure requirements; §604.8 PRV threshold;
  §606.5 booster/pressure requirements.
  ●  IPC Appendix E — segmented-loss sizing method and pressure-balance relationship; Tables E103.3(2)/(3)
  — WSFU load values and WSFU-to-demand conversion (Hunter's curve).
  ●  Hazen-Williams friction relation; 8 ft/s cold-water velocity ceiling. Where purveyor standards are more
  restrictive than the model code, the purveyor's standards govern.

3. Existing Service & Design Criteria
 Parameter  Value  Source / note
 Existing service — material & size  1" copper, Type L  confirmed (existing)
 Service internal diameter  1.025 in  Type L bore
 Hazen-Williams C  140  copper
 Service developed length  90 ft (developed)  incl. fitting allowance —
  confirmed
 Min. daily available pressure  67 psi  purveyor / project data
 Static (no-flow) pressure  72 psi  purveyor / project data
 Highest fixture above service entry  13 ft — 2nd-floor office (non-  see Section 7 note
  governing)
 Water meter loss @ design flow  2.5 psi  displacement meter
 Backflow assembly  None  no assembly on this
  service
 Velocity ceiling  8 ft/s  cold-water service
 Predominant flushing system  Flush tanks  governs demand curve

4. Fixture Schedule & WSFU Tally
Brewery fill offset. Brewery fill demand occurs within the daytime occupancy over a discrete ~45-minute fill
window during which the kitchen does not operate. The brewery fill therefore directly offsets the kitchen / break-
sink demand within Group A and is not additive to the group's peak fixture-unit load.